<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>http://ocotal.iarc.uaf.edu/api.php?action=feedcontributions&amp;feedformat=atom&amp;user=137.229.91.159&amp;*</id>
	<title>IARC 207 Wiki - User contributions [en]</title>
	<link rel="self" type="application/atom+xml" href="http://ocotal.iarc.uaf.edu/api.php?action=feedcontributions&amp;feedformat=atom&amp;user=137.229.91.159&amp;*"/>
	<link rel="alternate" type="text/html" href="http://ocotal.iarc.uaf.edu/index.php?title=Special:Contributions/137.229.91.159"/>
	<updated>2026-05-12T23:44:23Z</updated>
	<subtitle>User contributions</subtitle>
	<generator>MediaWiki 1.34.2</generator>
	<entry>
		<id>http://ocotal.iarc.uaf.edu/index.php?title=Toolik_DOT_2011-05-17&amp;diff=1399</id>
		<title>Toolik DOT 2011-05-17</title>
		<link rel="alternate" type="text/html" href="http://ocotal.iarc.uaf.edu/index.php?title=Toolik_DOT_2011-05-17&amp;diff=1399"/>
		<updated>2011-05-17T00:50:12Z</updated>

		<summary type="html">&lt;p&gt;137.229.91.159: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;===Tasks===&lt;br /&gt;
&lt;br /&gt;
====Itkillik====&lt;br /&gt;
Helo Flight one -- Nathan &amp;amp; Bob&lt;br /&gt;
* Download GPS Data &amp;amp; Restart logging&lt;br /&gt;
** TSCe&lt;br /&gt;
* Wire in PT?&lt;br /&gt;
** CSI Screwdriver&lt;br /&gt;
* Pictures @ Bridge crossing&lt;br /&gt;
** Digital Camera&lt;br /&gt;
* Get pictures restarted for View A&lt;br /&gt;
&lt;br /&gt;
=====To Bring=====&lt;br /&gt;
* second PT&lt;br /&gt;
* PT weight&lt;br /&gt;
* bring out another screed stake or two for this PT&lt;br /&gt;
* computer &amp;amp; keyboard&lt;br /&gt;
* TSCe&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Helo Flight two -- Bill&lt;br /&gt;
* Bring more gear out&lt;br /&gt;
&lt;br /&gt;
Nathan &amp;amp; Bill &lt;br /&gt;
* Survey&lt;br /&gt;
* Install PT&lt;br /&gt;
* Install second Hobo&lt;br /&gt;
* Snow survey&lt;br /&gt;
* Alternate sat phone&lt;br /&gt;
&lt;br /&gt;
Later in day (All three?)&lt;br /&gt;
* Locate gaging spot for peak flow&lt;br /&gt;
&lt;br /&gt;
====Stuff at Itkillik for UMC &amp;amp; Itikmalakpak====&lt;br /&gt;
* sawzall &amp;amp; blade&lt;br /&gt;
* backup hand saw&lt;br /&gt;
* flange plate &amp;amp; hardware&lt;br /&gt;
&lt;br /&gt;
====Helo Flight three -- Bob====&lt;br /&gt;
Bob will take emergency sat phone and visit the high met sites:&lt;br /&gt;
&lt;br /&gt;
====Upper May Creek====&lt;br /&gt;
* Tipping Bucket / windshield replacement&lt;br /&gt;
** shields are currently in helicopter&lt;br /&gt;
** hoseclamps &amp;amp; screws are in a ziploc with a green bottom @ Itkillik&lt;br /&gt;
# clear snow from ground surface&lt;br /&gt;
# place wooden cross pieces on the ground&lt;br /&gt;
# screw the flanges to the wooden cross pieces&lt;br /&gt;
# twist the altershield vertical members into the flanges&lt;br /&gt;
# hang the alter shield &lt;br /&gt;
# cut the precip pipe so precip bucket comes to within 1/2&amp;quot; to 1&amp;quot; below altershield&lt;br /&gt;
# hoseclamp precip bucket to center pipe&lt;br /&gt;
* download camera images&lt;br /&gt;
&lt;br /&gt;
====Itikmalakpak====&lt;br /&gt;
* Tipping Bucket / windshield replacement&lt;br /&gt;
* download camera images&lt;br /&gt;
&lt;br /&gt;
===Tools===&lt;br /&gt;
* Bob's toolbags&lt;br /&gt;
* cordless drill to screw precip deals in place&lt;br /&gt;
* sawzall to cut precip pipe to length&lt;br /&gt;
* serial cable&lt;br /&gt;
&lt;br /&gt;
===Things to do yet in Toolik===&lt;br /&gt;
* Update firmware on streampro&lt;br /&gt;
* Follow up on Ken's email about other station work&lt;br /&gt;
&lt;br /&gt;
===Things to do on another day at the Itkillik===&lt;br /&gt;
* Put together the back up Hobo and install just downstream of the gaging site&lt;br /&gt;
* Survey in the water level locations&lt;br /&gt;
* Make a GPS Master 3 near the down riverest hobo once it's installed.&lt;/div&gt;</summary>
		<author><name>137.229.91.159</name></author>
		
	</entry>
	<entry>
		<id>http://ocotal.iarc.uaf.edu/index.php?title=Itkillik_2011-05_Field_Stuff&amp;diff=1331</id>
		<title>Itkillik 2011-05 Field Stuff</title>
		<link rel="alternate" type="text/html" href="http://ocotal.iarc.uaf.edu/index.php?title=Itkillik_2011-05_Field_Stuff&amp;diff=1331"/>
