===Notes=== | ===Notes=== | ||
* [[NGEE Barrow Intensive Sites Initial Wiring]] | * [[NGEE Barrow Intensive Sites Initial Wiring]] | ||
− | * First Program: https://github.com/frankohanlon/ngee/blob/master/ngee_intensive_site_subset.CR1 | + | * First Program (not including thermal offsets which will be added onsite): |
+ | ** https://github.com/frankohanlon/ngee/blob/master/ngee_intensive_site_subset.CR1 | ||
+ | |||
+ | ===Metadata type stuff=== | ||
+ | * [[NGEE-Barrow Calibration and Serial Numbers]] | ||
+ | * Timezone - UTC | ||
+ | * PakBus IDs - A = 400; B = 401; C = 402; D = 403 | ||
+ | |||
+ | ===Supplies / Equipment the GIPL is providing to the project that will need to be replaced=== | ||
+ | * 4 Tripods | ||
+ | * 4 CrossArms | ||
+ | * 4 Radiation Shields | ||
+ | * 4 107 Temperature Probes | ||
+ | * 24 Thermal Conductivity sensors from East30 | ||
+ | * 8 Current Excitation Modules | ||
+ | * 8 AM16/32 Multiplexers | ||
+ | * 4 CR1000s | ||
+ | * Instrument box | ||
+ | * charge controller | ||
+ | |||
+ | === Supplies / Equipment IARC is providing to the project that will need to be replaced=== | ||
+ | * Radios? | ||
+ | ** set hopping channels to an alternate | ||
+ | ** set up in multipoint mode | ||
+ | * Power Cables? | ||
+ | |||
+ | ===Enroute=== | ||
+ | * Battery Boxes should arrive 8/30ish | ||
+ | * batteries I'm not sure of but should arrive near our departure. | ||
+ | |||
+ | ===Program to do yet=== | ||
+ | * add radio on/off | ||
+ | * seasonal snow measurements | ||
+ | * low battery voltage checks before running thermal conductivity probes | ||
+ | * test final program | ||
+ | * add the thermal conductivity probes | ||
===Pre-trip to do=== | ===Pre-trip to do=== | ||
− | * | + | * Cut Pipe |
+ | * Ship stuff: thinking two loads | ||
+ | ** shipment 1 ship Wednesday and that will be stuff we'll need on arrival | ||
+ | ** shipment 2 ship Friday and that will be things still being prepped early next week. | ||
+ | * Organize per site items | ||
+ | ** Precip Stand | ||
+ | *** 3 screed stakes | ||
+ | *** Pipe: 2 pcs 5 ft; 1 pcs 2.5' | ||
+ | *** Hose Clamps (2 sizes) | ||
+ | *** NuRail fittings (currently in Bob's office) | ||
+ | ** Tripod Related | ||
+ | *** 1 pcs tripod | ||
+ | *** 1 pcs instrument box & contents: | ||
+ | **** cable ties | ||
+ | **** AM16/32s | ||
+ | **** 2 pcs current excitation module | ||
+ | **** 1 pcs CR1000 | ||
+ | **** 1 pcs radio & power cable | ||
+ | **** 1 pcs radio antenna setup | ||
+ | **** 1 pcs null modem | ||
+ | *** Energy system | ||
+ | **** 1 pcs solar panel | ||
+ | **** 2 pcs ubolts for solar panel mount | ||
+ | **** 2 pcs aluminum strips for solar panel mount | ||
+ | **** 4 pcs nuts & bolts for solar panel mount | ||
+ | **** Batteries if they arrive | ||
+ | **** Ring connectors for batteries | ||
+ | **** power cable to go between batteries | ||
+ | **** power cable to go battery box to instrument box | ||
+ | **** cable protection between battery box and instrument box | ||
+ | **** power cable to go between solar panel and battery box | ||
+ | **** cable protection to go between solar panel and battery box | ||
+ | **** cold temperature power cable (red & black or an all-weather extension cord) | ||
+ | **** 1 pcs power cable from solar panel | ||
+ | **** 1 pcs cable protection for solar panel cable (sort of left off cable protection estimates I'm thinking) | ||
