<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>http://ocotal.iarc.uaf.edu/api.php?action=feedcontributions&amp;feedformat=atom&amp;user=24.237.126.141&amp;*</id>
	<title>IARC 207 Wiki - User contributions [en]</title>
	<link rel="self" type="application/atom+xml" href="http://ocotal.iarc.uaf.edu/api.php?action=feedcontributions&amp;feedformat=atom&amp;user=24.237.126.141&amp;*"/>
	<link rel="alternate" type="text/html" href="http://ocotal.iarc.uaf.edu/index.php?title=Special:Contributions/24.237.126.141"/>
	<updated>2026-05-12T22:06:51Z</updated>
	<subtitle>User contributions</subtitle>
	<generator>MediaWiki 1.34.2</generator>
	<entry>
		<id>http://ocotal.iarc.uaf.edu/index.php?title=NGEE_Barrow_2013_Site_Install_Trip&amp;diff=1923</id>
		<title>NGEE Barrow 2013 Site Install Trip</title>
		<link rel="alternate" type="text/html" href="http://ocotal.iarc.uaf.edu/index.php?title=NGEE_Barrow_2013_Site_Install_Trip&amp;diff=1923"/>
		<updated>2013-05-09T07:00:24Z</updated>

		<summary type="html">&lt;p&gt;24.237.126.141: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;==May 2013 Trip==&lt;br /&gt;
===Purpose: ===&lt;br /&gt;
* Rewire Grid Site station with CR1000 &amp;amp; new multiplexers&lt;br /&gt;
** XX PakBus ID = 404 &lt;br /&gt;
* XX Setup MD485s to get Grid online&lt;br /&gt;
* XX reconfigure Site C CR1000 for act as a pakbus router&lt;br /&gt;
** Change IsRouter to YES -&amp;gt; Available in advanced settings&lt;br /&gt;
** Change beacon interval on SDC7 to 60&lt;br /&gt;
* Snow Surveys&lt;br /&gt;
* Any other prep that's possible for the June trip&lt;br /&gt;
* Bring back shotgun&lt;br /&gt;
* slather anticorrosion goo on all 12V/G points?&lt;br /&gt;
* Record Thermal Conductivity Heater Resistance using a high-accuracy ohmmeter&lt;br /&gt;
* Swap out SR50A&lt;br /&gt;
* ARM visit if time&lt;br /&gt;
&lt;br /&gt;
===Shipping===&lt;br /&gt;
* None&lt;br /&gt;
&lt;br /&gt;
===To Purchase===&lt;br /&gt;
* XX Anti-Corrosion Goo&lt;br /&gt;
* XX Ziplocs&lt;br /&gt;
* In Barrow:&lt;br /&gt;
** XX Butane -&amp;gt; Going to put someplace (naturally)&lt;br /&gt;
** Battery Cleaner (haven't seen it)&lt;br /&gt;
** XX Food&lt;br /&gt;
&lt;br /&gt;
===Pre-trip to do===&lt;br /&gt;
* done.&lt;br /&gt;
&lt;br /&gt;
===Stuff to bring===&lt;br /&gt;
* XX Adirondack Tube&lt;br /&gt;
* XX Scale&lt;br /&gt;
* XX Thaw Probe&lt;br /&gt;
* XX Ziplocs&lt;br /&gt;
* XX GPS&lt;br /&gt;
* XX 4 Precision Resistors for new logger&lt;br /&gt;
* XX High Precision Voltmeter&lt;br /&gt;
* XX Duct Seal&lt;br /&gt;
* XX 80' of cable&lt;br /&gt;
&lt;br /&gt;
==== Technical Gear ====&lt;br /&gt;
* Shotgun -- in Barrow already&lt;br /&gt;
* Keypads&lt;br /&gt;
* XX fish tape&lt;br /&gt;
* XX Tool Bags &lt;br /&gt;
* XX Computer &amp;amp; (packed) SC32B &lt;br /&gt;
* XX Serial Cables &amp;amp; spares&lt;br /&gt;
&lt;br /&gt;
==== Food to bring out ====&lt;br /&gt;
* Optional&lt;br /&gt;
&lt;br /&gt;
==== Probable Luggage ====&lt;br /&gt;
# Bob Personal Actionpacker [Bob #1]&lt;br /&gt;
# Work Actionpacker #1 [Bob #2]&lt;br /&gt;
# daypack for working&lt;br /&gt;
&lt;br /&gt;
===Rough on-site todo===&lt;br /&gt;
