<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>http://ocotal.iarc.uaf.edu/api.php?action=feedcontributions&amp;feedformat=atom&amp;user=137.229.29.223&amp;*</id>
	<title>IARC 207 Wiki - User contributions [en]</title>
	<link rel="self" type="application/atom+xml" href="http://ocotal.iarc.uaf.edu/api.php?action=feedcontributions&amp;feedformat=atom&amp;user=137.229.29.223&amp;*"/>
	<link rel="alternate" type="text/html" href="http://ocotal.iarc.uaf.edu/index.php?title=Special:Contributions/137.229.29.223"/>
	<updated>2026-04-19T23:06:50Z</updated>
	<subtitle>User contributions</subtitle>
	<generator>MediaWiki 1.34.2</generator>
	<entry>
		<id>http://ocotal.iarc.uaf.edu/index.php?title=2016_NGEE_August_Nome_Trip&amp;diff=2751</id>
		<title>2016 NGEE August Nome Trip</title>
		<link rel="alternate" type="text/html" href="http://ocotal.iarc.uaf.edu/index.php?title=2016_NGEE_August_Nome_Trip&amp;diff=2751"/>
		<updated>2016-07-29T23:55:06Z</updated>

		<summary type="html">&lt;p&gt;137.229.29.223: /* Second Trip To Do List: */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;===Second Trip:===&lt;br /&gt;
'''August 11 - 19'''&lt;br /&gt;
&lt;br /&gt;
===Second Trip To Do List:===&lt;br /&gt;
* @ Teller&lt;br /&gt;
** Lower Station turn into full met 3m tripod located closer to shrubs&lt;br /&gt;
*** soil pit&lt;br /&gt;
*** 1.5m soil temps?&lt;br /&gt;
*** snow&lt;br /&gt;
*** radiation&lt;br /&gt;
*** probably split off surface water sensors onto a different logger (maybe the cr800 up top or else a new one)&lt;br /&gt;
*** airtemp &amp;amp; Precip&lt;br /&gt;
*** 3m anemometer&lt;br /&gt;
*** use self tapping screw to keep animals from removing precip bucket lid.&lt;br /&gt;
** Upper station &lt;br /&gt;
*** soil pit in the low area &lt;br /&gt;
*** new solar panel&lt;br /&gt;
*** real batteries in a battery box&lt;br /&gt;
*** super animal protection.&lt;br /&gt;
** Survey in and place the two hobo pressure transducers somewhere in the watershed up stream from the main site.&lt;br /&gt;
&lt;br /&gt;
* @ Kougraok M64&lt;br /&gt;
** if we get permission then site at the top perhaps?&lt;br /&gt;
** If no permission then adjacent to the GIPL Pilgrim site?&lt;br /&gt;
* Existing Sites @ Kougarok&lt;br /&gt;
** Remove lowest section of K-met Tower?&lt;br /&gt;
** Level radiometers&lt;br /&gt;
** level precip buckets&lt;br /&gt;
** general sensor refresh&lt;br /&gt;
&lt;br /&gt;
* Existing Sites @ Council&lt;br /&gt;
** Remove lowest section of Tower? @ blueberry hill&lt;br /&gt;
** Level radiometers&lt;br /&gt;
** level precip buckets&lt;br /&gt;
** general sensor refresh&lt;br /&gt;
** spend one or two nights with Mike Murphy to reduce travel times?&lt;br /&gt;
** radiometer setup to Grid site&lt;br /&gt;
** put in ground control point&lt;br /&gt;
&lt;br /&gt;
New ~mile 60 Kougarok site&lt;br /&gt;
* radiation&lt;br /&gt;
* heat flux&lt;br /&gt;
* put in ground control point&lt;br /&gt;