+ | **** 1 pcs charge controller | ||
+ | *** 1 pcs SR50A setup | ||
+ | **** 5' x 3/4" Pipe | ||
+ | **** SR50A setup | ||
+ | **** 1 pcs SR50A | ||
+ | **** 1 pcs SR50A mount | ||
+ | **** 1 pcs SR50A cable | ||
+ | **** 1 pcs SR50A cable protection | ||
+ | *** Air Temperature Setup | ||
+ | **** 1 pcs AT radiation shield | ||
+ | **** 1 pcs 107 Temperature Probe | ||
+ | **** 1 pcs cable protection | ||
+ | *** Subsurface Hardware | ||
+ | **** 9 HydraProbe IIs | ||
+ | **** 3 HFP01 heat flux plates | ||
+ | **** 5 deep thermistor probes | ||
+ | **** 1 shallow thermistor probes | ||
+ | **** 9 thermistors probes to pair with the hydraprobe iis | ||
+ | **** 6 thermal conductivity probes to put two of the pits | ||
===Things to buy=== | ===Things to buy=== | ||
* Bit o' Food? | * Bit o' Food? | ||
* buy additional required hardware | * buy additional required hardware | ||
+ | * 2400 ft of 3/4" flex conduit | ||
+ | * 100 ft of 3/8" flex conduit | ||
* brown tarps | * brown tarps | ||
* solar panel mounts | * solar panel mounts | ||
Line 15: | Line 105: | ||
* large pvc and fittings to go between action packer and CSI enclosure? | * large pvc and fittings to go between action packer and CSI enclosure? | ||
* fittings for an additional opening in bottom of enclosures | * fittings for an additional opening in bottom of enclosures | ||
+ | * cable ties | ||
===Stuff to bring out=== | ===Stuff to bring out=== | ||
==== Extras from Bill ==== | ==== Extras from Bill ==== | ||
* 4 pcs 107 Probes & Radiation Shields | * 4 pcs 107 Probes & Radiation Shields | ||
+ | |||
==== Other ==== | ==== Other ==== | ||
* | * | ||
+ | |||
+ | ==== things not on a PR yet==== | ||
+ | * power cables (reds & blacks or extension cords) | ||
+ | * cable protection for energy system | ||
+ | * brown tarps from Freddies | ||
+ | * NRS straps maybe from the Beave for the tarp. | ||
+ | * Cable Ties | ||
==== Equipment To Ship ==== | ==== Equipment To Ship ==== | ||
Line 36: | Line 135: | ||
* '''Shotgun''' | * '''Shotgun''' | ||
* Keypad | * Keypad | ||
+ | * fish tape | ||
+ | * kayak | ||
* Tool Bags | * Tool Bags | ||
* Computer & (packed) SC32B | * Computer & (packed) SC32B | ||
Line 53: | Line 154: | ||
# Work Actionpacker #1 [Bob #3] | # Work Actionpacker #1 [Bob #3] | ||
# | # | ||
+ | |||
+ | ====How it will go down out there==== | ||
+ | * Bil & Vlad drill the thermistor bore holes | ||
+ | * Bob focuses on the wiring and station set up with an assist as needed from others | ||
+ | * Anna if she comes digs and logs soil pits | ||
+ | * All will share hauling duties from truck to intensive site area |
Revision as of 11:50, 24 August 2012
Contents
Notes
- NGEE Barrow Intensive Sites Initial Wiring
- First Program (not including thermal offsets which will be added onsite):
Metadata type stuff
- NGEE-Barrow Calibration and Serial Numbers
- Timezone - UTC
- PakBus IDs - A = 400; B = 401; C = 402; D = 403
Supplies / Equipment the GIPL is providing to the project that will need to be replaced
- 4 Tripods
- 4 CrossArms
- 4 Radiation Shields
- 4 107 Temperature Probes
- 24 Thermal Conductivity sensors from East30
- 8 Current Excitation Modules
- 8 AM16/32 Multiplexers
- 4 CR1000s
- Instrument box
- charge controller
Supplies / Equipment IARC is providing to the project that will need to be replaced
- Radios?
