Line 11: | Line 11: | ||
* Voltmeter | * Voltmeter | ||
* tool bag | * tool bag | ||
+ | * round file | ||
* cordless drill | * cordless drill | ||
** extra battery | ** extra battery | ||
Line 23: | Line 24: | ||
* CSI screw driver | * CSI screw driver | ||
* Snow Shoes | * Snow Shoes | ||
− | * Sled or | + | * Sled or three |
* GPS | * GPS | ||
+ | * Poles for sled | ||
+ | * ear protection | ||
+ | * sunglasses | ||
+ | * bike stereo? | ||
+ | * longhandled pruning shears | ||
+ | * keypad | ||
To Purchase: | To Purchase: | ||
Line 37: | Line 44: | ||
* 12V Battery | * 12V Battery | ||
* Solar Panel | * Solar Panel | ||
+ | * Needed bolts for 12V Batteries | ||
+ | |||
+ | To Bring from home (Bob Busey):<br/> | ||
+ | * Drill bit for instrumentation holes | ||
+ | * GPS | ||
+ | * Breaker Bar | ||
+ | * Pruning Shears | ||
To Do:<br/> | To Do:<br/> | ||
− | # Snow shoe gear to site | + | # ''Snow shoe'' gear to site via ''sled'' |
# Make a snow SWE & Depth measurement? | # Make a snow SWE & Depth measurement? | ||
# Clear ground near SM Pit of snow but be sure not to walk up the hill from the pit. | # Clear ground near SM Pit of snow but be sure not to walk up the hill from the pit. | ||
Line 45: | Line 59: | ||
## Drill 4 holes for SM | ## Drill 4 holes for SM | ||
## Drill 2 holes for ST | ## Drill 2 holes for ST | ||
− | ## Label with electrical tape both ends of the SM & ST (install @ | + | ## Label with electrical tape both ends of the SM & ST (install @ 5cm bgs and 40 cm bgs) |
− | ### Orange = | + | ### Orange = 5 cmbgs |
### Blue = 40 cmbgs | ### Blue = 40 cmbgs | ||
# Do Sap Stuff & label wires | # Do Sap Stuff & label wires | ||
− | # Put together Tripod | + | # Put together Tripod: |
− | + | ## Put legs back on the 2x12 -> ''7/16 Nut Driver or wrench'' | |
− | ## Put legs back on the 2x12 | + | ### '''Cone nut / Regular Washer / 1" x 1/4 Bolt''' -> 2x per leg (2 legs) |
− | ## | + | ## Mount cross arm on legs -> ''7/16 Nut Driver or wrench'' |
− | ## Mount SP to cross arm | + | ### '''Cone nut / Fender Washer / 1" x 1/4 Bolt''' -> 1x per leg (2 legs) |
− | ## Mount | + | ## Mount SP to cross arm -> ''7/16 Nut Driver or wrench'' |
− | ## Pound 12" | + | ### '''Cone nut / Fender Washer / 1" x 1/4 Bolt''' -> 1x per leg (2 legs) |
− | ## Hoseclamp AT Pole to cross arm | + | ## Mount 90degree unistrut angle to 2x12 with ''#2 Phillips & Cordless Drill'' |
− | ## Drill holes in clear tote and actionpacker for instrumentation (what is out there plus precip) | + | ### '''Wood Screw / Fender Washer / Unistrut Angle''' |
− | ## | + | ## Pound '''12" Galvanized spike''' through '''square washers''' and '''90degree unistrut angles''', then into the ground (2 unistrut legs, 1 2x12) using the hand maul or sledge hammer. |
− | # Wire sensors to data logger | + | ## '''Hoseclamp''' AT Pole to cross arm w/ ''5/16" Nut Driver'' |
− | ## See wiring page / program | + | ## Inside Actionpacker work: |
+ | ### Secure wooden backpanel to 2x12 w/ '''2 wood screws''' & ''#2 Phillips cordless screwdriver'' | ||
+ | ### '''Drill holes''' in '''clear tote''' and '''actionpacker''' for instrumentation (enough ''1/2" holes'' for what is out there plus precip) | ||
+ | ### Use ''round file'' if needed to clean up any drilled holes | ||
+ | ### Wire sensors to data logger | ||
+ | #### See wiring page / program | ||
+ | #### Print Program & Bring-with | ||
+ | ### Put battery in box | ||
+ | ### Wire battery to charge controller w/ ''1/2" nut driver'' |
Latest revision as of 18:14, 11 April 2011
Starting with south facing high hillslope site.