*&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
====8/11====&lt;br /&gt;
* Arrive @ around Noon&lt;br /&gt;
* Pick up vehicle&lt;br /&gt;
* Pick up freight&lt;br /&gt;
* Visit Anvil Mountain and swap out batteries.&lt;br /&gt;
* Get groceries&lt;br /&gt;
* Pack vehicle for 8/12&lt;br /&gt;
* Pick up freight &lt;br /&gt;
** bring teller coded gear to Bering Air&lt;br /&gt;
&lt;br /&gt;
====8/12 &amp;amp; 8/13====&lt;br /&gt;
'''(I think this may take more than two days)'''&lt;br /&gt;
* Go to Teller&lt;br /&gt;
* @Top Put up permanent site&lt;br /&gt;
** tripod&lt;br /&gt;
** camera&lt;br /&gt;
** batteries&lt;br /&gt;
** battery box&lt;br /&gt;
** solar panel&lt;br /&gt;
** logger&lt;br /&gt;
** radiometer&lt;br /&gt;
** additional box for multiplexer&lt;br /&gt;
** multiplexer&lt;br /&gt;
** Met Sensors&lt;br /&gt;
*** AT/RH &lt;br /&gt;
*** RM Young WS/WD&lt;br /&gt;
*** Snow Depth&lt;br /&gt;
*** Precipitation?&lt;br /&gt;
** Soil Pit&lt;br /&gt;
*** SDI12 Soil Moisture&lt;br /&gt;
*** Soil Thermal Conductivity&lt;br /&gt;
*** Heat Flux Plate&lt;br /&gt;
** 1.5m Soil temperature?&lt;br /&gt;
** Cable Armoring for everything exposed&lt;br /&gt;
** Reuse for SW station:&lt;br /&gt;
*** small battery &lt;br /&gt;
*** small solar panel &lt;br /&gt;
*** CR800&lt;br /&gt;
* @ SW station&lt;br /&gt;
** Move instrument box to the small stand&lt;br /&gt;
** Reprogram CR800 &amp;amp; power back up. (I'm still torn on doing this this year or next year...)&lt;br /&gt;
* @ Snowmelt Logger&lt;br /&gt;
** Reuse Snowmelt Yellow box &amp;amp; Logger for permanent site.&lt;br /&gt;
** Met Sensors&lt;br /&gt;
*** AT/RH &lt;br /&gt;
*** RM Young WS/WD&lt;br /&gt;
*** Snow Depth&lt;br /&gt;
** Soil Pit&lt;br /&gt;
*** SDI12 Soil Moisture&lt;br /&gt;
*** Soil Thermal Conductivity&lt;br /&gt;
*** Heat Flux Plate&lt;br /&gt;
** 1.5m Soil temperature?&lt;br /&gt;
** tripod&lt;br /&gt;
** camera&lt;br /&gt;
** batteries&lt;br /&gt;
** battery box&lt;br /&gt;
** solar panel&lt;br /&gt;
** Cable Armoring for everything exposed&lt;br /&gt;
* Use Survey GPS to lock in positions of all instrumentation (before move and after!)&lt;br /&gt;
* Make a discharge measurement&lt;br /&gt;
* Level precip bucket&lt;br /&gt;
* Bring a drill &amp;amp; self-tapping screw to lock tipping bucket in place.&lt;br /&gt;
&lt;br /&gt;
====8/14 - 8/16 ====&lt;br /&gt;
* '''FUEL UP!!!!'''&lt;br /&gt;
* If the weather cooperates, hike up and visit the Kigluaiks Sites&lt;br /&gt;
** optional, cancel if behind schedule...&lt;br /&gt;
** download data&lt;br /&gt;
** reorient antenna if needed&lt;br /&gt;
** see if there is anything we can take down from the smashed up site&lt;br /&gt;
* Plan A: Recon the Kougarok site&lt;br /&gt;
* Plan B: save Kougarok_m64 site for '17 or put instruments @ Pilgrim hot springs&lt;br /&gt;
* @Kougarok_m64&lt;br /&gt;
