<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>http://ocotal.iarc.uaf.edu/api.php?action=feedcontributions&amp;feedformat=atom&amp;user=209.112.137.133&amp;*</id>
	<title>IARC 207 Wiki - User contributions [en]</title>
	<link rel="self" type="application/atom+xml" href="http://ocotal.iarc.uaf.edu/api.php?action=feedcontributions&amp;feedformat=atom&amp;user=209.112.137.133&amp;*"/>
	<link rel="alternate" type="text/html" href="http://ocotal.iarc.uaf.edu/index.php?title=Special:Contributions/209.112.137.133"/>
	<updated>2026-08-17T04:44:41Z</updated>
	<subtitle>User contributions</subtitle>
	<generator>MediaWiki 1.34.2</generator>
	<entry>
		<id>http://ocotal.iarc.uaf.edu/index.php?title=Pakbus_IDs&amp;diff=1756</id>
		<title>Pakbus IDs</title>
		<link rel="alternate" type="text/html" href="http://ocotal.iarc.uaf.edu/index.php?title=Pakbus_IDs&amp;diff=1756"/>
		<updated>2013-06-20T22:18:07Z</updated>

		<summary type="html">&lt;p&gt;209.112.137.133: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;&amp;lt;pre&amp;gt;&lt;br /&gt;
60 - CesnaSonde (Periodically Active 5/2012) - In storage&lt;br /&gt;
70 - Umiat SNOW (Inactive 5/2012)&lt;br /&gt;
75 - Toolik TPS (Active 7/2012) (Also MIT WindTunnel)&lt;br /&gt;
80 - NESDIS SNOW (Active 5/2012)- @ Fox NESDIS Facility&lt;br /&gt;
90 - Barrow SNOW (Active 5/2012) - @ ARM Site&lt;br /&gt;
95 - Atqasuk SNOW (Active 5/2012) - @ ARM Site&lt;br /&gt;
301 - K1 Thermocouples Site (Active 5/2012) - @ Kougarok K1 Site&lt;br /&gt;
302 - K2 Thermocouples Site (Active 5/2012) - @ Kougarok K2 Site&lt;br /&gt;
400 - Barrow Intensive Site A (Active 9/2012) - @ Barrow Environmental Observatory&lt;br /&gt;
401 - Barrow Intensive Site B (Active 9/2012) - @ Barrow Environmental Observatory&lt;br /&gt;
402 - Barrow Intensive Site C (Active 9/2012) - @ Barrow Environmental Observatory&lt;br /&gt;
403 - Barrow Intensive Side D (Inactive 9/2012) - station not yet deployed&lt;br /&gt;
404 - Barrow Soil Moisture Grid (Active 5/2013) - @ Barrow Environmental Observatory&lt;br /&gt;
420 - Super Site Met Logger (Active 5/2012) - @ PFRR Super-site&lt;br /&gt;
421 - Super Site Soil Logger (Active 5/2012) - @ PFRR Super-site&lt;br /&gt;
422 - Super Site Diagnostics (Active 5/2012) - @ PFRR Super-site&lt;br /&gt;
423 - Super Site Ecosystem 1 (Active 5/2012) - @ PFRR Super-site&lt;br /&gt;
424 - Super Site Snow Profile (Active 5/2012) - @ PFRR Super-site&lt;br /&gt;
425 - Super Site Heat Flux 1 (Active 5/2012) - @ PFRR Super-site&lt;br /&gt;
500 - CPCRW North Facing High Site (Active 5/2012) - @ CPCRW&lt;br /&gt;
501 - CPCRW South Facing High Site (Active 5/2012) - @ CPCRW&lt;br /&gt;
502 - CPCRW North Facing Low Site (Active 5/2012) - @ CPCRW&lt;br /&gt;
503 - CPCRW South Facing Low Site (Active 5/2012) - @ CPCRW&lt;br /&gt;
504 - CPCRW C2 Rain - (Inactive 9/2012) - station not yet deployed&lt;br /&gt;
505 - CPCRW C3 Rain - (Inactive 9/2012) - station not yet deployed&lt;br /&gt;
506 - CPCRW C4 Rain - (Inactive 9/2012) - station not yet deployed&lt;br /&gt;
&lt;br /&gt;