		<updated>2011-05-17T00:11:39Z</updated>

		<summary type="html">&lt;p&gt;137.229.91.159: /* Activities */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;Bill/Bob/Nathan&amp;lt;br/&amp;gt;&lt;br /&gt;
[[Spring Stream Gauging Field Supplies]]&lt;br /&gt;
&lt;br /&gt;
===In Toolik===&lt;br /&gt;
Round 1 sling:&lt;br /&gt;
* Cataraft frame&lt;br /&gt;
* Cataraft Paddles&lt;br /&gt;
* 15 horse&lt;br /&gt;
* 5 horse&lt;br /&gt;
* station &amp;amp; field supply actionpacker&lt;br /&gt;
* sleeping bag actionpacker&lt;br /&gt;
&lt;br /&gt;
===Day 1 activities===&lt;br /&gt;
* GPS Master 1 Survey&lt;br /&gt;
* Sort gear&lt;br /&gt;
* set up flight lines&lt;br /&gt;
* Sling some gear out&lt;br /&gt;
* Line out station stuff @ camp&lt;br /&gt;
* snow survey&lt;br /&gt;
&lt;br /&gt;
===Activities===&lt;br /&gt;
[[Toolik DOT 2011-05-15]]&amp;lt;br/&amp;gt;&lt;br /&gt;
[[Toolik DOT 2011-05-16]]&amp;lt;br/&amp;gt;&lt;br /&gt;
[[Toolik DOT 2011-05-17]]&amp;lt;br/&amp;gt;&lt;br /&gt;
&lt;br /&gt;
===Stuff===&lt;br /&gt;
* Leaving Friday 5/13/2011&lt;br /&gt;
* Ken has a barometric Pressure Sensor for us&lt;br /&gt;
* 3 Hobos are in Emily's office as of 5/9&lt;br /&gt;
* Get spare laptop from Emily (for lab use)&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===Pretrip Notes===&lt;br /&gt;
====Email 1: Station Maintenance for Itkillik River Crew 5/9/2011 @ 5:14 PM====&lt;br /&gt;
&amp;lt;pre&amp;gt;&lt;br /&gt;
Itkillik River:&lt;br /&gt;
I have a case w/ 3 HOBO PTs for the Itkillik River for upstream and&lt;br /&gt;
downstream slope.  Two of them are set to record 15 minute intervals&lt;br /&gt;
starting 5/13/11 at 5:00pm.  One is a spare and has not been launched,&lt;br /&gt;
and can be used if all else fails.  There is also the correct&lt;br /&gt;
launch/reader in the case this time.&lt;br /&gt;
&lt;br /&gt;
You will also have to install 2 SDI12 PTs because the current ones are&lt;br /&gt;
locked in ice.  1 should be 15psig (older unit) and 1 should be a new&lt;br /&gt;
5 psig sensor.&lt;br /&gt;
&lt;br /&gt;
You will also have to replace the station barometric pressure ASAP&lt;br /&gt;
when you get to the site, because I couldn't make anything of the old&lt;br /&gt;
data, it seems to be bad.  Barometric pressure is needed for&lt;br /&gt;
correction with the HOBO sensors.&lt;br /&gt;
&lt;br /&gt;
Please download camera images and any historic camera images saved to&lt;br /&gt;
the camera.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Other station maintenance includes:&lt;br /&gt;
Upper May Creek: Tipping bucket / windshield repair, download camera images&lt;br /&gt;
Itikmalakpak:  Tipping bucket / windshield repair, download camera images&lt;br /&gt;
&lt;br /&gt;
And as always, if the fence needs repair, please try and fix it up.&lt;br /&gt;
&amp;lt;/pre&amp;gt;&lt;br /&gt;
====Email 2: to do: PTs 5/9/2011 @ 5:05 PM====&lt;br /&gt;
&amp;lt;pre&amp;gt;&lt;br /&gt;
Gather 2 PTs from downstairs in 106 to go to Itkillik River.  Get 2&lt;br /&gt;
with the shortest cable lengths because the station is close to the&lt;br /&gt;
river and so we shouldn't need the 250 ft cable length (unless that is&lt;br /&gt;
all that is available than that is all we have).  Ask Rob which one&lt;br /&gt;
you can take and then obtain the calibration information from Rob for&lt;br /&gt;
that particular serial number.  Make sure they are labeled at the&lt;br /&gt;
wiring end and have a dessicant pack.    Make sure you obtain a&lt;br /&gt;
working sensor because apparently 1-2 were not working.&lt;br /&gt;
&lt;br /&gt;
Then, in my office there is a box from instruments northwest, Inc.&lt;br /&gt;
Open the box.  Put a label on at the wiring end that says the Serial&lt;br /&gt;
Number, 5 PSIG (verify from calibration sheet), the cable length (all&lt;br /&gt;
should be 250 ft), and the SDI12 Address which is located on the&lt;br /&gt;
calibration sheet.  Include one of the new 5 PSIG in the Itkillik&lt;br /&gt;
River package.&lt;br /&gt;
&lt;br /&gt;
We will have 3 PTs for the Itkillik River, 1 5-PSIG, 1 15-PSIG, and 1&lt;br /&gt;
15 PSIG backup.&lt;br /&gt;
&lt;br /&gt;
Then we will have to make sure all the PTs have conduit for&lt;br /&gt;