** tripod&lt;br /&gt;
*** still mulling this one since we will be dragging all this stuff up the hill.&lt;br /&gt;
** batteries&lt;br /&gt;
** battery enclosure&lt;br /&gt;
** Met Instruments&lt;br /&gt;
*** AT/RH&lt;br /&gt;
*** Precip?&lt;br /&gt;
*** RM Young WS/WD&lt;br /&gt;
*** Snow Depth&lt;br /&gt;
** Soil Pit&lt;br /&gt;
*** SDI12 Soil Moisture&lt;br /&gt;
*** Soil Thermal Conductivity&lt;br /&gt;
*** Heat Flux Plate&lt;br /&gt;
** 1.5m Soil temperature?&lt;br /&gt;
* what am I forgetting here?&lt;br /&gt;
* @ K2 Met&lt;br /&gt;
** Lower the tower to two sections&lt;br /&gt;
** grab data off the storage module&lt;br /&gt;
** sensor refresh&lt;br /&gt;
** AT/RH&lt;br /&gt;
** SR50A&lt;br /&gt;
** Battery&lt;br /&gt;
** better secure the radiation stand to make sure it stays level.&lt;br /&gt;
* @ K3 Mauze Gulch&lt;br /&gt;
** Sensor refresh&lt;br /&gt;
*** AT/RH&lt;br /&gt;
*** SR50A&lt;br /&gt;
*** Battery?&lt;br /&gt;
** Data Download  &lt;br /&gt;
* @ K1 SR50A refresh if time allows&lt;br /&gt;
* Camping Schedule&lt;br /&gt;
** 8/14: Salmon Lake BLM&lt;br /&gt;
** 8/15: Kougarok Cabin&lt;br /&gt;
** 8/16: Kougarok Cabin&lt;br /&gt;
&lt;br /&gt;
====8/17 - 8/18====&lt;br /&gt;
* Drive back to Nome and on to Council&lt;br /&gt;
* Spend two nights @ B&amp;amp;B.&lt;br /&gt;
* Focus on C2 Blueberry site &amp;amp; Tower.&lt;br /&gt;
* make the radiation stand more solid.&lt;br /&gt;
* Lower the tower to 2 sections&lt;br /&gt;
**&lt;br /&gt;
&lt;br /&gt;
===Anemometer notes ===&lt;br /&gt;
Testing each anemometer for &lt;br /&gt;
*propeller torque using anemometer torque disc (18310)&lt;br /&gt;
**factory spec is 2.6 gm-cm (black nylon screw at 5cm and metal screw at 2cm)&lt;br /&gt;
*** 33821 moved with 0.2 gm-cm (a black nylon screw at 2cm radius), so this is much better than factory spec&lt;br /&gt;
*** 61996 moved with 0.5 gm-cm&lt;br /&gt;
**tested both Clock Wise(CW) and Counter Clock Wise (CCW)&lt;br /&gt;
*Wind speed using anemometer drive (18802)&lt;br /&gt;
** @200rpm = 0.98m/s. @1000rpm = 4.9m/s. @2000rpm = 9.8m/s&lt;br /&gt;
**tested both CW and CCW&lt;br /&gt;
*Vane Torque using Vane Torque Gauge (18331)&lt;br /&gt;
**mount the gauge, pull the string, if it moves with &amp;lt; 30 gm-cm of torque, golden.&lt;br /&gt;
**tested both CW and CCW&lt;br /&gt;
*Wind Direction using Vane Angle Fixture Tower Mount (18212)&lt;br /&gt;
** checked 3 directions&lt;br /&gt;
*** 33821 all within 1 degree of accuracy&lt;br /&gt;
*** 61996 reads 3 degrees less (ex: reads 177 when should be 180)&lt;br /&gt;
NEED ONE WIRE (have one)&lt;/div&gt;</summary>
		<author><name>137.229.29.223</name></author>
		
	</entry>
	<entry>
		<id>http://ocotal.iarc.uaf.edu/index.php?title=2016_NGEE_August_Nome_Trip&amp;diff=2750</id>
		<title>2016 NGEE August Nome Trip</title>
		<link rel="alternate" type="text/html" href="http://ocotal.iarc.uaf.edu/index.php?title=2016_NGEE_August_Nome_Trip&amp;diff=2750"/>
		<updated>2016-07-29T23:54:03Z</updated>

