Difference between revisions of "SS June/Jul 2011 Trip 1"

From IARC 207 Wiki
Jump to navigation Jump to search
 
Line 15: Line 15:
 
** ''50    1      *    *    *  (shutdown -r now)''
 
** ''50    1      *    *    *  (shutdown -r now)''
 
* log temperatures and wireless signal strength, refresh brain on what I have set up up there
 
* log temperatures and wireless signal strength, refresh brain on what I have set up up there
 +
 +
CPCRW Trip:
 +
* Download data from all four sites
 +
* bring out solder and soldering iron to patch up chopped up wires
 +
* electrical tape
 +
* net radiometers
 +
* anemometers
 +
*

Revision as of 15:00, 29 June 2011

Combo with CPCRW trip maybe. In Fairbanks

  • Add 2 AT/RH to measurements and outputs.
  • Drill holes for ubolts

Fieldwork

  • Finish Anchors
  • Wire AT/RH
  • send program to met logger

Computerwork

  • change scp in camera scripts to rsync
    • rsync -avz -e "ssh -p 22 -i ~/.ssh/rsync-key" /local_image_dir/ pfss@main_server.iarc.uaf.edu:/remote_destination/
  • set computer up to restart nightly so this wireless disconnection stops being a bother.
    • 50 1 * * * (shutdown -r now)
  • log temperatures and wireless signal strength, refresh brain on what I have set up up there

CPCRW Trip:

  • Download data from all four sites
  • bring out solder and soldering iron to patch up chopped up wires
  • electrical tape
  • net radiometers
  • anemometers