&amp;lt;/pre&amp;gt;&lt;/div&gt;</summary>
		<author><name>209.112.137.133</name></author>
		
	</entry>
	<entry>
		<id>http://ocotal.iarc.uaf.edu/index.php?title=NGEE_Barrow_2013_Site_Install_Trip_2&amp;diff=1953</id>
		<title>NGEE Barrow 2013 Site Install Trip 2</title>
		<link rel="alternate" type="text/html" href="http://ocotal.iarc.uaf.edu/index.php?title=NGEE_Barrow_2013_Site_Install_Trip_2&amp;diff=1953"/>
		<updated>2013-06-10T00:32:55Z</updated>

		<summary type="html">&lt;p&gt;209.112.137.133: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;==June 2013 Trip==&lt;br /&gt;
&lt;br /&gt;
===Shipping===&lt;br /&gt;
* New Instrumentation once it arrives on 5/26ish:&lt;br /&gt;
** Precip Buckets 3x&lt;br /&gt;
** Wind Screen 3x&lt;br /&gt;
** HMP155s 6x&lt;br /&gt;
** MetOne 5x&lt;br /&gt;
** Barometric Pressure&lt;br /&gt;
** Radiation Shields&lt;br /&gt;
** Cross Arms &lt;br /&gt;
*** 1.5&amp;quot; Sched 40 Aluminum = Net Radiometer 3x&lt;br /&gt;
*** 1&amp;quot; Sched 40 Aluminum = Upper WS &amp;amp; AT/RH 3x&lt;br /&gt;
** Tripod Mast&lt;br /&gt;
*** 1.5&amp;quot; Sched 40 Galvanized Pipe&lt;br /&gt;
** Net Radiometer&lt;br /&gt;
** NuRail Fittings for crossarms&lt;br /&gt;
&lt;br /&gt;
===To Add to each site===&lt;br /&gt;
* 2 HMP155s w/ Radiation Shields&lt;br /&gt;
* 2 Met One WS&lt;br /&gt;
* 1 Tipping Bucket w/ Windscreen&lt;br /&gt;
* 1 CNR4 Net Radiometer with Heater/Fan Control&lt;br /&gt;
* 1 AM16/32&lt;br /&gt;
&lt;br /&gt;
===Additionally, to add to Grid Site===&lt;br /&gt;
* CS106 Barometric Pressure&lt;br /&gt;
** Need to dig out a vent tube&lt;br /&gt;
** Bring up parts to put a new hole in this enclosure&lt;br /&gt;
===Rewiring at each site===&lt;br /&gt;
* Move AM16/32B #1 &amp;amp; #2 RES to CR1000 C1&lt;br /&gt;
* Move SR50A Green Wire to CR1000 C5&lt;br /&gt;
** Reprogram the IDs for the SR50As&lt;br /&gt;
*** #1 = ID7&lt;br /&gt;
*** #2 = ID8&lt;br /&gt;
*** #3 = ID9&lt;br /&gt;
* Also Measure Thermal Conductivity Heater Values&lt;br /&gt;
* Bring up 3 resistors for CNR4 Thermistor measurement&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===To Do as of 6/8/2013===&lt;br /&gt;
* Wiring Diagrams&lt;br /&gt;
* Sketch up site&lt;br /&gt;
* holes in box for instrumentation maybe?&lt;br /&gt;
* cut crossarms to length (in Barrow)&lt;br /&gt;
* Change SDI-12 IDs for SR50As (in Barrow)&lt;br /&gt;
* Copy B program additions to A &amp;amp; C&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
=== Remaining things to grab===&lt;br /&gt;
* Nu Rail oddball connectors from cabinet&lt;br /&gt;
* BP tubing for grid site&lt;br /&gt;
* Cord Grips for grid site&lt;br /&gt;
* silicone for grid site&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===To Purchase===&lt;br /&gt;
* More Flexible Conduit&lt;br /&gt;
&lt;br /&gt;
===Pre-trip to do===&lt;br /&gt;
* Organized per site items ('''X''' means it's packed / shipped)&lt;br /&gt;
** Precip Stand  (3 sets)&lt;br /&gt;
*** XX 4 NuRail 3/4 offset cross pieces&lt;br /&gt;
*** XX 1 Novalynx Wind Screen&lt;br /&gt;
*** XX 1 TE525m &amp;amp; Cable&lt;br /&gt;
&lt;br /&gt;