		<summary type="html">&lt;p&gt;137.229.29.223: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;===Second Trip:===&lt;br /&gt;
'''August 11 - 19'''&lt;br /&gt;
&lt;br /&gt;
===Second Trip To Do List:===&lt;br /&gt;
* @ Teller&lt;br /&gt;
** Lower Station turn into full met 3m tripod located closer to shrubs&lt;br /&gt;
*** soil pit&lt;br /&gt;
*** 1.5m soil temps?&lt;br /&gt;
*** snow&lt;br /&gt;
*** radiation&lt;br /&gt;
*** probably split off surface water sensors onto a different logger (maybe the cr800 up top or else a new one)&lt;br /&gt;
*** airtemp &amp;amp; Precip&lt;br /&gt;
*** 3m anemometer&lt;br /&gt;
*** use self tapping screw to keep animals from removing precip bucket lid.&lt;br /&gt;
** Upper station &lt;br /&gt;
*** soil pit in the low area &lt;br /&gt;
*** new solar panel&lt;br /&gt;
*** real batteries in a battery box&lt;br /&gt;
*** super animal protection.&lt;br /&gt;
** Survey in and place the two hobo pressure transducers somewhere in the watershed up stream from the main site.&lt;br /&gt;
&lt;br /&gt;
* @ Kougraok M64&lt;br /&gt;
** if we get permission then site at the top perhaps?&lt;br /&gt;
* Existing Sites @ Kougarok&lt;br /&gt;
** Remove lowest section of K-met Tower?&lt;br /&gt;
** Level radiometers&lt;br /&gt;
** level precip buckets&lt;br /&gt;
** general sensor refresh&lt;br /&gt;
&lt;br /&gt;
* Existing Sites @ Council&lt;br /&gt;
** Remove lowest section of Tower? @ blueberry hill&lt;br /&gt;
** Level radiometers&lt;br /&gt;
** level precip buckets&lt;br /&gt;
** general sensor refresh&lt;br /&gt;
** spend one or two nights with Mike Murphy to reduce travel times?&lt;br /&gt;
** radiometer setup to Grid site&lt;br /&gt;
** put in ground control point&lt;br /&gt;
&lt;br /&gt;
New ~mile 60 Kougarok site&lt;br /&gt;
* radiation&lt;br /&gt;
* heat flux&lt;br /&gt;
* put in ground control point&lt;br /&gt;
*&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
====8/11====&lt;br /&gt;
* Arrive @ around Noon&lt;br /&gt;
* Pick up vehicle&lt;br /&gt;
* Pick up freight&lt;br /&gt;
* Visit Anvil Mountain and swap out batteries.&lt;br /&gt;
* Get groceries&lt;br /&gt;
* Pack vehicle for 8/12&lt;br /&gt;
* Pick up freight &lt;br /&gt;
** bring teller coded gear to Bering Air&lt;br /&gt;
&lt;br /&gt;
====8/12 &amp;amp; 8/13====&lt;br /&gt;
'''(I think this may take more than two days)'''&lt;br /&gt;
* Go to Teller&lt;br /&gt;
* @Top Put up permanent site&lt;br /&gt;
** tripod&lt;br /&gt;
** camera&lt;br /&gt;
** batteries&lt;br /&gt;
** battery box&lt;br /&gt;
** solar panel&lt;br /&gt;
** logger&lt;br /&gt;
** radiometer&lt;br /&gt;
** additional box for multiplexer&lt;br /&gt;
** multiplexer&lt;br /&gt;
** Met Sensors&lt;br /&gt;
*** AT/RH &lt;br /&gt;
*** RM Young WS/WD&lt;br /&gt;
*** Snow Depth&lt;br /&gt;
*** Precipitation?&lt;br /&gt;
** Soil Pit&lt;br /&gt;
*** SDI12 Soil Moisture&lt;br /&gt;
*** Soil Thermal Conductivity&lt;br /&gt;
*** Heat Flux Plate&lt;br /&gt;
** 1.5m Soil temperature?&lt;br /&gt;
** Cable Armoring for everything exposed&lt;br /&gt;
** Reuse for SW station:&lt;br /&gt;
*** small battery &lt;br /&gt;
*** small solar panel &lt;br /&gt;
*** CR800&lt;br /&gt;
* @ SW station&lt;br /&gt;