- set hopping channels to an alternate
- set up in multipoint mode
- Power Cables?
Enroute
- Battery Boxes should arrive 8/30ish
- batteries I'm not sure of but should arrive near our departure.
Program to do yet
- add radio on/off
- seasonal snow measurements
- low battery voltage checks before running thermal conductivity probes
- test final program
- add the thermal conductivity probes
Pre-trip to do
- Cut Pipe
- Ship stuff: thinking two loads
- shipment 1 ship Wednesday and that will be stuff we'll need on arrival
- shipment 2 ship Friday and that will be things still being prepped early next week.
- Organize per site items
- Precip Stand
- 3 screed stakes
- Pipe: 2 pcs 5 ft; 1 pcs 2.5'
- Hose Clamps (2 sizes)
- NuRail fittings (currently in Bob's office)
- Tripod Related
- 1 pcs tripod
- 1 pcs instrument box & contents:
- cable ties
- AM16/32s
- 2 pcs current excitation module
- 1 pcs CR1000
- 1 pcs radio & power cable
- 1 pcs radio antenna setup
- 1 pcs null modem
- Energy system
- 1 pcs solar panel
- 2 pcs ubolts for solar panel mount
- 2 pcs aluminum strips for solar panel mount
- 4 pcs nuts & bolts for solar panel mount
- Batteries if they arrive
- Ring connectors for batteries
- power cable to go between batteries
- power cable to go battery box to instrument box
- cable protection between battery box and instrument box
- power cable to go between solar panel and battery box
- cable protection to go between solar panel and battery box
- cold temperature power cable (red & black or an all-weather extension cord)
- 1 pcs power cable from solar panel
- 1 pcs cable protection for solar panel cable (sort of left off cable protection estimates I'm thinking)
- 1 pcs charge controller
- 1 pcs SR50A setup
- 5' x 3/4" Pipe
- SR50A setup
- 1 pcs SR50A
- 1 pcs SR50A mount
- 1 pcs SR50A cable
- 1 pcs SR50A cable protection
- Air Temperature Setup
- 1 pcs AT radiation shield
- 1 pcs 107 Temperature Probe
- 1 pcs cable protection
- Subsurface Hardware
- 9 HydraProbe IIs
- 3 HFP01 heat flux plates
- 5 deep thermistor probes
- 1 shallow thermistor probes
- 9 thermistors probes to pair with the hydraprobe iis
- 6 thermal conductivity probes to put two of the pits
- Precip Stand
Things to buy
- Bit o' Food?
- buy additional required hardware
- 2400 ft of 3/4" flex conduit
- 100 ft of 3/8" flex conduit
- brown tarps
- solar panel mounts
- wiring stuff (to control all the excess wires) Action Packers?
- conduit, lots!
- large pvc and fittings to go between action packer and CSI enclosure?
- fittings for an additional opening in bottom of enclosures
- cable ties
Stuff to bring out
Extras from Bill
- 4 pcs 107 Probes & Radiation Shields
Other
things not on a PR yet
- power cables (reds & blacks or extension cords)
- cable protection for energy system
- brown tarps from Freddies
- NRS straps maybe from the Beave for the tarp.
- Cable Ties
Equipment To Ship
- 4 Tripods
- 4 Battery Boxes
- 4 Solar Panels
- Thermistor Strings
- Additional Thermistors
- Radiation Shields
- Instrument boxes with loggers etc. installed
- charge controllers
Technical Gear
- Shotgun
- Keypad
- fish tape
- kayak
- Tool Bags
- Computer & (packed) SC32B
- Climbing harness
- Climbing Gear Proper
- Serial Cables & spares
- brown tarps
- Sawzall
- drill
Food to bring out
- Optional
Probable Luggage
- Shotgun [Bob #1]
- Bob Personal backpack [Bob #2]
- Work Actionpacker #1 [Bob #3]
How it will go down out there
- Bil & Vlad drill the thermistor bore holes
- Bob focuses on the wiring and station set up with an assist as needed from others
- Anna if she comes digs and logs soil pits
- All will share hauling duties from truck to intensive site area