Difference between revisions of "JB March 2011 Shopping List 2"

From IARC 207 Wiki
Jump to navigation Jump to search
 
 
Line 1: Line 1:
 
 
Tripod Shopping Round 2
 
Tripod Shopping Round 2
 
* '''8pcs''' 3' screed stake
 
* '''8pcs''' 3' screed stake
Line 6: Line 5:
 
** To Airtemp (small)
 
** To Airtemp (small)
 
** To subsurface (medium)
 
** To subsurface (medium)
** To Sap flow (TBD)
+
** To Sap flow (TBD) - this might be cost prohibitive since we could end up needing 100' per site -Bill
 
* Cord Grips for the wires coming into the action packer?
 
* Cord Grips for the wires coming into the action packer?
 
** Budget based-decision
 
** Budget based-decision
 
* Electricians Putty?
 
* Electricians Putty?

Latest revision as of 09:54, 23 March 2011

Tripod Shopping Round 2

  • 8pcs 3' screed stake
  • flexible metal conduit (several sizes)
    • To Precip (small)
    • To Airtemp (small)
    • To subsurface (medium)
    • To Sap flow (TBD) - this might be cost prohibitive since we could end up needing 100' per site -Bill
  • Cord Grips for the wires coming into the action packer?
    • Budget based-decision
  • Electricians Putty?