<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>http://ocotal.iarc.uaf.edu/api.php?action=feedcontributions&amp;feedformat=atom&amp;user=74.124.101.2&amp;*</id>
	<title>IARC 207 Wiki - User contributions [en]</title>
	<link rel="self" type="application/atom+xml" href="http://ocotal.iarc.uaf.edu/api.php?action=feedcontributions&amp;feedformat=atom&amp;user=74.124.101.2&amp;*"/>
	<link rel="alternate" type="text/html" href="http://ocotal.iarc.uaf.edu/index.php?title=Special:Contributions/74.124.101.2"/>
	<updated>2026-10-11T15:51:18Z</updated>
	<subtitle>User contributions</subtitle>
	<generator>MediaWiki 1.34.2</generator>
	<entry>
		<id>http://ocotal.iarc.uaf.edu/index.php?title=NGEE_Barrow_2013_Site_D_Install_Trip_August_2013&amp;diff=2117</id>
		<title>NGEE Barrow 2013 Site D Install Trip August 2013</title>
		<link rel="alternate" type="text/html" href="http://ocotal.iarc.uaf.edu/index.php?title=NGEE_Barrow_2013_Site_D_Install_Trip_August_2013&amp;diff=2117"/>
		<updated>2013-08-19T06:34:49Z</updated>

		<summary type="html">&lt;p&gt;74.124.101.2: &lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;===Goals:===&lt;br /&gt;
* Install [[Barrow Site D Inventory]]&lt;br /&gt;
* Soil Pits&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===Site D Install Instrumentation List:===&lt;br /&gt;
* 5 Temperature Probes (1.5m depth)&lt;br /&gt;
* Possibly one soil pit (soil &amp;amp; water conditions depending)&lt;br /&gt;
* Air Temperature / Relative Humidity @ 1.5 meters&lt;br /&gt;
* Snow Depth @ 2 meters&lt;br /&gt;
* Net Radiation @ 1.5 meters&lt;br /&gt;
* wind speed @ 1.5 meters&lt;br /&gt;
&lt;br /&gt;
===Additional Site Work:===&lt;br /&gt;
* Level Radiometers at the other sites&lt;br /&gt;
* Change out the SR50A snow transducers for the existing stations (7pcs)&lt;br /&gt;
* Change out the pipe for the snow stands (4 pcs)&lt;br /&gt;
** cut 10' pipe to 6 feet &amp;amp; 4 feet.  2 pipes per snow stand.  &lt;br /&gt;
** reuse the nurail (english allen wrenches)&lt;br /&gt;
** reuse the hose clamps (5/16&amp;quot; nut driver)&lt;br /&gt;
* Cable Extensions for Thermal Conductivity sensors @ C site&lt;br /&gt;
* replace thermal conductivity sensors @ C site&lt;br /&gt;
* sledge tower feet&lt;br /&gt;
* remove net radiometer heater wires where they're connected so we just have the fan on.  I guess I go back and forth on this... I really should be logging the on/off toggle of the power for these.  &lt;br /&gt;
* they should also be not drawing current through the logger I suspect....&lt;br /&gt;
* Retrieve Y. Kim's chambers&lt;br /&gt;
&lt;br /&gt;
===Additional Soil Work:===&lt;br /&gt;
* At least 2 soil pits (soil to fill two coolers)&lt;br /&gt;
** outline a pit with the shovel... &lt;br /&gt;
** gps in the location&lt;br /&gt;
** jab saw / shovel the perimeter down to the base of the active layer&lt;br /&gt;
** shoot for two soil samples per cooler so whatever the length of the cooler is divided by two for the length.  width of the cooler for the width of the soil sample (approximately)&lt;br /&gt;
** we will use the soil sample for hydraulic conductivity testing and retain a sample for soil moisture curve work.&lt;br /&gt;
&lt;br /&gt;
