Difference between revisions of "NGEE September 3 2012 Trip"
Jump to navigation
Jump to search
Line 7: | Line 7: | ||
* [[NGEE-Barrow Calibration and Serial Numbers]] | * [[NGEE-Barrow Calibration and Serial Numbers]] | ||
* Timezone - UTC | * Timezone - UTC | ||
− | * PakBus IDs - A = 400; B = 401; C = 402; D = 403 | + | * PakBus IDs - A = 400; B = 401; C = 402; D = 403 |
===Supplies / Equipment the GIPL is providing to the project that will need to be replaced=== | ===Supplies / Equipment the GIPL is providing to the project that will need to be replaced=== | ||
Line 18: | Line 18: | ||
* 8 AM16/32 Multiplexers | * 8 AM16/32 Multiplexers | ||
* 4 CR1000s | * 4 CR1000s | ||
− | * Instrument box | + | * 4 Instrument box |
− | * charge controller | + | * 4 charge controller (SS10) |
+ | * 7 SW12V units | ||
+ | * 12 HFP01s | ||
+ | * 12 HydraProbe IIs | ||
=== Supplies / Equipment IARC is providing to the project that will need to be replaced=== | === Supplies / Equipment IARC is providing to the project that will need to be replaced=== | ||
Line 42: | Line 45: | ||
* Cut Pipe | * Cut Pipe | ||
* Ship stuff: thinking two loads | * Ship stuff: thinking two loads | ||
− | ** shipment 1 ship Wednesday and that will be stuff we'll need on arrival | + | ** shipment 1 ship Wednesday and that will be stuff we'll need on arrival |
** shipment 2 ship Friday and that will be things still being prepped early next week. | ** shipment 2 ship Friday and that will be things still being prepped early next week. | ||
* Organize per site items | * Organize per site items | ||
Line 100: | Line 103: | ||
* 2400 ft of 3/4" flex conduit | * 2400 ft of 3/4" flex conduit | ||
* 100 ft of 3/8" flex conduit | * 100 ft of 3/8" flex conduit | ||
− | * brown tarps | + | * brown tarps (Freds) |
− | * solar panel mounts | + | * solar panel mounts (Lowes) |
* wiring stuff (to control all the excess wires) Action Packers? | * wiring stuff (to control all the excess wires) Action Packers? | ||
* conduit, lots! | * conduit, lots! | ||
Line 107: | Line 110: | ||
* fittings for an additional opening in bottom of enclosures | * fittings for an additional opening in bottom of enclosures | ||
* cable ties | * cable ties | ||
+ | * SDI cable extensions | ||
===Stuff to bring out=== | ===Stuff to bring out=== | ||
==== Extras from Bill ==== | ==== Extras from Bill ==== | ||
− | * | + | * Heat shrink |
+ | * Heat Gun | ||
==== Other ==== | ==== Other ==== | ||
− | * | + | * Hole Saw for additional box holes (currently just a single hole) ... purchased and packed. |
+ | |||
==== things not on a PR yet==== | ==== things not on a PR yet==== |
Revision as of 19:13, 28 August 2012
Contents
Notes
- NGEE Barrow Intensive Sites Initial Wiring
- First Program (not including thermal offsets which will be added onsite):
Metadata type stuff
- NGEE-Barrow Calibration and Serial Numbers
- Timezone - UTC
* PakBus IDs - A = 400; B = 401; C = 402; D = 403
Supplies / Equipment the GIPL is providing to the project that will need to be replaced
- 4 Tripods
- 4 CrossArms
- 4 Radiation Shields
- 4 107 Temperature Probes
- 24 Thermal Conductivity sensors from East30
- 8 Current Excitation Modules
- 8 AM16/32 Multiplexers
- 4 CR1000s
- 4 Instrument box
- 4 charge controller (SS10)
- 7 SW12V units
- 12 HFP01s
- 12 HydraProbe IIs
Supplies / Equipment IARC is providing to the project that will need to be replaced
- Radios
- set hopping channels to an alternate: 13
- Network ID is 2279 (BARW on phone)
- set up in multipoint mode
- RF450 S/N 882-5337; 875-2691;875-2750
- FGR S/N 873-7563 (Master); 873-5346
- Need 2 more Null Modems 8/27/2012
Enroute
- Battery Boxes should arrive 8/30ish
- batteries I'm not sure of but should arrive near our departure.