protection, so if the old ones don't come see me.  We will have grab&lt;br /&gt;
some conduit / pipe / reducers etc. for the new 5 psi PT.&lt;br /&gt;
&lt;br /&gt;
&amp;lt;/pre&amp;gt;&lt;br /&gt;
====Email 3: Fwd: survey check out equipment 5/9/2011 @ 12:14PM====&lt;br /&gt;
&amp;lt;pre&amp;gt;&lt;br /&gt;
You can pick up your optical level, survey rod, and tripod from&lt;br /&gt;
Horacio for the Itkillik River group.&lt;br /&gt;
&amp;lt;/pre&amp;gt;&lt;br /&gt;
====Emily 4: Leaving for Toolik May 7, 2011 at 12:24 PM====&lt;br /&gt;
&amp;lt;pre&amp;gt;&lt;br /&gt;
I agree w/ Bill that the Toolik group could use an extra day or so for&lt;br /&gt;
field prep in Fairbanks.  However, if you do get there ahead of&lt;br /&gt;
breakup you could get the station repairs (closest to Toolik) finished&lt;br /&gt;
early (instead of at the end).  There are a few things that must get&lt;br /&gt;
done on this trip, about 3 stations close to Toolik (via helicopter)&lt;br /&gt;
need some repairs that could take about a day or two of work.    So&lt;br /&gt;
far the temps have been cool right now, but some stations to the south&lt;br /&gt;
are warming up to about freezing (temps don't stay above freezing at&lt;br /&gt;
night though).  You can look at the station data here &amp;amp; webcams:&lt;br /&gt;
http://ine.uaf.edu/werc/projects/umiat_corridor/stations.html   I&lt;br /&gt;
think Upper May Creek is our furthest south station and will tell you&lt;br /&gt;
what the air temperatures are like in the upper Itkillik basin.  It&lt;br /&gt;
would be great if Bob B. sets up the monitoring webpage so we can look&lt;br /&gt;
at AT and Windspeed and camera images again.&lt;br /&gt;
&amp;lt;/pre&amp;gt;&lt;br /&gt;
====Emily 5: Ice descriptions Apr 29, 2011 at 12:22 PM====&lt;br /&gt;
&amp;lt;pre&amp;gt;&lt;br /&gt;
A few of you asked about ice descriptions in a meeting awhile back.&lt;br /&gt;
This is a handy little document that I came across at a presentation a&lt;br /&gt;
few years ago:&lt;br /&gt;
&lt;br /&gt;
Pilots Guide to River Ice by the National Weather Service.&lt;br /&gt;
&lt;br /&gt;
http://aprfc.arh.noaa.gov/resources/rivwatch/rwp_handbook.pdf&lt;br /&gt;
&lt;br /&gt;
It has photos of the ice features and definitions you may find helpful.&lt;br /&gt;
&lt;br /&gt;
Useful terms to describe the ice size are sheets, pans, chunks.  Other&lt;br /&gt;
features are ice runs (continuous length of moving ice) &amp;amp; ice jams&lt;br /&gt;
(note page 5 describing ice jams).&lt;br /&gt;
&lt;br /&gt;
GPS coordinates and a description in your field book would be helpful.&lt;br /&gt;
 Measurements of ice dimensions w/ a tape measure would also be&lt;br /&gt;
helpful.  Other things to note  are anchor or bottom fast ice and&lt;br /&gt;
shore ice.  When does it all disappear from the channel, particularly&lt;br /&gt;
at the gauging reach?&lt;br /&gt;
&amp;lt;/pre&amp;gt;&lt;br /&gt;
&lt;br /&gt;
====Doug Email: Report Mar 30, 2011 at 9:09 AM====&lt;br /&gt;
&amp;lt;pre&amp;gt;&lt;br /&gt;
&lt;br /&gt;
Emily, I am working on the report and will finish it today.  I'll be&lt;br /&gt;
back on Friday.  One thing we definitely need to do this breakup is to&lt;br /&gt;
take pictures at the proposed bridge crossings.  The strategy would be&lt;br /&gt;
to take pictures both upstream and downstream each day, hopefully from&lt;br /&gt;
approximately from the same position (horizontally and vertically).&lt;br /&gt;
Maybe a couple from same horizontal position, but at different&lt;br /&gt;
elevations.  Doug&lt;br /&gt;
&amp;lt;/pre&amp;gt;&lt;/div&gt;</summary>
		<author><name>137.229.91.159</name></author>
		
	</entry>
	<entry>
		<id>http://ocotal.iarc.uaf.edu/index.php?title=Toolik_DOT_2011-05-16&amp;diff=1394</id>
		<title>Toolik DOT 2011-05-16</title>
		<link rel="alternate" type="text/html" href="http://ocotal.iarc.uaf.edu/index.php?title=Toolik_DOT_2011-05-16&amp;diff=1394"/>
		<updated>2011-05-16T17:20:55Z</updated>

		<summary type="html">&lt;p&gt;137.229.91.159: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;===Tasks===&lt;br /&gt;
====Itkillik====&lt;br /&gt;
* Install New SDI12 PTs&lt;br /&gt;