** Tripod Related&lt;br /&gt;
*** XX 1.5&amp;quot; Aluminium cross arm for CNR4, lower AT/RH &amp;amp; WS&lt;br /&gt;
*** XX 1.5&amp;quot; Nurail offset&lt;br /&gt;
*** XX 1&amp;quot; Aluminum cross arm for upper AT/RH &amp;amp; WS&lt;br /&gt;
*** XX HMP155s, cables, Radiation Shield&lt;br /&gt;
*** XX 014a WS, cables, nurail / cross arm mounts&lt;br /&gt;
*** &lt;br /&gt;
**** &lt;br /&gt;
**** &lt;br /&gt;
**** &lt;br /&gt;
**** &lt;br /&gt;
**** &lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===Things to buy===&lt;br /&gt;
* Bit o' Food?&lt;br /&gt;
* ?&lt;br /&gt;
&lt;br /&gt;
===Stuff to bring===&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
==== things not on a PR yet====&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
==== Technical Gear ====&lt;br /&gt;
* '''Shotgun'''&lt;br /&gt;
* Keypads&lt;br /&gt;
* '''fish tape'''&lt;br /&gt;
* Tool Bags &lt;br /&gt;
* Computer &amp;amp; (packed) SC32B &lt;br /&gt;
* Climbing harness&lt;br /&gt;
* Serial Cables &amp;amp; spares&lt;br /&gt;
* Sawzall&lt;br /&gt;
* drill&lt;br /&gt;
&lt;br /&gt;
==== Food to bring out ====&lt;br /&gt;
* Optional&lt;br /&gt;
&lt;br /&gt;
==== Probable Luggage ====&lt;br /&gt;
# Shotgun [Bob #1]&lt;br /&gt;
# Bob Personal backpack [Bob #2]&lt;br /&gt;
# Work Actionpacker #1 [Bob #3]&lt;br /&gt;
#&lt;br /&gt;
&lt;br /&gt;
====Rough on-site todo====&lt;br /&gt;
# Remove box &amp;amp; solar panel&lt;br /&gt;
# Measure from top of tripod base to cross arm... note in fieldbook&lt;br /&gt;
# Remove crossarm off tripod&lt;br /&gt;
# unscrew center pole&lt;br /&gt;
# put 1.5&amp;quot; offset nurail fitting on new center pole&lt;br /&gt;
# attach new center pole&lt;br /&gt;
# put cross arm, instrument box, and solar panel back on the tower.&lt;br /&gt;
# Install new instrument box on lower leg.&lt;br /&gt;
# Mount all new sensors&lt;br /&gt;
## Net Radiometer @ 1-1.5m&lt;br /&gt;
## WS on radiometer crossarm&lt;br /&gt;
## HMP155 on radiometer crossarm&lt;br /&gt;
## Second HMP155 &amp;amp; WS high up on tower, maybe as high as they'll reach.&lt;br /&gt;
## Armor all the cabling&lt;br /&gt;
## Armor and install the precip bucket.&lt;br /&gt;
## Install the precip wind screen&lt;br /&gt;
# send new program to data logger&lt;/div&gt;</summary>
		<author><name>209.112.137.133</name></author>
		
	</entry>
	<entry>
		<id>http://ocotal.iarc.uaf.edu/index.php?title=NGEE_Barrow_Intensive_Sites_Initial_Wiring&amp;diff=1856</id>
		<title>NGEE Barrow Intensive Sites Initial Wiring</title>
		<link rel="alternate" type="text/html" href="http://ocotal.iarc.uaf.edu/index.php?title=NGEE_Barrow_Intensive_Sites_Initial_Wiring&amp;diff=1856"/>
		<updated>2013-06-10T00:32:53Z</updated>

		<summary type="html">&lt;p&gt;209.112.137.133: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;===General Wiring 2013===&lt;br /&gt;
(With some minor differences between sites:)&lt;br /&gt;
* 3 SR50As at site C&lt;br /&gt;
&lt;br /&gt;
* In June reprogram the SR50As with new addresses.&lt;br /&gt;