Oh, we need to figure out if there is any money left to spend to get up to $5,000 per site. If yes, cable protection should be purchased.
To Bring Tools:
- jack hammer & gas (chipping out SM pit)
- Shovels (at least 2) -- snow removal from pit and tripod area
- compass (make sure SP is south-facing)
- hand maul (for pounding in pins & stakes)
- Voltmeter
- tool bag
- round file
- cordless drill
- extra battery
- both charged
- screwdriver for a couple of tripod bits
- long drill bit for SM
- short drill bit for 107 probe
- short drill bit for punching holes in the actionpacker for instrumentation
- 7/16" nut driver
- 7/16" wrench
- 5/16" nut driver
- CSI screw driver
- Snow Shoes
- Sled or three
- GPS
- Poles for sled
- ear protection
- sunglasses
- bike stereo?
- longhandled pruning shears
- keypad
To Purchase:
- Another drill bit for SM,
- One for ST
To Bring Site Related:
- Sap Flow stuff
- Screed stakes (3 pcs) (for precip setup)
- 12" Pins (I can't remember what I called these on the shopping page)
- Hose Clamps
- 12V Battery
- Solar Panel
- Needed bolts for 12V Batteries
To Bring from home (Bob Busey):
- Drill bit for instrumentation holes
- GPS
- Breaker Bar
- Pruning Shears
To Do:
- Snow shoe gear to site via sled
- Make a snow SWE & Depth measurement?
- Clear ground near SM Pit of snow but be sure not to walk up the hill from the pit.
- Chip out SM Pit, put organic lid on one tarp and the excavated dirt on another. (And snow? Bob and I talked I just can't remember again...)
- Drill 4 holes for SM
- Drill 2 holes for ST
- Label with electrical tape both ends of the SM & ST (install @ 5cm bgs and 40 cm bgs)
- Orange = 5 cmbgs
- Blue = 40 cmbgs
- Do Sap Stuff & label wires
- Put together Tripod:
- Put legs back on the 2x12 -> 7/16 Nut Driver or wrench
- Cone nut / Regular Washer / 1" x 1/4 Bolt -> 2x per leg (2 legs)
- Mount cross arm on legs -> 7/16 Nut Driver or wrench
- Cone nut / Fender Washer / 1" x 1/4 Bolt -> 1x per leg (2 legs)
- Mount SP to cross arm -> 7/16 Nut Driver or wrench
- Cone nut / Fender Washer / 1" x 1/4 Bolt -> 1x per leg (2 legs)
- Mount 90degree unistrut angle to 2x12 with #2 Phillips & Cordless Drill
- Wood Screw / Fender Washer / Unistrut Angle
- Pound 12" Galvanized spike through square washers and 90degree unistrut angles, then into the ground (2 unistrut legs, 1 2x12) using the hand maul or sledge hammer.
- Hoseclamp AT Pole to cross arm w/ 5/16" Nut Driver
- Inside Actionpacker work:
- Secure wooden backpanel to 2x12 w/ 2 wood screws & #2 Phillips cordless screwdriver
- Drill holes in clear tote and actionpacker for instrumentation (enough 1/2" holes for what is out there plus precip)
- Use round file if needed to clean up any drilled holes
- Wire sensors to data logger
- See wiring page / program
- Print Program & Bring-with
- Put battery in box
- Wire battery to charge controller w/ 1/2" nut driver
- Put legs back on the 2x12 -> 7/16 Nut Driver or wrench