===To Purchase:===&lt;br /&gt;
'''[Moved to Agenda area]'''&lt;br /&gt;
&lt;br /&gt;
===Odd Tools:===&lt;br /&gt;
* Laptop &lt;br /&gt;
** serial cable&lt;br /&gt;
** laptop weather resistant housing&lt;br /&gt;
* tool bags&lt;br /&gt;
* pipe wrench&lt;br /&gt;
* cordless drill for precip bucket screws&lt;br /&gt;
* an additional wheelbarrow?&lt;br /&gt;
* 2 coolers&lt;br /&gt;
* GPS system&lt;br /&gt;
&lt;br /&gt;
=== Tools we'll need up there&lt;br /&gt;
* shovels&lt;br /&gt;
* sledge hammer&lt;br /&gt;
* &lt;br /&gt;
===Other===&lt;br /&gt;
Finalize Program Wiring (thermistor vs. thermocouple for the thermal conductivity probes)&lt;br /&gt;
&lt;br /&gt;
===Itinerary:===&lt;br /&gt;
8/19 Bill, Vlad, Bob Busey &amp;amp; Bob Bolton fly out&lt;br /&gt;
* Pick up gear and get ready to haul it out:&lt;br /&gt;
** tower&lt;br /&gt;
** batteries&lt;br /&gt;
** battery box&lt;br /&gt;
** solar panel&lt;br /&gt;
* sledge tower feet&lt;br /&gt;
* haul stuff out by wheel barrow&lt;br /&gt;
* instrumentation&lt;br /&gt;
* shovel&lt;br /&gt;
* coolers (2-3)&lt;br /&gt;
* &lt;br /&gt;
** 2&lt;br /&gt;
* &lt;br /&gt;
* Program&lt;br /&gt;
** 'thermal conductivity with thermistor.cr1'&lt;br /&gt;
&lt;br /&gt;
===Tasks:===&lt;br /&gt;
* Put up tripod&lt;br /&gt;
** grab 4 pieces of trail mat from the NGEE conex&lt;br /&gt;
** set up tripod with&lt;br /&gt;
&lt;br /&gt;
===Additional Maintenance:===&lt;br /&gt;
* Self-tapping screws for precip lids&lt;br /&gt;
* proper pipe for snow stands from 2012 install&lt;br /&gt;
* replace transducers in SR50As -- 7 pcs&lt;br /&gt;
* duct seal remaining holes in the enclosures&lt;br /&gt;
&lt;br /&gt;
===To purchase:===&lt;br /&gt;
* XX Solar Panel&lt;br /&gt;
* Charge controller?&lt;br /&gt;
* XX Additional CSI stuff&lt;br /&gt;
** XX SR50A transducers&lt;br /&gt;
** XX cross arm brackets&lt;br /&gt;
* 1 inch aluminum cross arm (for Bill stock and D site)&lt;br /&gt;
* duct seal&lt;br /&gt;
* &lt;br /&gt;
* Fresh Desiccant for all sites&lt;br /&gt;
&lt;br /&gt;
===To Prep:===&lt;br /&gt;
* wire up data logger box&lt;br /&gt;
** drill 3 inch hole for pipe&lt;br /&gt;
** mount the logger&lt;br /&gt;
** run wires to the multiplexers and current module.&lt;br /&gt;
* power and ground and control for soil moisture pits&lt;br /&gt;
* change the ID on the SR50A &lt;br /&gt;
* Mount hardware in the box&lt;br /&gt;
* crimp connectors for batteries&lt;br /&gt;
* extension cord for solar panel &amp;amp; battery leads&lt;br /&gt;
* strip wires for thermal conductivity probes&lt;br /&gt;
* &lt;br /&gt;
&lt;br /&gt;
===Soil Component:===&lt;br /&gt;
* Bob, Bob&lt;br /&gt;
* Use RTK GPS for coordinates of the pits&lt;br /&gt;
* pull a sled out with a cooler in it.&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===Misc Notes===&lt;br /&gt;
* mark with tape the snow sensors: orange = tower; black = rim; yellow = trough&lt;br /&gt;
* change the transducers while making the hydraprobe terminal strips&lt;br /&gt;
* bring several trail mats from the conex for the D site since it will all sink in.&lt;br /&gt;
* bust into the conex and get the soldering iron.&lt;br /&gt;
* photos at the polygon Bob's using Erode at?&lt;/div&gt;</summary>