** Move instrument box to the small stand&lt;br /&gt;
** Reprogram CR800 &amp;amp; power back up. (I'm still torn on doing this this year or next year...)&lt;br /&gt;
* @ Snowmelt Logger&lt;br /&gt;
** Reuse Snowmelt Yellow box &amp;amp; Logger for permanent site.&lt;br /&gt;
** Met Sensors&lt;br /&gt;
*** AT/RH &lt;br /&gt;
*** RM Young WS/WD&lt;br /&gt;
*** Snow Depth&lt;br /&gt;
** Soil Pit&lt;br /&gt;
*** SDI12 Soil Moisture&lt;br /&gt;
*** Soil Thermal Conductivity&lt;br /&gt;
*** Heat Flux Plate&lt;br /&gt;
** 1.5m Soil temperature?&lt;br /&gt;
** tripod&lt;br /&gt;
** camera&lt;br /&gt;
** batteries&lt;br /&gt;
** battery box&lt;br /&gt;
** solar panel&lt;br /&gt;
** Cable Armoring for everything exposed&lt;br /&gt;
* Use Survey GPS to lock in positions of all instrumentation (before move and after!)&lt;br /&gt;
* Make a discharge measurement&lt;br /&gt;
* Level precip bucket&lt;br /&gt;
* Bring a drill &amp;amp; self-tapping screw to lock tipping bucket in place.&lt;br /&gt;
&lt;br /&gt;
====8/14 - 8/16 ====&lt;br /&gt;
* '''FUEL UP!!!!'''&lt;br /&gt;
* If the weather cooperates, hike up and visit the Kigluaiks Sites&lt;br /&gt;
** optional, cancel if behind schedule...&lt;br /&gt;
** download data&lt;br /&gt;
** reorient antenna if needed&lt;br /&gt;
** see if there is anything we can take down from the smashed up site&lt;br /&gt;
* Plan A: Recon the Kougarok site&lt;br /&gt;
* Plan B: save Kougarok_m64 site for '17 or put instruments @ Pilgrim hot springs&lt;br /&gt;
* @Kougarok_m64&lt;br /&gt;
** tripod&lt;br /&gt;
*** still mulling this one since we will be dragging all this stuff up the hill.&lt;br /&gt;
** batteries&lt;br /&gt;
** battery enclosure&lt;br /&gt;
** Met Instruments&lt;br /&gt;
*** AT/RH&lt;br /&gt;
*** Precip?&lt;br /&gt;
*** RM Young WS/WD&lt;br /&gt;
*** Snow Depth&lt;br /&gt;
** Soil Pit&lt;br /&gt;
*** SDI12 Soil Moisture&lt;br /&gt;
*** Soil Thermal Conductivity&lt;br /&gt;
*** Heat Flux Plate&lt;br /&gt;
** 1.5m Soil temperature?&lt;br /&gt;
* what am I forgetting here?&lt;br /&gt;
* @ K2 Met&lt;br /&gt;
** Lower the tower to two sections&lt;br /&gt;
** grab data off the storage module&lt;br /&gt;
** sensor refresh&lt;br /&gt;
** AT/RH&lt;br /&gt;
** SR50A&lt;br /&gt;
** Battery&lt;br /&gt;
** better secure the radiation stand to make sure it stays level.&lt;br /&gt;
* @ K3 Mauze Gulch&lt;br /&gt;
** Sensor refresh&lt;br /&gt;
*** AT/RH&lt;br /&gt;
*** SR50A&lt;br /&gt;
*** Battery?&lt;br /&gt;
** Data Download  &lt;br /&gt;
* @ K1 SR50A refresh if time allows&lt;br /&gt;
* Camping Schedule&lt;br /&gt;
** 8/14: Salmon Lake BLM&lt;br /&gt;
** 8/15: Kougarok Cabin&lt;br /&gt;
** 8/16: Kougarok Cabin&lt;br /&gt;
&lt;br /&gt;
====8/17 - 8/18====&lt;br /&gt;