** SR50A #1 = SDI-12 ID 7&lt;br /&gt;
** SR50A #2 = SDI-12 ID 8&lt;br /&gt;
** SR50A #3 = SDI-12 ID 9&lt;br /&gt;
&lt;br /&gt;
 ' SE1  -- &lt;br /&gt;
 ' SE2  -- &lt;br /&gt;
 ' SE3  -- &lt;br /&gt;
 ' SE4  -- &lt;br /&gt;
 ' SE5  -- &lt;br /&gt;
 ' SE6  -- &lt;br /&gt;
 ' SE7  -- CNR4 Dome Temperature Signal&lt;br /&gt;
 ' SE8  -- 107 Probe Signal (Red Wire)&lt;br /&gt;
 ' SE9  -- &lt;br /&gt;
 ' SE10 -- &lt;br /&gt;
 ' SE11 -- AM16/32B #3 COM ODD HI&lt;br /&gt;
 ' SE12 -- AM16/32B #3 COM ODD LO&lt;br /&gt;
 ' SE13 -- AM16/32B #1 COM ODD HI, Precision Resistor to VX2&lt;br /&gt;
 ' SE14 -- AM16/32B #1 COM ODD LO, Precision Resistor to VX2&lt;br /&gt;
 ' SE15 -- AM16/32B #2 COM ODD HI, Precision Resistor to VX3&lt;br /&gt;
 ' SE16 -- AM16/32B #2 COM ODD LO, Precision Resistor to VX3&lt;br /&gt;
&lt;br /&gt;
 ' VX1 -- 107 Probe Excitation (Black Wire); CNR4 LW Dome Temperature Excitation&lt;br /&gt;
 ' VX2 -- Precision resistors to Mux 2 COM ODD HI, SE1, COM ODD LO, SE2&lt;br /&gt;
 ' VX3 -- Precision resistors to Mux 3 COM ODD HI, SE1, COM ODD LO, SE2 &lt;br /&gt;
&lt;br /&gt;
 ' P1 -- MetOne 1m WS+&lt;br /&gt;
 ' P2 -- MetOne 3.5m WS+&lt;br /&gt;
&lt;br /&gt;
 ' C1 -- AM16/32B #1 &amp;amp; AM16/32B #2 -- RES&lt;br /&gt;
 ' C2 -- AM16/32B #3 -- RES; HMP155 SW12V CTRL&lt;br /&gt;
 ' C3 -- CNR4 Heater/Fan Control&lt;br /&gt;
 ' C4 -- AM16/32B #1, 2, &amp;amp; 3 -- CLK&lt;br /&gt;
 ' C5 -- SDI 12 Devices -- (6 Vitel Probes ) (Blue Wire); ; (2 SR50A ) (Green Wire)&lt;br /&gt;
 ' C6 -- Vitel Probe CONTROL (Run to SW12V Control for Vitel Probes)&lt;br /&gt;
 ' C7 -- TE525M Signal&lt;br /&gt;
 ' C8 -- Thermal Conductivity Control&lt;br /&gt;
 ' SW12V -- Radio Power&lt;br /&gt;
&lt;br /&gt;
 ' Wiring that will need to be moved in May 2013&lt;br /&gt;
 ' C1 -- Move AM16/32B #1 &amp;amp; #2 RES to here&lt;br /&gt;
&lt;br /&gt;
 ' Signal Ground -- HFP01 Shields (Clear Wire), 107 Probe SG (Purple Wire), SR50A&lt;br /&gt;
&lt;br /&gt;
 ' AM16/32B #3&lt;br /&gt;
 ' Group 1 HI -- HMP155 1m AT (Yellow Wire)&lt;br /&gt;
 ' Group 1 LO -- HMP155 1m SG (White Wire, jumper to Group 2 LO)&lt;br /&gt;
 ' Group 2 HI -- HMP155 1m RH (Blue Wire)&lt;br /&gt;
 ' Group 2 LO -- HMP155 1m SG (Jumper to Group 1 LO)&lt;br /&gt;
 ' Group 3 HI -- HMP155 3.5m AT (Yellow Wire)&lt;br /&gt;
 ' Group 3 LO -- HMP155 3.5m SG (White Wire, jumper to Group 4 LO)&lt;br /&gt;
 ' Group 4 HI -- HMP155 3.5m RH (Blue Wire)&lt;br /&gt;
 ' Group 4 LO -- HMP155 3.5m SG (jumper to Group 3 LO)&lt;br /&gt;
 ' Group 5 HI -- CNR4 SW In HI (Red Wire)&lt;br /&gt;
 ' Group 5 LO -- CNR4 SW In LO (Blue Wire)&lt;br /&gt;
 ' Group 6 HI -- CNR4 SW OUT HI (White Wire)&lt;br /&gt;
 ' Group 6 LO -- CNR4 SW OUT LO (Black Wire)&lt;br /&gt;
 ' Group 7 HI -- CNR4 LW IN HI (Gray Wire)&lt;br /&gt;
 ' Group 7 LO -- CNR4 LW IN LO (Yellow Wire)&lt;br /&gt;
 ' Group 8 HI -- CNR4 LW OUT HI (Brown Wire)&lt;br /&gt;
 ' Group 8 LO -- CNR4 LW OUT LO (Green Wire)&lt;/div&gt;</summary>
		<author><name>209.112.137.133</name></author>
		
	</entry>
</feed>