		<author><name>74.124.101.2</name></author>
		
	</entry>
	<entry>
		<id>http://ocotal.iarc.uaf.edu/index.php?title=NGEE_Barrow_2013_Site_D_Install_Trip_August_2013&amp;diff=2116</id>
		<title>NGEE Barrow 2013 Site D Install Trip August 2013</title>
		<link rel="alternate" type="text/html" href="http://ocotal.iarc.uaf.edu/index.php?title=NGEE_Barrow_2013_Site_D_Install_Trip_August_2013&amp;diff=2116"/>
		<updated>2013-08-19T05:46:28Z</updated>

		<summary type="html">&lt;p&gt;74.124.101.2: /* Additional Site Work: */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;===Goals:===&lt;br /&gt;
* Install [[Barrow Site D Inventory]]&lt;br /&gt;
* Soil Cores&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===Site D Install Instrumentation List:===&lt;br /&gt;
* 5 Temperature Probes (1.5m depth)&lt;br /&gt;
* Possibly one soil pit (soil &amp;amp; water conditions depending)&lt;br /&gt;
* Air Temperature / Relative Humidity @ 1.5 meters&lt;br /&gt;
* Snow Depth @ 2 meters&lt;br /&gt;
* Net Radiation @ 1.5 meters&lt;br /&gt;
* wind speed @ 1.5 meters&lt;br /&gt;
&lt;br /&gt;
===Additional Site Work:===&lt;br /&gt;
* Level Radiometers at the other sites&lt;br /&gt;
* Change out the SR50A snow transducers for the existing stations (7pcs)&lt;br /&gt;
* Change out the pipe for the snow stands (4 pcs)&lt;br /&gt;
** cut 10' pipe to 6 feet &amp;amp; 4 feet.  2 pipes per snow stand.  &lt;br /&gt;
** reuse the nurail (english allen wrenches)&lt;br /&gt;
** reuse the hose clamps (5/16&amp;quot; nut driver)&lt;br /&gt;
* Cable Extensions for Thermal Conductivity sensors @ C site&lt;br /&gt;
* replace thermal conductivity sensors @ C site&lt;br /&gt;
* sledge tower feet&lt;br /&gt;
* remove net radiometer heater wires where they're connected so we just have the fan on.  I guess I go back and forth on this... I really should be logging the on/off toggle of the power for these.  &lt;br /&gt;
* they should also be not drawing current through the logger I suspect....&lt;br /&gt;
* Retrieve Y. Kim's chambers&lt;br /&gt;
&lt;br /&gt;
===Additional Soil Work:===&lt;br /&gt;
* At least 2 soil pits (soil to fill two coolers)&lt;br /&gt;
** outline a pit with the shovel... &lt;br /&gt;
** gps in the location&lt;br /&gt;
** jab saw / shovel the perimeter down to the base of the active layer&lt;br /&gt;
** shoot for two soil samples per cooler so whatever the length of the cooler is divided by two for the length.  width of the cooler for the width of the soil sample (approximately)&lt;br /&gt;
** we will use the soil sample for hydraulic conductivity testing and retain a sample for soil moisture curve work.&lt;br /&gt;
&lt;br /&gt;
===To Purchase:===&lt;br /&gt;
'''[Moved to Agenda area]'''&lt;br /&gt;
&lt;br /&gt;
===Odd Tools:===&lt;br /&gt;
* Laptop &lt;br /&gt;
** serial cable&lt;br /&gt;
** laptop weather resistant housing&lt;br /&gt;
* tool bags&lt;br /&gt;
* pipe wrench&lt;br /&gt;
* cordless drill for precip bucket screws&lt;br /&gt;
* an additional wheelbarrow?&lt;br /&gt;
* 2 coolers&lt;br /&gt;
* GPS system&lt;br /&gt;
&lt;br /&gt;
=== Tools we'll need up there&lt;br /&gt;
* shovels&lt;br /&gt;
* sledge hammer&lt;br /&gt;
* &lt;br /&gt;
===Other===&lt;br /&gt;