* Drive back to Nome and on to Council&lt;br /&gt;
* Spend two nights @ B&amp;amp;B.&lt;br /&gt;
* Focus on C2 Blueberry site &amp;amp; Tower.&lt;br /&gt;
* make the radiation stand more solid.&lt;br /&gt;
* Lower the tower to 2 sections&lt;br /&gt;
** &lt;br /&gt;
&lt;br /&gt;
===Anemometer notes ===&lt;br /&gt;
Testing each anemometer for &lt;br /&gt;
*propeller torque using anemometer torque disc (18310)&lt;br /&gt;
**factory spec is 2.6 gm-cm (black nylon screw at 5cm and metal screw at 2cm)&lt;br /&gt;
*** 33821 moved with 0.2 gm-cm (a black nylon screw at 2cm radius), so this is much better than factory spec&lt;br /&gt;
*** 61996 moved with 0.5 gm-cm&lt;br /&gt;
**tested both Clock Wise(CW) and Counter Clock Wise (CCW)&lt;br /&gt;
*Wind speed using anemometer drive (18802)&lt;br /&gt;
** @200rpm = 0.98m/s. @1000rpm = 4.9m/s. @2000rpm = 9.8m/s&lt;br /&gt;
**tested both CW and CCW&lt;br /&gt;
*Vane Torque using Vane Torque Gauge (18331)&lt;br /&gt;
**mount the gauge, pull the string, if it moves with &amp;lt; 30 gm-cm of torque, golden.&lt;br /&gt;
**tested both CW and CCW&lt;br /&gt;
*Wind Direction using Vane Angle Fixture Tower Mount (18212)&lt;br /&gt;
** checked 3 directions&lt;br /&gt;
*** 33821 all within 1 degree of accuracy&lt;br /&gt;
*** 61996 reads 3 degrees less (ex: reads 177 when should be 180)&lt;br /&gt;
NEED ONE WIRE (have one)&lt;/div&gt;</summary>
		<author><name>137.229.29.223</name></author>
		
	</entry>
	<entry>
		<id>http://ocotal.iarc.uaf.edu/index.php?title=2016_NGEE_August_Nome_Trip&amp;diff=2749</id>
		<title>2016 NGEE August Nome Trip</title>
		<link rel="alternate" type="text/html" href="http://ocotal.iarc.uaf.edu/index.php?title=2016_NGEE_August_Nome_Trip&amp;diff=2749"/>
		<updated>2016-07-29T23:50:41Z</updated>

		<summary type="html">&lt;p&gt;137.229.29.223: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;===Second Trip:===&lt;br /&gt;
'''August 11 - 19'''&lt;br /&gt;
&lt;br /&gt;
===Second Trip To Do List:===&lt;br /&gt;
* @ Teller&lt;br /&gt;
** Lower Station turn into full met 3m tripod located closer to shrubs&lt;br /&gt;
*** soil pit&lt;br /&gt;
*** 1.5m soil temps?&lt;br /&gt;
*** snow&lt;br /&gt;
*** radiation&lt;br /&gt;
*** probably split off surface water sensors onto a different logger (maybe the cr800 up top or else a new one)&lt;br /&gt;
*** airtemp &amp;amp; Precip&lt;br /&gt;
*** 3m anemometer&lt;br /&gt;
*** use self tapping screw to keep animals from removing precip bucket lid.&lt;br /&gt;
** Upper station &lt;br /&gt;
*** soil pit in the low area &lt;br /&gt;
*** new solar panel&lt;br /&gt;
*** real batteries in a battery box&lt;br /&gt;
*** super animal protection.&lt;br /&gt;
** Survey in and place the two hobo pressure transducers somewhere in the watershed up stream from the main site.&lt;br /&gt;
&lt;br /&gt;
* @ Kougraok M64&lt;br /&gt;
** if we get permission then site at the top perhaps?&lt;br /&gt;
* Existing Sites @ Kougarok&lt;br /&gt;