** 5 psig sensor&lt;br /&gt;
*** Program address @ camp&lt;br /&gt;
**** Gunsight CR1000 / laptop / serial cable&lt;br /&gt;
*** run through conduit @ camp&lt;br /&gt;
*** bring dessicant out for 2nd pt&lt;br /&gt;
*** bring out another screed stake or two for this PT&lt;br /&gt;
* Install second hobo&lt;br /&gt;
* Survey GPS&lt;br /&gt;
** Download data&lt;br /&gt;
** Restart&lt;br /&gt;
* Snow survey&lt;br /&gt;
* bring new sat phone&lt;br /&gt;
* TSCe&lt;br /&gt;
* Laptop&lt;br /&gt;
&lt;br /&gt;
====Stuff at Itkillik for UMC &amp;amp; Itikmalakpak====&lt;br /&gt;
* sawzall &amp;amp; blade&lt;br /&gt;
* flange plate &amp;amp; hardware&lt;br /&gt;
* hose clamps?  (I think they're in the flange plate bag)&lt;br /&gt;
&lt;br /&gt;
====Upper May Creek====&lt;br /&gt;
* Tipping Bucket / windshield replacement&lt;br /&gt;
** shields are currently in snowmachine trailer&lt;br /&gt;
** hoseclamps &amp;amp; screws are in a ziploc with a green bottom&lt;br /&gt;
# clear snow from ground surface&lt;br /&gt;
# place wooden cross pieces on the ground&lt;br /&gt;
# screw the flanges to the wooden cross pieces&lt;br /&gt;
# twist the altershield vertical members into the flanges&lt;br /&gt;
# hang the alter shield &lt;br /&gt;
# cut the precip pipe so precip bucket comes to within 1/2&amp;quot; to 1&amp;quot; below altershield&lt;br /&gt;
# hoseclamp precip bucket to center pipe&lt;br /&gt;
* download camera images&lt;br /&gt;
&lt;br /&gt;
====Itikmalakpak====&lt;br /&gt;
* Tipping Bucket / windshield replacement&lt;br /&gt;
** shields are currently in snowmachine trailer&lt;br /&gt;
** track down flange &amp;amp; wood screws&lt;br /&gt;
* download camera images&lt;br /&gt;
&lt;br /&gt;
===Tools===&lt;br /&gt;
* Bob's toolbags&lt;br /&gt;
* cordless drill to screw precip deals in place&lt;br /&gt;
* sawzall to cut precip pipe to length&lt;br /&gt;
* serial cable&lt;br /&gt;
&lt;br /&gt;
===Things to do in Toolik===&lt;br /&gt;
* Update firmware on streampro&lt;/div&gt;</summary>
		<author><name>137.229.91.159</name></author>
		
	</entry>
	<entry>
		<id>http://ocotal.iarc.uaf.edu/index.php?title=Toolik_DOT_2011-05-16&amp;diff=1393</id>
		<title>Toolik DOT 2011-05-16</title>
		<link rel="alternate" type="text/html" href="http://ocotal.iarc.uaf.edu/index.php?title=Toolik_DOT_2011-05-16&amp;diff=1393"/>
		<updated>2011-05-16T15:26:02Z</updated>

		<summary type="html">&lt;p&gt;137.229.91.159: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;===Tasks===&lt;br /&gt;
====Itkillik====&lt;br /&gt;
* Install New SDI12 PTs&lt;br /&gt;
** 5 psig sensor&lt;br /&gt;
*** Program address @ camp&lt;br /&gt;
**** Gunsight CR1000 / laptop / serial cable&lt;br /&gt;
*** run through conduit @ camp&lt;br /&gt;
*** bring dessicant out for 2nd pt&lt;br /&gt;
*** bring out another screed stake or two for this PT&lt;br /&gt;
* Install second hobo&lt;br /&gt;
* Survey GPS&lt;br /&gt;
** Download data&lt;br /&gt;
** Restart&lt;br /&gt;
* Snow survey&lt;br /&gt;
* bring new sat phone&lt;br /&gt;
* TSCe&lt;br /&gt;
* Laptop&lt;br /&gt;
&lt;br /&gt;
====Upper May Creek====&lt;br /&gt;
* Tipping Bucket / windshield replacement&lt;br /&gt;
** shields are currently in snowmachine trailer&lt;br /&gt;
** hoseclamps &amp;amp; screws are in a ziploc with a green bottom&lt;br /&gt;
# clear snow from ground surface&lt;br /&gt;
# place wooden cross pieces on the ground&lt;br /&gt;
# screw the flanges to the wooden cross pieces&lt;br /&gt;
# twist the altershield vertical members into the flanges&lt;br /&gt;
# hang the alter shield &lt;br /&gt;
# cut the precip pipe so precip bucket comes to within 1/2&amp;quot; to 1&amp;quot; below altershield&lt;br /&gt;
# hoseclamp precip bucket to center pipe&lt;br /&gt;
* download camera images&lt;br /&gt;
&lt;br /&gt;
====Itikmalakpak====&lt;br /&gt;
* Tipping Bucket / windshield replacement&lt;br /&gt;
** shields are currently in snowmachine trailer&lt;br /&gt;
** track down flange &amp;amp; wood screws&lt;br /&gt;
* download camera images&lt;br /&gt;
&lt;br /&gt;
===Tools===&lt;br /&gt;
* Bob's toolbags&lt;br /&gt;
* cordless drill to screw precip deals in place&lt;br /&gt;
* sawzall to cut precip pipe to length&lt;br /&gt;
* serial cable&lt;br /&gt;
&lt;br /&gt;
===Things to do in Toolik===&lt;br /&gt;
* Update firmware on streampro&lt;/div&gt;</summary>