Finalize Program Wiring (thermistor vs. thermocouple for the thermal conductivity probes)&lt;br /&gt;
&lt;br /&gt;
===Itinerary:===&lt;br /&gt;
8/19 Bill, Vlad, Bob Busey &amp;amp; Bob Bolton fly out&lt;br /&gt;
* Pick up gear and get ready to haul it out:&lt;br /&gt;
** tower&lt;br /&gt;
** batteries&lt;br /&gt;
** battery box&lt;br /&gt;
** solar panel&lt;br /&gt;
* sledge tower feet&lt;br /&gt;
* haul stuff out by wheel barrow&lt;br /&gt;
* instrumentation&lt;br /&gt;
* shovel&lt;br /&gt;
* coolers (2-3)&lt;br /&gt;
* &lt;br /&gt;
** 2&lt;br /&gt;
* &lt;br /&gt;
* Program&lt;br /&gt;
** 'thermal conductivity with thermistor.cr1'&lt;br /&gt;
&lt;br /&gt;
===Tasks:===&lt;br /&gt;
* Put up tripod&lt;br /&gt;
** grab 4 pieces of trail mat from the NGEE conex&lt;br /&gt;
** set up tripod with&lt;br /&gt;
&lt;br /&gt;
===Additional Maintenance:===&lt;br /&gt;
* Self-tapping screws for precip lids&lt;br /&gt;
* proper pipe for snow stands from 2012 install&lt;br /&gt;
* replace transducers in SR50As -- 7 pcs&lt;br /&gt;
* duct seal remaining holes in the enclosures&lt;br /&gt;
&lt;br /&gt;
===To purchase:===&lt;br /&gt;
* XX Solar Panel&lt;br /&gt;
* Charge controller?&lt;br /&gt;
* XX Additional CSI stuff&lt;br /&gt;
** XX SR50A transducers&lt;br /&gt;
** XX cross arm brackets&lt;br /&gt;
* 1 inch aluminum cross arm (for Bill stock and D site)&lt;br /&gt;
* duct seal&lt;br /&gt;
* &lt;br /&gt;
* Fresh Desiccant for all sites&lt;br /&gt;
&lt;br /&gt;
===To Prep:===&lt;br /&gt;
* wire up data logger box&lt;br /&gt;
** drill 3 inch hole for pipe&lt;br /&gt;
** mount the logger&lt;br /&gt;
** run wires to the multiplexers and current module.&lt;br /&gt;
* power and ground and control for soil moisture pits&lt;br /&gt;
* change the ID on the SR50A &lt;br /&gt;
* Mount hardware in the box&lt;br /&gt;
* crimp connectors for batteries&lt;br /&gt;
* extension cord for solar panel &amp;amp; battery leads&lt;br /&gt;
* strip wires for thermal conductivity probes&lt;br /&gt;
* &lt;br /&gt;
&lt;br /&gt;
===Soil Component:===&lt;br /&gt;
* Bob, Bob&lt;br /&gt;
* Use RTK GPS for coordinates of the pits&lt;br /&gt;
* pull a sled out with a cooler in it.&lt;/div&gt;</summary>
		<author><name>74.124.101.2</name></author>
		
	</entry>
	<entry>
		<id>http://ocotal.iarc.uaf.edu/index.php?title=NGEE_Barrow_2013_Site_D_Install_Trip_August_2013&amp;diff=2115</id>
		<title>NGEE Barrow 2013 Site D Install Trip August 2013</title>
		<link rel="alternate" type="text/html" href="http://ocotal.iarc.uaf.edu/index.php?title=NGEE_Barrow_2013_Site_D_Install_Trip_August_2013&amp;diff=2115"/>
		<updated>2013-08-19T05:44:57Z</updated>

		<summary type="html">&lt;p&gt;74.124.101.2: /* Additional Site Work: */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;===Goals:===&lt;br /&gt;
* Install [[Barrow Site D Inventory]]&lt;br /&gt;
* Soil Cores&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===Site D Install Instrumentation List:===&lt;br /&gt;
* 5 Temperature Probes (1.5m depth)&lt;br /&gt;
* Possibly one soil pit (soil &amp;amp; water conditions depending)&lt;br /&gt;
* Air Temperature / Relative Humidity @ 1.5 meters&lt;br /&gt;
* Snow Depth @ 2 meters&lt;br /&gt;