Program to do yet
- seasonal snow measurements... not going to do anything special I think.
- test final program... testing.
Pre-trip to do
- Cut Pipe
- Ship stuff: thinking two loads
- shipment 1 ship Wednesday and that will be stuff we'll need on arrival
- shipment 2 ship Friday and that will be things still being prepped early next week.
- Organize per site items
- Precip Stand
- 3 screed stakes
- Pipe: 2 pcs 5 ft; 1 pcs 2.5'
- Hose Clamps (2 sizes)
- NuRail fittings (currently in Bob's office)
- Tripod Related
- 1 pcs tripod
- 1 pcs instrument box & contents:
- cable ties
- AM16/32s
- 2 pcs current excitation module
- 1 pcs CR1000
- 1 pcs radio & power cable
- 1 pcs radio antenna setup
- 1 pcs null modem
- Energy system
- 1 pcs solar panel
- 2 pcs ubolts for solar panel mount
- 2 pcs aluminum strips for solar panel mount
- 4 pcs nuts & bolts for solar panel mount
- Batteries if they arrive
- Ring connectors for batteries
- power cable to go between batteries
- power cable to go battery box to instrument box
- cable protection between battery box and instrument box
- power cable to go between solar panel and battery box
- cable protection to go between solar panel and battery box
- cold temperature power cable (red & black or an all-weather extension cord)
- 1 pcs power cable from solar panel
- 1 pcs cable protection for solar panel cable (sort of left off cable protection estimates I'm thinking)
- 1 pcs charge controller
- 1 pcs SR50A setup
- 5' x 3/4" Pipe
- SR50A setup
- 1 pcs SR50A
- 1 pcs SR50A mount
- 1 pcs SR50A cable
- 1 pcs SR50A cable protection
- Air Temperature Setup
- 1 pcs AT radiation shield
- 1 pcs 107 Temperature Probe
- 1 pcs cable protection
- Subsurface Hardware
- 9 HydraProbe IIs
- 3 HFP01 heat flux plates
- 5 deep thermistor probes
- 1 shallow thermistor probes
- 9 thermistors probes to pair with the hydraprobe iis
- 6 thermal conductivity probes to put two of the pits
- Precip Stand
Things to buy
- Bit o' Food?
- buy additional required hardware
- 2400 ft of 3/4" flex conduit
- 100 ft of 3/8" flex conduit
- brown tarps (Freds)
- solar panel mounts (Lowes)
- wiring stuff (to control all the excess wires) Action Packers?
- conduit, lots!
- large pvc and fittings to go between action packer and CSI enclosure?
- fittings for an additional opening in bottom of enclosures
- cable ties
- SDI cable extensions
Stuff to bring out
Extras from Bill
- Heat shrink
- Heat Gun
Other
- Hole Saw for additional box holes (currently just a single hole) ... purchased and packed.
things not on a PR yet
- power cables (reds & blacks or extension cords)
- cable protection for energy system
- brown tarps from Freddies
- NRS straps maybe from the Beave for the tarp.
- Cable Ties
- Terminal strips
Equipment To Ship
- 4 Tripods
- 4 Battery Boxes
- 4 Solar Panels
- Thermistor Strings
- Additional Thermistors
- Radiation Shields
- Instrument boxes with loggers etc. installed
- charge controllers
Technical Gear
- Shotgun
- Keypad
- fish tape
- kayak
- Tool Bags
- Computer & (packed) SC32B
- Climbing harness
- Climbing Gear Proper
- Serial Cables & spares
- brown tarps
- Sawzall
- drill
Food to bring out
- Optional
Probable Luggage
- Shotgun [Bob #1]
- Bob Personal backpack [Bob #2]
- Work Actionpacker #1 [Bob #3]
How it will go down out there
- Bil & Vlad drill the thermistor bore holes
- Bob focuses on the wiring and station set up with an assist as needed from others
- Anna if she comes digs and logs soil pits
- All will share hauling duties from truck to intensive site area