	<title>Tower Remodel 2 - Revision history</title>
	<link rel="self" type="application/atom+xml" href="http://ocotal.iarc.uaf.edu/index.php?action=history&amp;feed=atom&amp;title=Tower_Remodel_2"/>
	<link rel="alternate" type="text/html" href="http://ocotal.iarc.uaf.edu/index.php?title=Tower_Remodel_2&amp;action=history"/>
	<updated>2026-04-19T21:14:16Z</updated>
	<subtitle>Revision history for this page on the wiki</subtitle>
	<generator>MediaWiki 1.34.2</generator>
	<entry>
		<id>http://ocotal.iarc.uaf.edu/index.php?title=Tower_Remodel_2&amp;diff=3636&amp;oldid=prev</id>
		<title>172.18.0.1: Created page with &quot;Here are the items in the prioritized order.  First of all, you can add up labor of up to about 3 weeks x 2 persons.  ===Item 1: add more ground anchor support to each of the...&quot;</title>
		<link rel="alternate" type="text/html" href="http://ocotal.iarc.uaf.edu/index.php?title=Tower_Remodel_2&amp;diff=3636&amp;oldid=prev"/>
		<updated>2019-02-28T01:45:09Z</updated>

		<summary type="html">&lt;p&gt;Created page with &amp;quot;Here are the items in the prioritized order.  First of all, you can add up labor of up to about 3 weeks x 2 persons.  ===Item 1: add more ground anchor support to each of the...&amp;quot;&lt;/p&gt;
&lt;p&gt;&lt;b&gt;New page&lt;/b&gt;&lt;/p&gt;&lt;div&gt;Here are the items in the prioritized order.&lt;br /&gt;
&lt;br /&gt;
First of all, you can add up labor of up to about 3 weeks x 2 persons.&lt;br /&gt;
&lt;br /&gt;
===Item 1: add more ground anchor support to each of the guy wire anchors===&lt;br /&gt;
If it is better to replace the existing wires, I would like to include that work, too. &lt;br /&gt;
Do you think what else we can do for the tower? e.g. the reinforcement/leveling the base of the tower, adding some pipes in the lower part of the tower. &lt;br /&gt;
If you think we don't have further things, just adding the wires is fine.&lt;br /&gt;
* Add additional screw anchors&lt;br /&gt;
** &lt;br /&gt;
* guy wire hardware&lt;br /&gt;
** https://www.scaffoldframe.com/Scaffolding_Swivel_Clamp_p/cmpsw-set.htm  $96 per ten plus shipping... 30pcs?&lt;br /&gt;
* https://www.homedepot.com/p/Milwaukee-M18-FUEL-18-Volt-Lithium-Ion-Brushless-Cordless-1-9-16-in-SDS-Max-Rotary-Hammer-Kit-W-1-9-0Ah-Battery-Hard-Case-2717-21HD/300184965&lt;br /&gt;
* need to do a bit of design work here.&lt;br /&gt;
* Mulch for tower base area... start with 30 bags?&lt;br /&gt;
* Hammer Drill plus screed stakes and rebar instead of &lt;br /&gt;
** https://www.homedepot.com/p/2-cu-ft-Pine-Bark-Nuggets-B2PBL-SR/202526086&lt;br /&gt;
===Item 2: Purchasing a scientific mast. (for example https://www.campbellsci.com/ut30)===&lt;br /&gt;
This is because even though we reinforce the tower perfectly, we cannot completely &lt;br /&gt;
avoid the serious tower damage due to sever meteorological conditions. &lt;br /&gt;
If the tower is severely damaged, most probably, we'll lose the opportunity of a couple of years measurements &lt;br /&gt;
because rebuilding the tower takes much more time (getting another budget and planning, etc).&lt;br /&gt;
Just in case, I'd like to have a scientific mast so that we can quickly restart the minimum level of measurements with a mast.&lt;br /&gt;
Harazono san, Ueyama san are using the mast for their measurements in spruce forest so I think it's feasible and I know the mast itself is not so expensive,&lt;br /&gt;
however, I am not sure this idea is a good alternate for the tower measurements and feasibility of installation at our super site.  &lt;br /&gt;
I'd like to hear your expert opinion. If it is feasible, I want to further discuss that we just purchase a mast frame and keep it in the storage &lt;br /&gt;
or start construction work.&lt;br /&gt;
* we have wire on hand for this.  I'll need to buy thimbles and turnbuckles.&lt;br /&gt;
* also buy parts for the tilting base.&lt;br /&gt;
&lt;br /&gt;
===Item 3: add a deeper bore hole (3 to 10 meters) ===&lt;br /&gt;
The investigation of deep soil layer is necessary to know the ground conditions and the potential impact on the tower structure.  &lt;br /&gt;
This work has been also approved however, I have no idea how much you would need to do whether it is possible within the target budget of $52,000.&lt;br /&gt;
Please let us know the feasibility within the budget allowed.&lt;br /&gt;
&lt;br /&gt;
===Item 4 Re-arrangement of data logger, cables ===&lt;br /&gt;
- replace / upgrade the existing CR1000s or at least send the data loggers back for re-calibration of the analog measurement ports.&lt;br /&gt;
- move the meteorological data logger from the shed to the base of the tower&lt;br /&gt;
In addition, some cables from the tower to shed are exposed under the surface water (wet surface) . &lt;br /&gt;
If there is a concern of power leakage or cable degradation, I'd like to ask to replace/rearrange them, too.&lt;br /&gt;
&lt;br /&gt;
===Item 5 Shed and board walk repair===&lt;br /&gt;
- level the shed &amp;amp; repaint&lt;br /&gt;
- Leveling of the board walk. &lt;br /&gt;
 &lt;br /&gt;
===Item 6:  A network of camera security motion camera for protection of the site===&lt;br /&gt;
This is a good idea, so I want to put it in the task, but the camera itself is not very expensive,&lt;br /&gt;
so if the budget is overran, I'll get it from other source of budget.&lt;br /&gt;
&lt;br /&gt;
===Item 7: Add more batteries to back-up power supply system in case of outage===&lt;br /&gt;
I think the back-up power supply system is a good idea. &lt;br /&gt;
Because some batteries' cost are included in the cost estimates of this year's site maintenance project.&lt;br /&gt;
So please consider to buy from site maintenance project, first. Then you think it is better to add more, &lt;br /&gt;
please add more batteries in this site reinforcement project.&lt;br /&gt;
&lt;br /&gt;
===Item 8: More Sensors===&lt;br /&gt;
* distributed soil moisture and temperature covering a larger footprint around the tower than is currently captured by our soil pits&lt;br /&gt;
* same for heat flux (or perhaps wired)&lt;br /&gt;
I've purchased soil moisture and temperature sensors, five CS650 sensors and two soil heat flux sensors, HFP-01SC.&lt;br /&gt;
I can get it a little more after April. Before the summer this year, I'll send it to you.&lt;br /&gt;
&lt;br /&gt;
* a couple multispectral cameras for summer drone flights&lt;br /&gt;
Because this is less related with the tower reinforcement, &lt;br /&gt;
unfortunately, we cannot afford it by this project budget.&lt;br /&gt;
However, I agree this is really interesting measurements.&lt;br /&gt;
I'll put it in our wishing list.&lt;/div&gt;</summary>