* Net Radiation @ 1.5 meters&lt;br /&gt;
* wind speed @ 1.5 meters&lt;br /&gt;
&lt;br /&gt;
===Additional Site Work:===&lt;br /&gt;
* Level Radiometers at the other sites&lt;br /&gt;
* Change out the SR50A snow transducers for the existing stations (7pcs)&lt;br /&gt;
* Change out the pipe for the snow stands (4 pcs)&lt;br /&gt;
* Cable Extensions for Thermal Conductivity sensors @ C site&lt;br /&gt;
* small enclosure &amp;amp; extra logger/MD485 for C site bonus thermal conductivity sensors&lt;br /&gt;
* sledge tower feet&lt;br /&gt;
* remove net radiometer heater wires where they're connected so we just have the fan on.  I guess I go back and forth on this... I really should be logging the on/off toggle of the power for these.  &lt;br /&gt;
* they should also be not drawing current through the logger I suspect....&lt;br /&gt;
* Retrieve Y. Kim's chambers&lt;br /&gt;
&lt;br /&gt;
===Additional Soil Work:===&lt;br /&gt;
* At least 2 soil pits (soil to fill two coolers)&lt;br /&gt;
** outline a pit with the shovel... &lt;br /&gt;
** gps in the location&lt;br /&gt;
** jab saw / shovel the perimeter down to the base of the active layer&lt;br /&gt;
** shoot for two soil samples per cooler so whatever the length of the cooler is divided by two for the length.  width of the cooler for the width of the soil sample (approximately)&lt;br /&gt;
** we will use the soil sample for hydraulic conductivity testing and retain a sample for soil moisture curve work.&lt;br /&gt;
&lt;br /&gt;
===To Purchase:===&lt;br /&gt;
'''[Moved to Agenda area]'''&lt;br /&gt;
&lt;br /&gt;
===Odd Tools:===&lt;br /&gt;
* Laptop &lt;br /&gt;
** serial cable&lt;br /&gt;
** laptop weather resistant housing&lt;br /&gt;
* tool bags&lt;br /&gt;
* pipe wrench&lt;br /&gt;
* cordless drill for precip bucket screws&lt;br /&gt;
* an additional wheelbarrow?&lt;br /&gt;
* 2 coolers&lt;br /&gt;
* GPS system&lt;br /&gt;
&lt;br /&gt;
=== Tools we'll need up there&lt;br /&gt;
* shovels&lt;br /&gt;
* sledge hammer&lt;br /&gt;
* &lt;br /&gt;
===Other===&lt;br /&gt;
Finalize Program Wiring (thermistor vs. thermocouple for the thermal conductivity probes)&lt;br /&gt;
&lt;br /&gt;
===Itinerary:===&lt;br /&gt;
8/19 Bill, Vlad, Bob Busey &amp;amp; Bob Bolton fly out&lt;br /&gt;
* Pick up gear and get ready to haul it out:&lt;br /&gt;
** tower&lt;br /&gt;
** batteries&lt;br /&gt;
** battery box&lt;br /&gt;
** solar panel&lt;br /&gt;
* sledge tower feet&lt;br /&gt;
* haul stuff out by wheel barrow&lt;br /&gt;
* instrumentation&lt;br /&gt;
* shovel&lt;br /&gt;
* coolers (2-3)&lt;br /&gt;
* &lt;br /&gt;
** 2&lt;br /&gt;
* &lt;br /&gt;
* Program&lt;br /&gt;
** 'thermal conductivity with thermistor.cr1'&lt;br /&gt;
&lt;br /&gt;
===Tasks:===&lt;br /&gt;
* Put up tripod&lt;br /&gt;
** grab 4 pieces of trail mat from the NGEE conex&lt;br /&gt;
** set up tripod with&lt;br /&gt;
&lt;br /&gt;
===Additional Maintenance:===&lt;br /&gt;
* Self-tapping screws for precip lids&lt;br /&gt;
* proper pipe for snow stands from 2012 install&lt;br /&gt;
* replace transducers in SR50As -- 7 pcs&lt;br /&gt;
* duct seal remaining holes in the enclosures&lt;br /&gt;
&lt;br /&gt;
===To purchase:===&lt;br /&gt;
* XX Solar Panel&lt;br /&gt;