** Remove lowest section of K-met Tower?&lt;br /&gt;
** Level radiometers&lt;br /&gt;
** level precip buckets&lt;br /&gt;
** general sensor refresh&lt;br /&gt;
&lt;br /&gt;
* Existing Sites @ Council&lt;br /&gt;
** Remove lowest section of Tower? @ blueberry hill&lt;br /&gt;
** Level radiometers&lt;br /&gt;
** level precip buckets&lt;br /&gt;
** general sensor refresh&lt;br /&gt;
** spend one or two nights with Mike Murphy to reduce travel times?&lt;br /&gt;
** radiometer setup to Grid site&lt;br /&gt;
** put in ground control point&lt;br /&gt;
&lt;br /&gt;
New ~mile 60 Kougarok site&lt;br /&gt;
* radiation&lt;br /&gt;
* heat flux&lt;br /&gt;
* put in ground control point&lt;br /&gt;
*&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
====8/11====&lt;br /&gt;
* Arrive @ around Noon&lt;br /&gt;
* Pick up vehicle&lt;br /&gt;
* Pick up freight&lt;br /&gt;
* Visit Anvil Mountain and swap out batteries.&lt;br /&gt;
* Get groceries&lt;br /&gt;
* Pack vehicle for 8/12&lt;br /&gt;
* Pick up freight &lt;br /&gt;
** bring teller coded gear to Bering Air&lt;br /&gt;
&lt;br /&gt;
====8/12 &amp;amp; 8/13====&lt;br /&gt;
&lt;br /&gt;
* Go to Teller&lt;br /&gt;
* @Top Put up permanent site&lt;br /&gt;
** tripod&lt;br /&gt;
** camera&lt;br /&gt;
** batteries&lt;br /&gt;
** battery box&lt;br /&gt;
** solar panel&lt;br /&gt;
** logger&lt;br /&gt;
** radiometer&lt;br /&gt;
** additional box for multiplexer&lt;br /&gt;
** multiplexer&lt;br /&gt;
** Met Sensors&lt;br /&gt;
*** AT/RH &lt;br /&gt;
*** RM Young WS/WD&lt;br /&gt;
*** Snow Depth&lt;br /&gt;
*** Precipitation?&lt;br /&gt;
** Soil Pit&lt;br /&gt;
*** SDI12 Soil Moisture&lt;br /&gt;
*** Soil Thermal Conductivity&lt;br /&gt;
*** Heat Flux Plate&lt;br /&gt;
** 1.5m Soil temperature?&lt;br /&gt;
** Cable Armoring for everything exposed&lt;br /&gt;
** Reuse for SW station:&lt;br /&gt;
*** small battery &lt;br /&gt;
*** small solar panel &lt;br /&gt;
*** CR800&lt;br /&gt;
* @ SW station&lt;br /&gt;
** Move instrument box to the small stand&lt;br /&gt;
** Reprogram CR800 &amp;amp; power back up. (I'm still torn on doing this this year or next year...)&lt;br /&gt;
* @ Snowmelt Logger&lt;br /&gt;
** Reuse Snowmelt Yellow box &amp;amp; Logger for permanent site.&lt;br /&gt;
** Met Sensors&lt;br /&gt;
*** AT/RH &lt;br /&gt;
*** RM Young WS/WD&lt;br /&gt;
*** Snow Depth&lt;br /&gt;
** Soil Pit&lt;br /&gt;
*** SDI12 Soil Moisture&lt;br /&gt;
*** Soil Thermal Conductivity&lt;br /&gt;
*** Heat Flux Plate&lt;br /&gt;
** 1.5m Soil temperature?&lt;br /&gt;
** tripod&lt;br /&gt;
** camera&lt;br /&gt;
** batteries&lt;br /&gt;
** battery box&lt;br /&gt;
** solar panel&lt;br /&gt;
** Cable Armoring for everything exposed&lt;br /&gt;
* Use Survey GPS to lock in positions of all instrumentation (before move and after!)&lt;br /&gt;
* Make a discharge measurement&lt;br /&gt;
* Level precip bucket&lt;br /&gt;
* Bring a drill &amp;amp; self-tapping screw to lock tipping bucket in place.&lt;br /&gt;