# Copy wiring of Grid Site&lt;br /&gt;
# Transfer wires to new multiplexer &amp;amp; Logger&lt;br /&gt;
# Snowsurveys&lt;br /&gt;
# Measure Heater Resistances for all thermal conductivity probes&lt;br /&gt;
# Look to see if the C site pit 2 thermal conductivity sensors could be connected to a lower instrument enclosure.&lt;br /&gt;
# configure C as pakbus router for grid &lt;br /&gt;
## http://www.campbellsci.com/forum/messages.cfm?threadid=6E4ABAA0-81A1-4158-B850230D8A56A2EF&lt;br /&gt;
# armor and run rs485 line between C and grid&lt;br /&gt;
&lt;br /&gt;
===Probable Schedule===&lt;br /&gt;
* Tuesday&lt;br /&gt;
** Safety Briefing&lt;br /&gt;
** Get Trucks &amp;amp; Snowmachines&lt;br /&gt;
** Eat Lunch &lt;br /&gt;
** Visit Hut &amp;amp; Prepare for first field trip&lt;br /&gt;
** Visit Site&lt;br /&gt;
*** Download Data&lt;br /&gt;
*** Start Rewiring&lt;br /&gt;
*** Start measuring precision resistors&lt;br /&gt;
*** Odds and ends&lt;br /&gt;
*** Run MD485 Cable to site C&lt;br /&gt;
*** Barrow Shopping Items&lt;br /&gt;
&lt;br /&gt;
* Wednesday&lt;br /&gt;
** 7am Up&lt;br /&gt;
** 7:30 Breakfast &amp;amp; Make lunch&lt;br /&gt;
** Visit Site&lt;br /&gt;
*** Snow Surveys @ ABCD&lt;br /&gt;
**** @ 2-4 Random Points within limits outlined below (start with 2 per site and see how long each takes)&lt;br /&gt;
*** continue station rewiring&lt;br /&gt;
*** Verify operation of MD485 Network&lt;br /&gt;
&lt;br /&gt;
* Thursday&lt;br /&gt;
** 7am Up&lt;br /&gt;
** 7:30 Breakfast &amp;amp; Make lunch&lt;br /&gt;
** Visit Site&lt;br /&gt;
*** Finish Snow Surveys&lt;br /&gt;
*** Finish Wiring&lt;br /&gt;
*** Meet with Thomas&lt;br /&gt;
** Pack up&lt;br /&gt;
** Return to Fairbanks&lt;br /&gt;
&lt;br /&gt;
===Re: Snow Surveys===&lt;br /&gt;
''Larry,''&amp;lt;br&amp;gt;&lt;br /&gt;
''Attached are the grid corner coordinates (DGPS) of the end-of-winter snow surveys I did in 2012 and that I repeated last week (all but site A). I used the MagnaProbe and have thousands of measurements from each grid. The measurements are aligned in ~S-N transects, which are located 4 m apart with a measurement every ~ft. These measurements overlap geophysics transects (John, Craig, Susan's).''&amp;lt;br&amp;gt;&lt;br /&gt;
''Last year's average snow depth was about 51 cm, this year I think it was 39 at site B and C (site D 50 and 37 cm, respectively).&lt;br /&gt;
I also took density measurements at each site.''&amp;lt;br&amp;gt;&lt;br /&gt;
''I do not think it is realistic to ask anyone to repeat this snowdepth survey every day during the melt. In fact, it would be impossible time wise. Instead, perhaps do a daily survey (of a portion of) the outer lines of the grid, ie its western and southern perimeters, for example??  I  think it would be good to follow the &amp;quot;L&amp;quot; protocol of Rovansek. I also think we need a measurement every &amp;lt;0.5m in order to capture the spatial mosaic of snow accumulation in these landscapes.''&amp;lt;br&amp;gt;&lt;br /&gt;
''I think it is critical to perform the ablation survey, including snow density, about the same time every day for each site (i.e. site A at 10am, Site B at 11am etc). ''&lt;br /&gt;
&amp;lt;pre&amp;gt;Name	Grid Easting (m)	Grid Northing (m)&lt;br /&gt;
SP_A1	585527.004	7910503.004&lt;br /&gt;
SP_A2	585557.58	7910439.828&lt;br /&gt;
SP_A3	585627.052	7910474.226&lt;br /&gt;
SP_A4	585596.7	7910537.177&lt;br /&gt;
SP_B1	585802.228	7910297.959&lt;br /&gt;
SP_B2	585814.765	7910271.935&lt;br /&gt;
SP_B3	585843.449	7910286.087&lt;br /&gt;