* Charge controller?&lt;br /&gt;
* XX Additional CSI stuff&lt;br /&gt;
** XX SR50A transducers&lt;br /&gt;
** XX cross arm brackets&lt;br /&gt;
* 1 inch aluminum cross arm (for Bill stock and D site)&lt;br /&gt;
* duct seal&lt;br /&gt;
* &lt;br /&gt;
* Fresh Desiccant for all sites&lt;br /&gt;
&lt;br /&gt;
===To Prep:===&lt;br /&gt;
* wire up data logger box&lt;br /&gt;
** drill 3 inch hole for pipe&lt;br /&gt;
** mount the logger&lt;br /&gt;
** run wires to the multiplexers and current module.&lt;br /&gt;
* power and ground and control for soil moisture pits&lt;br /&gt;
* change the ID on the SR50A &lt;br /&gt;
* Mount hardware in the box&lt;br /&gt;
* crimp connectors for batteries&lt;br /&gt;
* extension cord for solar panel &amp;amp; battery leads&lt;br /&gt;
* strip wires for thermal conductivity probes&lt;br /&gt;
* &lt;br /&gt;
&lt;br /&gt;
===Soil Component:===&lt;br /&gt;
* Bob, Bob&lt;br /&gt;
* Use RTK GPS for coordinates of the pits&lt;br /&gt;
* pull a sled out with a cooler in it.&lt;/div&gt;</summary>
		<author><name>74.124.101.2</name></author>
		
	</entry>
	<entry>
		<id>http://ocotal.iarc.uaf.edu/index.php?title=NGEE_Barrow_2013_Site_D_Install_Trip_August_2013&amp;diff=2114</id>
		<title>NGEE Barrow 2013 Site D Install Trip August 2013</title>
		<link rel="alternate" type="text/html" href="http://ocotal.iarc.uaf.edu/index.php?title=NGEE_Barrow_2013_Site_D_Install_Trip_August_2013&amp;diff=2114"/>
		<updated>2013-08-19T05:43:25Z</updated>

		<summary type="html">&lt;p&gt;74.124.101.2: /* Site D Install Instrumentation List: */&lt;/p&gt;
&lt;hr /&gt;
&lt;div&gt;===Goals:===&lt;br /&gt;
* Install [[Barrow Site D Inventory]]&lt;br /&gt;
* Soil Cores&lt;br /&gt;
&lt;br /&gt;
&lt;br /&gt;
===Site D Install Instrumentation List:===&lt;br /&gt;
* 5 Temperature Probes (1.5m depth)&lt;br /&gt;
* Possibly one soil pit (soil &amp;amp; water conditions depending)&lt;br /&gt;
* Air Temperature / Relative Humidity @ 1.5 meters&lt;br /&gt;
* Snow Depth @ 2 meters&lt;br /&gt;
* Net Radiation @ 1.5 meters&lt;br /&gt;
* wind speed @ 1.5 meters&lt;br /&gt;
&lt;br /&gt;
===Additional Site Work:===&lt;br /&gt;
* Level Radiometers at the other sites&lt;br /&gt;
* Change out the SR50A snow transducers for the existing stations (7pcs)&lt;br /&gt;
* Change out the pipe for the snow stands (4 pcs)&lt;br /&gt;
* Cable Extensions for Thermal Conductivity sensors @ C site&lt;br /&gt;
* small enclosure &amp;amp; extra logger/MD485 for C site bonus thermal conductivity sensors&lt;br /&gt;
* sledge tower feet&lt;br /&gt;
* remove net radiometer heater wires where they're connected so we just have the fan on.  I guess I go back and forth on this... I really should be logging the on/off toggle of the power for these.  &lt;br /&gt;
* they should also be not drawing current through the logger I suspect....&lt;br /&gt;
* still have to measure resistance for the heater wires of the thermal conductivity probes (I remember this being difficult in June)&lt;br /&gt;
&lt;br /&gt;
===Additional Soil Work:===&lt;br /&gt;
* At least 2 soil pits (soil to fill two coolers)&lt;br /&gt;
