Difference between revisions of "Umiat May 2010 Field Trip"

From IARC 207 Wiki
Jump to navigation Jump to search
Line 13: Line 13:
 
* June 3 UAF crew + cook departs Umiat, Horst group arrives for camp tear down
 
* June 3 UAF crew + cook departs Umiat, Horst group arrives for camp tear down
 
* June 5 2 flights for Horst crew demob to Fairbanks
 
* June 5 2 flights for Horst crew demob to Fairbanks
 
  
 
== Logistics To DO ==
 
== Logistics To DO ==
 
* Book Wright Air Flights
 
* Book Wright Air Flights
* Assist with permitting for Horst Camp
+
* Coordinate flights w/ BLM Richard
 +
* Assist with DEC permitting for Horst Camp as needed
 
* UIC Quote - Bill  
 
* UIC Quote - Bill  
* Horst camp weights
+
* Horst camp weights (Josh Horst)
 
* UAF equip weights
 
* UAF equip weights
 +
* ADCP Q msmst cheat sheet Emily/Bob
 +
* Trimble GPS set up cheat sheet (Bill Lee)
  
 
== To DO for Field Prep ==
 
== To DO for Field Prep ==

Revision as of 08:56, 12 April 2010

Umiat May 2010 Logistics

This website helps me organize everything that needs to get done for the Umiat logistics May 2010.

(EKY Last Update 4/12/10)

Schedule

  • April 12-17 Umiat Runway Plowed by UIC
  • May 8-9 DOT plow runway?
  • May 8-12 Richard to Umiat Daily BLM flights to Umiat, 1 UAF camp supplies flight 1 UAF staff flight 1 UAF equipment/gear flight?
  • May 9-11 Horst Camp to Umiat 2 flights mobilization
  • May 11 or 12 UAF crew & Horst camp to Umiat (1 or 2 flights? Gear weight)
  • May 19 Ken to Umiat, Bob to Prudhoe (Dave B. to Umiat w/ BLM). Resupply Horst camp.
  • June 3 UAF crew + cook departs Umiat, Horst group arrives for camp tear down
  • June 5 2 flights for Horst crew demob to Fairbanks

Logistics To DO

  • Book Wright Air Flights
  • Coordinate flights w/ BLM Richard
  • Assist with DEC permitting for Horst Camp as needed
  • UIC Quote - Bill
  • Horst camp weights (Josh Horst)
  • UAF equip weights
  • ADCP Q msmst cheat sheet Emily/Bob
  • Trimble GPS set up cheat sheet (Bill Lee)

To DO for Field Prep

  • Test ADCPs in river
  • River Surveyor ADCP/GPS set up and testing in river
  • Novatel GPS configuration files
  • Trimble memory upgrade and battery cable
  • Configure HOBO meters
  • Survival kits put together
  • Manuals/Guidance

Equipment/Supplies to Send to Umiat

  • 1 drum unleaded fuel for boat motor and misc. use
  • Spare Aquistar PTs
  • HOBO PTs + data reader
  • Wall tent supplies @ red door
  • 3- 12V 100 a-h batteries (ADCP, Trimble GPS, spare)
  • battery charger
  • Trimble GPS and tripod
  • ADCP Rio Grande
  • ADCP River Surveyor
  • Novatel GPS and wiring harnesses, config files
  • Big Toughbook
  • 2 radios
  • 2 GPS tripods
  • spare drybags
  • life jackets (2 to Itkillik, 2 to Chandler)
  • printer
  • Disc weights for PTs
  • Hose clamps
  • sledgehammers
  • rebar drive head
  • level, survey tripod, rod
  • backup hardrives
  • flow tracker, rod, manuals
  • binoculars
  • laser rangefinder
  • helo helmets
  • Satellite phones (2)
  • Shotguns + ammo (2)
  • spare boat & motor parts
  • survival/safety bags
  • misc. stream gauging parts
  • Manuals/Guidance