Difference between revisions of "Inside Box"
Jump to navigation
Jump to search
(One intermediate revision by the same user not shown) | |||
Line 9: | Line 9: | ||
# wire up logger to mux | # wire up logger to mux | ||
# run power wire to battery | # run power wire to battery | ||
− | # install fuse holder & extra fuses | + | # install fuse holder & extra fuses (1 for sap, 1 for logger) |
+ | |||
+ | ====Yet To Do==== | ||
+ | * Mount a terminal strip to the wood | ||
+ | * run power from the strip to the logger & the sap flow module | ||
+ | * add connectors to the solar panel charge controller line | ||
+ | * drill holes in the clear box for the cables to come in. | ||
+ | ** 5 sap flow | ||
+ | ** 2 CS616 (SM) | ||
+ | ** 2 107 (STemp) | ||
+ | ** 1 Precip | ||
+ | ** 1 HMP45C (AT/RH) | ||
+ | ** 2 Power |
Latest revision as of 14:48, 1 April 2011
Tools:
- CSI Screw driver
- crimping tool
- Wire snips
The Plan
- mount the instrumentation to inside the clear tote.
- secure to wood with screws
- wire up logger to mux
- run power wire to battery
- install fuse holder & extra fuses (1 for sap, 1 for logger)
Yet To Do
- Mount a terminal strip to the wood
- run power from the strip to the logger & the sap flow module
- add connectors to the solar panel charge controller line
- drill holes in the clear box for the cables to come in.
- 5 sap flow
- 2 CS616 (SM)
- 2 107 (STemp)
- 1 Precip
- 1 HMP45C (AT/RH)
- 2 Power