<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>http://ocotal.iarc.uaf.edu/api.php?action=feedcontributions&amp;feedformat=atom&amp;user=137.229.91.172&amp;*</id>
	<title>IARC 207 Wiki - User contributions [en]</title>
	<link rel="self" type="application/atom+xml" href="http://ocotal.iarc.uaf.edu/api.php?action=feedcontributions&amp;feedformat=atom&amp;user=137.229.91.172&amp;*"/>
	<link rel="alternate" type="text/html" href="http://ocotal.iarc.uaf.edu/index.php?title=Special:Contributions/137.229.91.172"/>
	<updated>2026-05-13T01:34:01Z</updated>
	<subtitle>User contributions</subtitle>
	<generator>MediaWiki 1.34.2</generator>
	<entry>
		<id>http://ocotal.iarc.uaf.edu/index.php?title=Toolik_DOT_2011-05-21&amp;diff=1426</id>
		<title>Toolik DOT 2011-05-21</title>
		<link rel="alternate" type="text/html" href="http://ocotal.iarc.uaf.edu/index.php?title=Toolik_DOT_2011-05-21&amp;diff=1426"/>
		<updated>2011-05-21T17:34:37Z</updated>

		<summary type="html">&lt;p&gt;137.229.91.172: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;===Coordinates===&lt;br /&gt;
Itkillik Station -- Lat: 68 51.991,   Lon: -150 2.400,   Elev: 458 meters (1504 feet)&amp;lt;br/&amp;gt; &lt;br /&gt;
Hobo #2 -- Lat: N68 52 13.1&amp;quot;,  Lon: - 150 02 59.2&amp;quot;&amp;lt;br/&amp;gt;&lt;br /&gt;
Hobo #3 -- Lat: N68 52 44.72&amp;quot;,  Lon: -150 03 57.63&amp;quot;&amp;lt;br/&amp;gt;&lt;br /&gt;
&lt;br /&gt;
===ADCP Specific===&lt;br /&gt;
* 1/4 mile from station = station 2&lt;br /&gt;
* Bridge = station 3&lt;br /&gt;
* Mag var = 20* 47' E&lt;br /&gt;
* Firmware should be 31.12&lt;br /&gt;
* Boat GPS computer connects to the serial port (not usb)&lt;br /&gt;
&lt;br /&gt;
===Tasks===&lt;br /&gt;
&lt;br /&gt;
====Toolik Prep====&lt;br /&gt;
* More PT rebars for water measurements&lt;br /&gt;
* bring memory card for plant cam&lt;br /&gt;
* bring out bubble level for surveying again&lt;br /&gt;
* get survey gear from Joel (re: our broken rod)&lt;br /&gt;
* extra hardware for cataraft&lt;br /&gt;
* ADCP &amp;amp; other related instruments in trailer&lt;br /&gt;
* 5horse gas tank&lt;br /&gt;
* PVC pipe&lt;br /&gt;
&lt;br /&gt;
====Hobo 3====&lt;br /&gt;
Move to bridge crossing&lt;br /&gt;
&lt;br /&gt;
====Itkillik Station====&lt;br /&gt;
* water level measurement&lt;br /&gt;
* Snow Survey&lt;br /&gt;
** Everything is on site&lt;br /&gt;
* Surveying?&lt;br /&gt;
** Everything is on site&lt;br /&gt;
* GPS Survey GPS Master #1 Rebar #1 (&amp;amp; identify it with spray paint maybe?)&lt;br /&gt;
* Paint top of culvert&lt;br /&gt;
* Standard aerial pictures of gaging cross-section&lt;br /&gt;
* Track down TSCe&lt;br /&gt;
&lt;br /&gt;
====Itkillik River Crossing====&lt;br /&gt;
* Standard aerial pictures @ Bridge crossing&lt;br /&gt;
** Digital Camera&lt;br /&gt;
* Plant Cam Setup&lt;br /&gt;
** change out memory card&lt;br /&gt;
* ADCP Measurement&lt;br /&gt;
** Sediment sample mid-river during measurement&lt;br /&gt;
 For the mid river sampling, you should use a plastic bottle &lt;br /&gt;
 and get a grab sample during the discharge measurement (i.e., &lt;br /&gt;
 just one sample per day). Just put the bottle as deep as you can &lt;br /&gt;
 (with your hands) and collect the water. Please write the time.  &lt;br /&gt;
* Set up Cataraft&lt;br /&gt;
* pound in screed stakes / rebar&lt;br /&gt;
* water level measurement&lt;br /&gt;
* Setup isco: &lt;br /&gt;
 I believe you guys will focus your activities near the crossing. I suggest &lt;br /&gt;
 to put the ISCO there too. You should try to fix the end of the tube (where &lt;br /&gt;
 the water enters the tube) to a rebar. The rebar could be near the bank (as &lt;br /&gt;
 long as it is located in moving waters).  We don't want to capture any bed &lt;br /&gt;
 sediment. Any distance above 30 cm from the bottom (river bed) and 20 cm below &lt;br /&gt;
 the top (water surface) would work. Set the sampler to take 4 samples per day. &lt;br /&gt;
 You should collect samples at 3 AM, 9AM, 3 PM and 9 PM (four in a day).&lt;br /&gt;
&lt;br /&gt;
===Tools===&lt;br /&gt;
* Bob's toolbags (in helicopter)&lt;br /&gt;
* Dry suits &amp;amp; boots&lt;br /&gt;
* cordless drill&lt;br /&gt;
* unbroken survey rod &amp;amp; tripod&lt;br /&gt;
* survey tripod at Kanex or in Lab4&lt;br /&gt;
* sledge (in helicopter)&lt;br /&gt;
&lt;br /&gt;
===Things to do yet in Toolik===&lt;br /&gt;
* Follow up on Ken's email about other station work&lt;br /&gt;
* Continue Daily Computer Backups&lt;br /&gt;
* Umiat Send list:&lt;br /&gt;
** Trimble Setup&lt;br /&gt;
** Trimble Tripod&lt;br /&gt;
** 50W solar panel&lt;br /&gt;
** unistrut&lt;br /&gt;
** quarter inch bolts (short)&lt;br /&gt;
* Staff gauges&lt;/div&gt;</summary>
		<author><name>137.229.91.172</name></author>
		
	</entry>
</feed>