** outline a pit with the shovel... &lt;br /&gt;
** gps in the location&lt;br /&gt;
** jab saw / shovel the perimeter down to the base of the active layer&lt;br /&gt;
** shoot for two soil samples per cooler so whatever the length of the cooler is divided by two for the length.  width of the cooler for the width of the soil sample (approximately)&lt;br /&gt;
** we will use the soil sample for hydraulic conductivity testing and retain a sample for soil moisture curve work.&lt;br /&gt;
&lt;br /&gt;
===To Purchase:===&lt;br /&gt;
'''[Moved to Agenda area]'''&lt;br /&gt;
&lt;br /&gt;
===Odd Tools:===&lt;br /&gt;
* Laptop &lt;br /&gt;
** serial cable&lt;br /&gt;
** laptop weather resistant housing&lt;br /&gt;
* tool bags&lt;br /&gt;
* pipe wrench&lt;br /&gt;
* cordless drill for precip bucket screws&lt;br /&gt;
* an additional wheelbarrow?&lt;br /&gt;
* 2 coolers&lt;br /&gt;
* GPS system&lt;br /&gt;
&lt;br /&gt;
=== Tools we'll need up there&lt;br /&gt;
* shovels&lt;br /&gt;
* sledge hammer&lt;br /&gt;
* &lt;br /&gt;
===Other===&lt;br /&gt;
Finalize Program Wiring (thermistor vs. thermocouple for the thermal conductivity probes)&lt;br /&gt;
&lt;br /&gt;
===Itinerary:===&lt;br /&gt;
8/19 Bill, Vlad, Bob Busey &amp;amp; Bob Bolton fly out&lt;br /&gt;
* Pick up gear and get ready to haul it out:&lt;br /&gt;
** tower&lt;br /&gt;
** batteries&lt;br /&gt;
** battery box&lt;br /&gt;
** solar panel&lt;br /&gt;
* sledge tower feet&lt;br /&gt;
* haul stuff out by wheel barrow&lt;br /&gt;
* instrumentation&lt;br /&gt;
* shovel&lt;br /&gt;
* coolers (2-3)&lt;br /&gt;
* &lt;br /&gt;
** 2&lt;br /&gt;
* &lt;br /&gt;
* Program&lt;br /&gt;
** 'thermal conductivity with thermistor.cr1'&lt;br /&gt;
&lt;br /&gt;
===Tasks:===&lt;br /&gt;
* Put up tripod&lt;br /&gt;
** grab 4 pieces of trail mat from the NGEE conex&lt;br /&gt;
** set up tripod with&lt;br /&gt;
&lt;br /&gt;
===Additional Maintenance:===&lt;br /&gt;
* Self-tapping screws for precip lids&lt;br /&gt;
* proper pipe for snow stands from 2012 install&lt;br /&gt;
* replace transducers in SR50As -- 7 pcs&lt;br /&gt;
* duct seal remaining holes in the enclosures&lt;br /&gt;
&lt;br /&gt;
===To purchase:===&lt;br /&gt;
* XX Solar Panel&lt;br /&gt;
* Charge controller?&lt;br /&gt;
* XX Additional CSI stuff&lt;br /&gt;
** XX SR50A transducers&lt;br /&gt;
** XX cross arm brackets&lt;br /&gt;
* 1 inch aluminum cross arm (for Bill stock and D site)&lt;br /&gt;
* duct seal&lt;br /&gt;
* &lt;br /&gt;
* Fresh Desiccant for all sites&lt;br /&gt;
&lt;br /&gt;
===To Prep:===&lt;br /&gt;
* wire up data logger box&lt;br /&gt;
** drill 3 inch hole for pipe&lt;br /&gt;
** mount the logger&lt;br /&gt;
** run wires to the multiplexers and current module.&lt;br /&gt;
* power and ground and control for soil moisture pits&lt;br /&gt;
* change the ID on the SR50A &lt;br /&gt;
* Mount hardware in the box&lt;br /&gt;
* crimp connectors for batteries&lt;br /&gt;
* extension cord for solar panel &amp;amp; battery leads&lt;br /&gt;
* strip wires for thermal conductivity probes&lt;br /&gt;
* &lt;br /&gt;
&lt;br /&gt;
===Soil Component:===&lt;br /&gt;
* Bob, Bob&lt;br /&gt;
* Use RTK GPS for coordinates of the pits&lt;br /&gt;
* pull a sled out with a cooler in it.&lt;/div&gt;</summary>
		<author><name>74.124.101.2</name></author>
		
	</entry>
</feed>