====8/14 - 8/16 ====&lt;br /&gt;
* '''FUEL UP!!!!'''&lt;br /&gt;
* If the weather cooperates, hike up and visit the Kigluaiks Sites&lt;br /&gt;
** download data&lt;br /&gt;
** reorient antenna if needed&lt;br /&gt;
** see if there is anything we can take down from the smashed up site&lt;br /&gt;
* Plan A: Recon the Kougarok site&lt;br /&gt;
* Plan B: save Kougarok_m64 site for '17 or put instruments @ Pilgrim hot springs&lt;br /&gt;
* @Kougarok_m64&lt;br /&gt;
** tripod&lt;br /&gt;
*** still mulling this one since we will be dragging all this stuff up the hill.&lt;br /&gt;
** batteries&lt;br /&gt;
** battery enclosure&lt;br /&gt;
** Met Instruments&lt;br /&gt;
*** AT/RH&lt;br /&gt;
*** Precip?&lt;br /&gt;
*** RM Young WS/WD&lt;br /&gt;
*** Snow Depth&lt;br /&gt;
** Soil Pit&lt;br /&gt;
*** SDI12 Soil Moisture&lt;br /&gt;
*** Soil Thermal Conductivity&lt;br /&gt;
*** Heat Flux Plate&lt;br /&gt;
** 1.5m Soil temperature?&lt;br /&gt;
* what am I forgetting here?&lt;br /&gt;
* @ K2 Met&lt;br /&gt;
** Lower the tower to two sections&lt;br /&gt;
** grab data off the storage module&lt;br /&gt;
** sensor refresh&lt;br /&gt;
** AT/RH&lt;br /&gt;
** SR50A&lt;br /&gt;
** Battery&lt;br /&gt;
** better secure the radiation stand to make sure it stays level.&lt;br /&gt;
* @ K3 Mauze Gulch&lt;br /&gt;
** Sensor refresh&lt;br /&gt;
*** AT/RH&lt;br /&gt;
*** SR50A&lt;br /&gt;
*** Battery?&lt;br /&gt;
** Data Download  &lt;br /&gt;
* @ K1 &lt;br /&gt;
====8/17 - 8/18====&lt;br /&gt;
* Drive back to Nome and on to Council&lt;br /&gt;
* Spend two nights @ B&amp;amp;B.&lt;br /&gt;
* Focus on C2 Blueberry site &amp;amp; Tower.&lt;br /&gt;
* make the radiation stand more solid.&lt;br /&gt;
* Lower the tower to 2 sections&lt;br /&gt;
** &lt;br /&gt;
===Anemometer notes ===&lt;br /&gt;
Testing each anemometer for &lt;br /&gt;
*propeller torque using anemometer torque disc (18310)&lt;br /&gt;
**factory spec is 2.6 gm-cm (black nylon screw at 5cm and metal screw at 2cm)&lt;br /&gt;
*** 33821 moved with 0.2 gm-cm (a black nylon screw at 2cm radius), so this is much better than factory spec&lt;br /&gt;
*** 61996 moved with 0.5 gm-cm&lt;br /&gt;
**tested both Clock Wise(CW) and Counter Clock Wise (CCW)&lt;br /&gt;
*Wind speed using anemometer drive (18802)&lt;br /&gt;
** @200rpm = 0.98m/s. @1000rpm = 4.9m/s. @2000rpm = 9.8m/s&lt;br /&gt;
**tested both CW and CCW&lt;br /&gt;
*Vane Torque using Vane Torque Gauge (18331)&lt;br /&gt;
**mount the gauge, pull the string, if it moves with &amp;lt; 30 gm-cm of torque, golden.&lt;br /&gt;
**tested both CW and CCW&lt;br /&gt;
*Wind Direction using Vane Angle Fixture Tower Mount (18212)&lt;br /&gt;
** checked 3 directions&lt;br /&gt;
*** 33821 all within 1 degree of accuracy&lt;br /&gt;
*** 61996 reads 3 degrees less (ex: reads 177 when should be 180)&lt;br /&gt;
NEED ONE WIRE (have one)&lt;/div&gt;</summary>
		<author><name>137.229.29.223</name></author>
		
	</entry>
</feed>