		<author><name>137.229.91.159</name></author>
		
	</entry>
	<entry>
		<id>http://ocotal.iarc.uaf.edu/index.php?title=Itkillik_2011-05_Field_Stuff&amp;diff=1330</id>
		<title>Itkillik 2011-05 Field Stuff</title>
		<link rel="alternate" type="text/html" href="http://ocotal.iarc.uaf.edu/index.php?title=Itkillik_2011-05_Field_Stuff&amp;diff=1330"/>
		<updated>2011-05-16T15:22:40Z</updated>

		<summary type="html">&lt;p&gt;137.229.91.159: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;Bill/Bob/Nathan&amp;lt;br/&amp;gt;&lt;br /&gt;
[[Spring Stream Gauging Field Supplies]]&lt;br /&gt;
&lt;br /&gt;
===In Toolik===&lt;br /&gt;
Round 1 sling:&lt;br /&gt;
* Cataraft frame&lt;br /&gt;
* Cataraft Paddles&lt;br /&gt;
* 15 horse&lt;br /&gt;
* 5 horse&lt;br /&gt;
* station &amp;amp; field supply actionpacker&lt;br /&gt;
* sleeping bag actionpacker&lt;br /&gt;
&lt;br /&gt;
===Day 1 activities===&lt;br /&gt;
* GPS Master 1 Survey&lt;br /&gt;
* Sort gear&lt;br /&gt;
* set up flight lines&lt;br /&gt;
* Sling some gear out&lt;br /&gt;
* Line out station stuff @ camp&lt;br /&gt;
* snow survey&lt;br /&gt;
&lt;br /&gt;
===Activities===&lt;br /&gt;
[[Toolik DOT 2011-05-15]]&amp;lt;br/&amp;gt;&lt;br /&gt;
[[Toolik DOT 2011-05-16]]&lt;br /&gt;
&lt;br /&gt;
===Stuff===&lt;br /&gt;
* Leaving Friday 5/13/2011&lt;br /&gt;
* Ken has a barometric Pressure Sensor for us&lt;br /&gt;
* 3 Hobos are in Emily's office as of 5/9&lt;br /&gt;
* Get spare laptop from Emily (for lab use)&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===Pretrip Notes===&lt;br /&gt;
====Email 1: Station Maintenance for Itkillik River Crew 5/9/2011 @ 5:14 PM====&lt;br /&gt;
&amp;lt;pre&amp;gt;&lt;br /&gt;
Itkillik River:&lt;br /&gt;
I have a case w/ 3 HOBO PTs for the Itkillik River for upstream and&lt;br /&gt;
downstream slope.  Two of them are set to record 15 minute intervals&lt;br /&gt;
starting 5/13/11 at 5:00pm.  One is a spare and has not been launched,&lt;br /&gt;
and can be used if all else fails.  There is also the correct&lt;br /&gt;
launch/reader in the case this time.&lt;br /&gt;
&lt;br /&gt;
You will also have to install 2 SDI12 PTs because the current ones are&lt;br /&gt;
locked in ice.  1 should be 15psig (older unit) and 1 should be a new&lt;br /&gt;
5 psig sensor.&lt;br /&gt;
&lt;br /&gt;
You will also have to replace the station barometric pressure ASAP&lt;br /&gt;
when you get to the site, because I couldn't make anything of the old&lt;br /&gt;
data, it seems to be bad.  Barometric pressure is needed for&lt;br /&gt;
correction with the HOBO sensors.&lt;br /&gt;
&lt;br /&gt;
Please download camera images and any historic camera images saved to&lt;br /&gt;
the camera.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Other station maintenance includes:&lt;br /&gt;
Upper May Creek: Tipping bucket / windshield repair, download camera images&lt;br /&gt;
Itikmalakpak:  Tipping bucket / windshield repair, download camera images&lt;br /&gt;
&lt;br /&gt;
And as always, if the fence needs repair, please try and fix it up.&lt;br /&gt;
&amp;lt;/pre&amp;gt;&lt;br /&gt;
====Email 2: to do: PTs 5/9/2011 @ 5:05 PM====&lt;br /&gt;
&amp;lt;pre&amp;gt;&lt;br /&gt;
Gather 2 PTs from downstairs in 106 to go to Itkillik River.  Get 2&lt;br /&gt;
with the shortest cable lengths because the station is close to the&lt;br /&gt;
river and so we shouldn't need the 250 ft cable length (unless that is&lt;br /&gt;
all that is available than that is all we have).  Ask Rob which one&lt;br /&gt;
you can take and then obtain the calibration information from Rob for&lt;br /&gt;
that particular serial number.  Make sure they are labeled at the&lt;br /&gt;
wiring end and have a dessicant pack.    Make sure you obtain a&lt;br /&gt;
working sensor because apparently 1-2 were not working.&lt;br /&gt;
&lt;br /&gt;
Then, in my office there is a box from instruments northwest, Inc.&lt;br /&gt;
Open the box.  Put a label on at the wiring end that says the Serial&lt;br /&gt;
Number, 5 PSIG (verify from calibration sheet), the cable length (all&lt;br /&gt;
should be 250 ft), and the SDI12 Address which is located on the&lt;br /&gt;
calibration sheet.  Include one of the new 5 PSIG in the Itkillik&lt;br /&gt;