SP_B4	585830.912	7910312.016&lt;br /&gt;
SP_C1	585903.79	7910340.005&lt;br /&gt;
SP_C2	585922.756	7910300.494&lt;br /&gt;
SP_C3	585966.613	7910322.093&lt;br /&gt;
SP_C4	585947.384	7910361.341&lt;br /&gt;
SP_D1	585931.474	7910571.739&lt;br /&gt;
SP_D2	585950.487	7910533.064&lt;br /&gt;
SP_D3	585994.132	7910554.454&lt;br /&gt;
SP_D4	585974.902	7910593.777&lt;br /&gt;
&amp;lt;/pre&amp;gt;&lt;/div&gt;</summary>
		<author><name>24.237.126.141</name></author>
		
	</entry>
	<entry>
		<id>http://ocotal.iarc.uaf.edu/index.php?title=NGEE_Barrow_Intensive_Sites_Initial_Wiring&amp;diff=1855</id>
		<title>NGEE Barrow Intensive Sites Initial Wiring</title>
		<link rel="alternate" type="text/html" href="http://ocotal.iarc.uaf.edu/index.php?title=NGEE_Barrow_Intensive_Sites_Initial_Wiring&amp;diff=1855"/>
		<updated>2013-05-09T06:12:56Z</updated>

		<summary type="html">&lt;p&gt;24.237.126.141: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;===General Wiring 2013===&lt;br /&gt;
(With some minor differences between sites:)&lt;br /&gt;
* 3 SR50As at site C&lt;br /&gt;
* 1 CS106 at site A&lt;br /&gt;
* In May reprogram the SR50As with new addresses.&lt;br /&gt;
** SR50A #1 = SDI-12 ID 7&lt;br /&gt;
** SR50A #2 = SDI-12 ID 8&lt;br /&gt;
** SR50A #3 = SDI-12 ID 9&lt;br /&gt;
&lt;br /&gt;
 ' SE1  -- CNR4 SW In HI&lt;br /&gt;
 ' SE2  -- CNR4 SW In LO&lt;br /&gt;
 ' SE3  -- CNR4 SW OUT HI&lt;br /&gt;
 ' SE4  -- CNR4 SW OUT LO&lt;br /&gt;
 ' SE5  -- CNR4 LW IN HI&lt;br /&gt;
 ' SE6  -- CNR4 LW IN LO&lt;br /&gt;
 ' SE7  -- CNR4 Dome Temperature Signal&lt;br /&gt;
 ' SE8  -- 107 Probe Signal (Red Wire)&lt;br /&gt;
 ' SE9  -- CNR4 LW OUT HI&lt;br /&gt;
 ' SE10 -- CNR4 LW OUT LO&lt;br /&gt;
 ' SE11 -- AM16/32B #3 COM ODD HI&lt;br /&gt;
 ' SE12 -- AM16/32B #3 COM ODD LO&lt;br /&gt;
 ' SE13 -- AM16/32B #1 COM ODD HI, Precision Resistor to VX2&lt;br /&gt;
 ' SE14 -- AM16/32B #1 COM ODD LO, Precision Resistor to VX2&lt;br /&gt;
 ' SE15 -- AM16/32B #2 COM ODD HI, Precision Resistor to VX3&lt;br /&gt;
 ' SE16 -- AM16/32B #2 COM ODD LO, Precision Resistor to VX3&lt;br /&gt;
&lt;br /&gt;
 ' VX1 -- 107 Probe Excitation (Black Wire); **CNR4 LW Dome Temperature Excitation**, **RM Young WD Excite**&lt;br /&gt;
 ' VX2 -- Precision resistors to Mux 2 COM ODD HI, SE1, COM ODD LO, SE2&lt;br /&gt;
 ' VX3 -- Precision resistors to Mux 3 COM ODD HI, SE1, COM ODD LO, SE2, &lt;br /&gt;
&lt;br /&gt;
 ' P1 -- MetOne 1m WS+&lt;br /&gt;
 ' P2 -- MetOne 3.5m WS+&lt;br /&gt;
&lt;br /&gt;
 ' C1 -- AM16/32B #1 &amp;amp; AM16/32B #2 -- RES&lt;br /&gt;
 ' C2 -- AM16/32B #3 -- RES; HMP155 CTRL; (optionally: CS106 CTRL)&lt;br /&gt;
 ' C3 -- CNR4 Heater/Fan Control&lt;br /&gt;
 ' C4 -- AM16/32B #1, 2, &amp;amp; 3 -- CLK&lt;br /&gt;
 ' C5 -- SDI 12 Devices -- (6 Vitel Probes ) (Blue Wire); ; (2 SR50A ) (Green Wire)&lt;br /&gt;
 ' C6 -- Vitel Probe CONTROL (Run to SW12V Control for Vitel Probes)&lt;br /&gt;
 ' C7 -- TE525M Signal&lt;br /&gt;
 ' C8 -- Thermal Conductivity Control&lt;br /&gt;
 ' SW12V -- Radio Power&lt;br /&gt;
&lt;br /&gt;
 ' Wiring that will need to be moved in May 2013&lt;br /&gt;
 ' C1 -- Move AM16/32B #1 &amp;amp; #2 RES to here&lt;br /&gt;
&lt;br /&gt;
 ' Signal Ground -- HFP01 Shields (Clear Wire), 107 Probe SG (Purple Wire), SR50A&lt;/div&gt;</summary>
		<author><name>24.237.126.141</name></author>
		
	</entry>
</feed>