Difference between revisions of "Toolik DOT 2011-05-20"

From IARC 207 Wiki
Jump to navigation Jump to search
 
 
(7 intermediate revisions by the same user not shown)
Line 8: Line 8:
  
 
===Tasks===
 
===Tasks===
 +
 +
====Toolik Prep====
 +
* Get gas for jerry jug
 +
* gas for 5horse
 +
* dye supplies
 +
* dye spreadsheet
 +
* More PT rebars for water measurements
 +
* bring memory card for plant cam
 +
* bring out bubble level for surveying again
 +
* get survey gear from Joel (re: our broken rod)
  
 
====Itkillik Station====
 
====Itkillik Station====
 
* Snow Survey
 
* Snow Survey
 
** Everything is on site
 
** Everything is on site
* Start Surveying
+
* Surveying?
 +
** Everything is on site
 +
* GPS Survey GPS Master #1 Rebar #1 (& identify it with spray paint maybe?)
 
* Paint top of culvert
 
* Paint top of culvert
 
* Standard aerial pictures of gaging cross-section
 
* Standard aerial pictures of gaging cross-section
 
* Identify Dye Locations (Start & Finish)
 
* Identify Dye Locations (Start & Finish)
 +
* Set up Cataraft
 +
* Identify safe water exit points in case of accidents
  
 
====Itkillik River Crossing====
 
====Itkillik River Crossing====
Line 21: Line 35:
 
** Digital Camera
 
** Digital Camera
 
* Plant Cam Setup
 
* Plant Cam Setup
** 6 pieces of Rebar (@cam spot... X pieces)
+
** change out memory card
** 2 tarps (@Toolik)
 
** Spray Paint (@station)
 
** cloth tape measure (in helicopter)
 
** sledge hammer (in helicopter)
 
** para cord to keep the plant cam from bouncing in the wind? (back of truck)
 
  
 
====Peak Flow Gaging Site====
 
====Peak Flow Gaging Site====
 
* Settle on a location (Get a visual of it)
 
* Settle on a location (Get a visual of it)
 
====Hobo #3 Location====
 
* Spare Hobo (@Toolik)
 
** Program in camp on 5/18
 
* hobo environmental protection (@snowmachine trailer)
 
* steel cable (in helicopter)
 
* cable clamps (with Bill)
 
* weight (in helicopter?)
 
* sledge hammer (in helicopter)
 
* screed stakes (in helicopter)
 
** 1 for hobo in river
 
** 1 for hobo anchor on the bank
 
** 1 for GPS Master 3
 
* Tools --
 
** 5/16" Nut Driver for hose clamps
 
** 1/4" wrench or leatherman for steel cable clamps
 
** shovel or two
 
** ice pick
 
** breaker bar
 
**
 
  
 
===Tools===
 
===Tools===
 
* Bob's toolbags (in helicopter)
 
* Bob's toolbags (in helicopter)
 
* Shovels (in helicopter)
 
* Shovels (in helicopter)
 +
* Dry suits & boots
 +
* cordless drill
 +
* unbroken survey rod & tripod
  
 
===Things to do yet in Toolik===
 
===Things to do yet in Toolik===
* Update firmware on streampro
 
 
* Follow up on Ken's email about other station work
 
* Follow up on Ken's email about other station work
** Line out coordinates and a game plan for these sites
+
* Continue Daily Computer Backups
* Test out GPS scripts with StreamPro
+
* Umiat Send list:
* Start Daily Backups
+
** Trimble Setup
* Move the rest of the gear to the station
+
** Trimble Tripod
 +
** 50W solar panel
 +
** unistrut
 +
** quarter inch bolts (short)
 +
* Staff gauges

Latest revision as of 07:50, 20 May 2011

Coordinates

Itkillik Station -- Lat: 68 51.991, Lon: -150 2.400, Elev: 458 meters (1504 feet)
Northern Extent of Open Water -- Lat: N68 40,331, Lon: -149 50.279
PlantCam -- Lat: N68 54.757, Lon: -150 05.697
Hobo #2 -- Lat: N68 52 13.1", Lon: - 150 02 59.2"
Hobo #3 -- Lat: N68 52 44.72", Lon: -150 03 57.63"
Probable Peak Flow Gaging Location -- Lat: N68

Tasks

Toolik Prep

  • Get gas for jerry jug
  • gas for 5horse
  • dye supplies
  • dye spreadsheet
  • More PT rebars for water measurements
  • bring memory card for plant cam
  • bring out bubble level for surveying again
  • get survey gear from Joel (re: our broken rod)

Itkillik Station

  • Snow Survey
    • Everything is on site
  • Surveying?
    • Everything is on site
  • GPS Survey GPS Master #1 Rebar #1 (& identify it with spray paint maybe?)
  • Paint top of culvert
  • Standard aerial pictures of gaging cross-section
  • Identify Dye Locations (Start & Finish)
  • Set up Cataraft
  • Identify safe water exit points in case of accidents

Itkillik River Crossing

  • Pictures @ Bridge crossing
    • Digital Camera
  • Plant Cam Setup
    • change out memory card

Peak Flow Gaging Site

  • Settle on a location (Get a visual of it)

Tools

  • Bob's toolbags (in helicopter)
  • Shovels (in helicopter)
  • Dry suits & boots
  • cordless drill
  • unbroken survey rod & tripod

Things to do yet in Toolik

  • Follow up on Ken's email about other station work
  • Continue Daily Computer Backups
  • Umiat Send list:
    • Trimble Setup
    • Trimble Tripod
    • 50W solar panel
    • unistrut
    • quarter inch bolts (short)
  • Staff gauges