River package.&lt;br /&gt;
&lt;br /&gt;
We will have 3 PTs for the Itkillik River, 1 5-PSIG, 1 15-PSIG, and 1&lt;br /&gt;
15 PSIG backup.&lt;br /&gt;
&lt;br /&gt;
Then we will have to make sure all the PTs have conduit for&lt;br /&gt;
protection, so if the old ones don't come see me.  We will have grab&lt;br /&gt;
some conduit / pipe / reducers etc. for the new 5 psi PT.&lt;br /&gt;
&lt;br /&gt;
&amp;lt;/pre&amp;gt;&lt;br /&gt;
====Email 3: Fwd: survey check out equipment 5/9/2011 @ 12:14PM====&lt;br /&gt;
&amp;lt;pre&amp;gt;&lt;br /&gt;
You can pick up your optical level, survey rod, and tripod from&lt;br /&gt;
Horacio for the Itkillik River group.&lt;br /&gt;
&amp;lt;/pre&amp;gt;&lt;br /&gt;
====Emily 4: Leaving for Toolik May 7, 2011 at 12:24 PM====&lt;br /&gt;
&amp;lt;pre&amp;gt;&lt;br /&gt;
I agree w/ Bill that the Toolik group could use an extra day or so for&lt;br /&gt;
field prep in Fairbanks.  However, if you do get there ahead of&lt;br /&gt;
breakup you could get the station repairs (closest to Toolik) finished&lt;br /&gt;
early (instead of at the end).  There are a few things that must get&lt;br /&gt;
done on this trip, about 3 stations close to Toolik (via helicopter)&lt;br /&gt;
need some repairs that could take about a day or two of work.    So&lt;br /&gt;
far the temps have been cool right now, but some stations to the south&lt;br /&gt;
are warming up to about freezing (temps don't stay above freezing at&lt;br /&gt;
night though).  You can look at the station data here &amp;amp; webcams:&lt;br /&gt;
http://ine.uaf.edu/werc/projects/umiat_corridor/stations.html   I&lt;br /&gt;
think Upper May Creek is our furthest south station and will tell you&lt;br /&gt;
what the air temperatures are like in the upper Itkillik basin.  It&lt;br /&gt;
would be great if Bob B. sets up the monitoring webpage so we can look&lt;br /&gt;
at AT and Windspeed and camera images again.&lt;br /&gt;
&amp;lt;/pre&amp;gt;&lt;br /&gt;
====Emily 5: Ice descriptions Apr 29, 2011 at 12:22 PM====&lt;br /&gt;
&amp;lt;pre&amp;gt;&lt;br /&gt;
A few of you asked about ice descriptions in a meeting awhile back.&lt;br /&gt;
This is a handy little document that I came across at a presentation a&lt;br /&gt;
few years ago:&lt;br /&gt;
&lt;br /&gt;
Pilots Guide to River Ice by the National Weather Service.&lt;br /&gt;
&lt;br /&gt;
http://aprfc.arh.noaa.gov/resources/rivwatch/rwp_handbook.pdf&lt;br /&gt;
&lt;br /&gt;
It has photos of the ice features and definitions you may find helpful.&lt;br /&gt;
&lt;br /&gt;
Useful terms to describe the ice size are sheets, pans, chunks.  Other&lt;br /&gt;
features are ice runs (continuous length of moving ice) &amp;amp; ice jams&lt;br /&gt;
(note page 5 describing ice jams).&lt;br /&gt;
&lt;br /&gt;
GPS coordinates and a description in your field book would be helpful.&lt;br /&gt;
 Measurements of ice dimensions w/ a tape measure would also be&lt;br /&gt;
helpful.  Other things to note  are anchor or bottom fast ice and&lt;br /&gt;
shore ice.  When does it all disappear from the channel, particularly&lt;br /&gt;
at the gauging reach?&lt;br /&gt;
&amp;lt;/pre&amp;gt;&lt;br /&gt;
&lt;br /&gt;
====Doug Email: Report Mar 30, 2011 at 9:09 AM====&lt;br /&gt;
&amp;lt;pre&amp;gt;&lt;br /&gt;
&lt;br /&gt;
Emily, I am working on the report and will finish it today.  I'll be&lt;br /&gt;
back on Friday.  One thing we definitely need to do this breakup is to&lt;br /&gt;
take pictures at the proposed bridge crossings.  The strategy would be&lt;br /&gt;
to take pictures both upstream and downstream each day, hopefully from&lt;br /&gt;
approximately from the same position (horizontally and vertically).&lt;br /&gt;
Maybe a couple from same horizontal position, but at different&lt;br /&gt;
elevations.  Doug&lt;br /&gt;
&amp;lt;/pre&amp;gt;&lt;/div&gt;</summary>
		<author><name>137.229.91.159</name></author>
		
	</entry>
	<entry>
		<id>http://ocotal.iarc.uaf.edu/index.php?title=Itkillik_2011-05_Field_Stuff&amp;diff=1329</id>
		<title>Itkillik 2011-05 Field Stuff</title>
		<link rel="alternate" type="text/html" href="http://ocotal.iarc.uaf.edu/index.php?title=Itkillik_2011-05_Field_Stuff&amp;diff=1329"/>
		<updated>2011-05-16T15:21:55Z</updated>

		<summary type="html">&lt;p&gt;137.229.91.159: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;Bill/Bob/Nathan&amp;lt;br/&amp;gt;&lt;br /&gt;
[[Spring Stream Gauging Field Supplies]]&lt;br /&gt;
&lt;br /&gt;
===In Toolik===&lt;br /&gt;
Round 1 sling:&lt;br /&gt;
* Cataraft frame&lt;br /&gt;
* Cataraft Paddles&lt;br /&gt;
* 15 horse&lt;br /&gt;
* 5 horse&lt;br /&gt;
* station &amp;amp; field supply actionpacker&lt;br /&gt;
* sleeping bag actionpacker&lt;br /&gt;
&lt;br /&gt;
===Day 1 activities===&lt;br /&gt;
* GPS Master 1 Survey&lt;br /&gt;
* Sort gear&lt;br /&gt;
* set up flight lines&lt;br /&gt;
* Sling some gear out&lt;br /&gt;
* Line out station stuff @ camp&lt;br /&gt;
* snow survey&lt;br /&gt;
&lt;br /&gt;
===Activities===&lt;br /&gt;
[[Toolik DOT 2011-05-15]]&lt;br /&gt;
[[Toolik DOT 2011-05-16]]&lt;br /&gt;
&lt;br /&gt;
===Stuff===&lt;br /&gt;
* Leaving Friday 5/13/2011&lt;br /&gt;
* Ken has a barometric Pressure Sensor for us&lt;br /&gt;
* 3 Hobos are in Emily's office as of 5/9&lt;br /&gt;
* Get spare laptop from Emily (for lab use)&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===Pretrip Notes===&lt;br /&gt;
====Email 1: Station Maintenance for Itkillik River Crew 5/9/2011 @ 5:14 PM====&lt;br /&gt;
&amp;lt;pre&amp;gt;&lt;br /&gt;
Itkillik River:&lt;br /&gt;
I have a case w/ 3 HOBO PTs for the Itkillik River for upstream and&lt;br /&gt;
downstream slope.  Two of them are set to record 15 minute intervals&lt;br /&gt;
starting 5/13/11 at 5:00pm.  One is a spare and has not been launched,&lt;br /&gt;
and can be used if all else fails.  There is also the correct&lt;br /&gt;
launch/reader in the case this time.&lt;br /&gt;
&lt;br /&gt;
You will also have to install 2 SDI12 PTs because the current ones are&lt;br /&gt;
locked in ice.  1 should be 15psig (older unit) and 1 should be a new&lt;br /&gt;
5 psig sensor.&lt;br /&gt;
&lt;br /&gt;
You will also have to replace the station barometric pressure ASAP&lt;br /&gt;
when you get to the site, because I couldn't make anything of the old&lt;br /&gt;
data, it seems to be bad.  Barometric pressure is needed for&lt;br /&gt;
correction with the HOBO sensors.&lt;br /&gt;
&lt;br /&gt;
Please download camera images and any historic camera images saved to&lt;br /&gt;
the camera.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
Other station maintenance includes:&lt;br /&gt;
Upper May Creek: Tipping bucket / windshield repair, download camera images&lt;br /&gt;
Itikmalakpak:  Tipping bucket / windshield repair, download camera images&lt;br /&gt;
&lt;br /&gt;
And as always, if the fence needs repair, please try and fix it up.&lt;br /&gt;
&amp;lt;/pre&amp;gt;&lt;br /&gt;
====Email 2: to do: PTs 5/9/2011 @ 5:05 PM====&lt;br /&gt;
&amp;lt;pre&amp;gt;&lt;br /&gt;
Gather 2 PTs from downstairs in 106 to go to Itkillik River.  Get 2&lt;br /&gt;
with the shortest cable lengths because the station is close to the&lt;br /&gt;
river and so we shouldn't need the 250 ft cable length (unless that is&lt;br /&gt;
all that is available than that is all we have).  Ask Rob which one&lt;br /&gt;
you can take and then obtain the calibration information from Rob for&lt;br /&gt;
that particular serial number.  Make sure they are labeled at the&lt;br /&gt;
wiring end and have a dessicant pack.    Make sure you obtain a&lt;br /&gt;
working sensor because apparently 1-2 were not working.&lt;br /&gt;
&lt;br /&gt;
Then, in my office there is a box from instruments northwest, Inc.&lt;br /&gt;
Open the box.  Put a label on at the wiring end that says the Serial&lt;br /&gt;
Number, 5 PSIG (verify from calibration sheet), the cable length (all&lt;br /&gt;
should be 250 ft), and the SDI12 Address which is located on the&lt;br /&gt;
calibration sheet.  Include one of the new 5 PSIG in the Itkillik&lt;br /&gt;
River package.&lt;br /&gt;
&lt;br /&gt;
We will have 3 PTs for the Itkillik River, 1 5-PSIG, 1 15-PSIG, and 1&lt;br /&gt;
15 PSIG backup.&lt;br /&gt;
&lt;br /&gt;
Then we will have to make sure all the PTs have conduit for&lt;br /&gt;
protection, so if the old ones don't come see me.  We will have grab&lt;br /&gt;
some conduit / pipe / reducers etc. for the new 5 psi PT.&lt;br /&gt;
&lt;br /&gt;
&amp;lt;/pre&amp;gt;&lt;br /&gt;
====Email 3: Fwd: survey check out equipment 5/9/2011 @ 12:14PM====&lt;br /&gt;
&amp;lt;pre&amp;gt;&lt;br /&gt;
You can pick up your optical level, survey rod, and tripod from&lt;br /&gt;
Horacio for the Itkillik River group.&lt;br /&gt;
&amp;lt;/pre&amp;gt;&lt;br /&gt;
====Emily 4: Leaving for Toolik May 7, 2011 at 12:24 PM====&lt;br /&gt;
&amp;lt;pre&amp;gt;&lt;br /&gt;
I agree w/ Bill that the Toolik group could use an extra day or so for&lt;br /&gt;
field prep in Fairbanks.  However, if you do get there ahead of&lt;br /&gt;
breakup you could get the station repairs (closest to Toolik) finished&lt;br /&gt;
early (instead of at the end).  There are a few things that must get&lt;br /&gt;
done on this trip, about 3 stations close to Toolik (via helicopter)&lt;br /&gt;
need some repairs that could take about a day or two of work.    So&lt;br /&gt;
far the temps have been cool right now, but some stations to the south&lt;br /&gt;
are warming up to about freezing (temps don't stay above freezing at&lt;br /&gt;
night though).  You can look at the station data here &amp;amp; webcams:&lt;br /&gt;
http://ine.uaf.edu/werc/projects/umiat_corridor/stations.html   I&lt;br /&gt;
think Upper May Creek is our furthest south station and will tell you&lt;br /&gt;
what the air temperatures are like in the upper Itkillik basin.  It&lt;br /&gt;
would be great if Bob B. sets up the monitoring webpage so we can look&lt;br /&gt;
at AT and Windspeed and camera images again.&lt;br /&gt;
&amp;lt;/pre&amp;gt;&lt;br /&gt;
====Emily 5: Ice descriptions Apr 29, 2011 at 12:22 PM====&lt;br /&gt;
&amp;lt;pre&amp;gt;&lt;br /&gt;
A few of you asked about ice descriptions in a meeting awhile back.&lt;br /&gt;
This is a handy little document that I came across at a presentation a&lt;br /&gt;
few years ago:&lt;br /&gt;
&lt;br /&gt;
Pilots Guide to River Ice by the National Weather Service.&lt;br /&gt;
&lt;br /&gt;
http://aprfc.arh.noaa.gov/resources/rivwatch/rwp_handbook.pdf&lt;br /&gt;
&lt;br /&gt;
It has photos of the ice features and definitions you may find helpful.&lt;br /&gt;
&lt;br /&gt;
Useful terms to describe the ice size are sheets, pans, chunks.  Other&lt;br /&gt;
features are ice runs (continuous length of moving ice) &amp;amp; ice jams&lt;br /&gt;
(note page 5 describing ice jams).&lt;br /&gt;
&lt;br /&gt;
GPS coordinates and a description in your field book would be helpful.&lt;br /&gt;
 Measurements of ice dimensions w/ a tape measure would also be&lt;br /&gt;
helpful.  Other things to note  are anchor or bottom fast ice and&lt;br /&gt;
shore ice.  When does it all disappear from the channel, particularly&lt;br /&gt;
at the gauging reach?&lt;br /&gt;
&amp;lt;/pre&amp;gt;&lt;br /&gt;
&lt;br /&gt;
====Doug Email: Report Mar 30, 2011 at 9:09 AM====&lt;br /&gt;
&amp;lt;pre&amp;gt;&lt;br /&gt;
&lt;br /&gt;
Emily, I am working on the report and will finish it today.  I'll be&lt;br /&gt;
back on Friday.  One thing we definitely need to do this breakup is to&lt;br /&gt;
take pictures at the proposed bridge crossings.  The strategy would be&lt;br /&gt;
to take pictures both upstream and downstream each day, hopefully from&lt;br /&gt;
approximately from the same position (horizontally and vertically).&lt;br /&gt;
Maybe a couple from same horizontal position, but at different&lt;br /&gt;
elevations.  Doug&lt;br /&gt;
&amp;lt;/pre&amp;gt;&lt;/div&gt;</summary>
		<author><name>137.229.91.159</name></author>
		
	</entry>
	<entry>
		<id>http://ocotal.iarc.uaf.edu/index.php?title=North_Slope_Foothills&amp;diff=823</id>
		<title>North Slope Foothills</title>
		<link rel="alternate" type="text/html" href="http://ocotal.iarc.uaf.edu/index.php?title=North_Slope_Foothills&amp;diff=823"/>
		<updated>2011-05-14T23:54:55Z</updated>

		<summary type="html">&lt;p&gt;137.229.91.159: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;This project was funded by the Alaska Department of Transportation and Public Facilities and includes the DFM/DFR series met stations:&lt;br /&gt;
*DFM1 South White Hills&lt;br /&gt;
*DFM2 White Hills&lt;br /&gt;
*DFM3 North White Hills&lt;br /&gt;
*DFM4 Northwest Kuparuk&lt;/div&gt;</summary>
		<author><name>137.229.91.159</name></author>
		
	</entry>
</feed>