* First Program (not including thermal offsets which will be added onsite):  
 
* First Program (not including thermal offsets which will be added onsite):  
 
** https://github.com/frankohanlon/ngee/blob/master/ngee_intensive_site_subset.CR1
 
** https://github.com/frankohanlon/ngee/blob/master/ngee_intensive_site_subset.CR1
 
+
* [[NGEE September 3 2012 Trip not essential to the trip information]]
 
===Metadata type stuff===
 
===Metadata type stuff===
 
* [[NGEE-Barrow Calibration and Serial Numbers]]
 
* [[NGEE-Barrow Calibration and Serial Numbers]]
 +
* Thermistor Probe Calibrations ([https://docs.google.com/open?id=0B0bJdr7FBoY-MG9FTjFCb2w2c28])
 +
* Thermistor Strings and Triple Calibrations ([https://docs.google.com/open?id=0B0bJdr7FBoY-WkVfMDdLX3Zjc2c])
 
* Timezone - UTC
 
* Timezone - UTC
 
  * PakBus IDs - A = 400; B = 401; C = 402; D = 403
 
  * PakBus IDs - A = 400; B = 401; C = 402; D = 403
 +
 
===Shipping===
 
===Shipping===
 
* Tripods, battery boxes etc.  
 
* Tripods, battery boxes etc.  
Line 14: Line 17:
 
** '''NAC Waybill 345-2130-8431'''
 
** '''NAC Waybill 345-2130-8431'''
  
===Supplies / Equipment the GIPL is providing to the project that will need to be replaced===
+
===Bill Remaining things to grab===
* 4 Tripods
+
* 2 pcs Null Modem cables
* 4 CrossArms
+
* Heat shrink
* 4 Radiation Shields
+
* Heat Gun
* 4 107 Temperature Probes
+
* lead weights
* 24 Thermal Conductivity sensors from East30
+
* 2 drill kits
* 8 Current Excitation Modules
+
* 2 drills and batteries and chargers
* 8 AM16/32 Multiplexers
+
* small tarp for soil pits
* 4 CR1000s
+
* frame pack
* 4 Instrument box
 
* 4 charge controller (SS10)
 
* 7 SW12V units
 
* 12 HFP01s
 
* 12 HydraProbe IIs
 
  
=== Supplies / Equipment IARC is providing to the project that will need to be replaced===
+
===Bob Remaining things to grab===
* Radios
+
* 1 pcs SW12V Unit
** set hopping channels to an alternate: 13
+
* 4 pcs nuts & bolts for solar panel mount
** Network ID is 2279 (BARW on phone)
+
* Grabbed, not packed
** set up in multipoint mode
+
** 5 pcs radio & power cable
 +
** 5 pcs radio antenna setup
 +
** 3 pcs null modem
 +
** Ring connectors for batteries
 +
** power cable to go between batteries
 +
** power cable to go battery box to instrument box
 +
** hole drilling stuff for liquid-tite
 +
** Multiplexer wiring wire
 +
** Metal Tags for labeling
  
** RF450 S/N 882-5337; 875-2691;875-2750
+
===To Purchase===
** FGR S/N '''873-7563 (Master)'''; 873-5346
+
* Right size hole saw for the liquid-tite  (for a 1/2" fitting)
** '''Need 2 more Null Modems''' 8/27/2012
 
 
 
===Enroute===
 
* Battery Boxes should arrive 8/30ish
 
* batteries I'm not sure of but should arrive near our departure.
 
 
 
===Program to do yet===
 
* seasonal snow measurements... not going to do anything special I think.
 
* test final program... testing.
 
  
 
===Pre-trip to do===
 
===Pre-trip to do===
* Cut Pipe
+
* Organized per site items ('''X''' means it's packed / shipped)
* Ship stuff: thinking two loads
+
** Precip Stand
** shipment 1 ship Wednesday  and that will be stuff we'll need on arrival
+
*** '''X''' 3 screed stakes
** shipment 2 ship Friday and that will be things still being prepped early next week.
+
*** '''X''' Pipe: 2 pcs 5 ft; 1 pcs 2.5'
* Organize per site items
+
*** '''X''' Hose Clamps (2 sizes)
** Precip Stand
+
*** '''X''' NuRail fittings  
*** 3 screed stakes
 
*** Pipe: 2 pcs 5 ft; 1 pcs 2.5'
 
*** Hose Clamps (2 sizes)
 
*** NuRail fittings (currently in Bob's office)
 
 
** Tripod Related
 
** Tripod Related
*** 1 pcs tripod
+
*** '''X''' 1 pcs tripod & cross arm
*** 1 pcs instrument box & contents:
+
*** '''X''' 1 pcs instrument box & contents:
**** cable ties
+
**** '''X''' cable ties
**** AM16/32s
+
**** '''X''' 2pcs AM16/32s
**** 2 pcs current excitation module
+
**** '''X''' 2 pcs current excitation module
**** 1 pcs CR1000
+
**** '''X''' 1 pcs CR1000
 
**** 1 pcs radio & power cable
 
**** 1 pcs radio & power cable
 
**** 1 pcs radio antenna setup
 
**** 1 pcs radio antenna setup
 
**** 1 pcs null modem
 
**** 1 pcs null modem
 
*** Energy system
 
*** Energy system
**** 1 pcs solar panel
+
**** '''X''' 1 pcs solar panel ''missing one''
**** 2 pcs ubolts for solar panel mount
+
**** '''X''' 2 pcs ubolts for solar panel mount
**** 2 pcs aluminum strips for solar panel mount
+
**** '''X''' 2 pcs aluminum strips for solar panel mount ''shipped in 4' sections in one of the tripod boxes''
**** 4 pcs nuts & bolts for solar panel mount
+
**** 4 pcs nuts & bolts for solar panel mount ''need to grab yet''
**** Batteries if they arrive
+
**** '''X''' Batteries
**** Ring connectors for batteries
+
**** '''X''' Ring connectors for batteries
 
**** power cable to go between batteries
 
**** power cable to go between batteries
**** power cable to go battery box to instrument box
+
**** '''X''' power cable to go battery box to instrument box
**** cable protection between battery box and instrument box
+
**** '''X''' cable protection between battery box and instrument box
**** power cable to go between solar panel and battery box
+
**** '''X''' power cable to go between solar panel and battery box
**** cable protection to go between solar panel and battery box
+
**** '''X''' cable protection to go between solar panel and battery box
**** cold temperature power cable (red & black or an all-weather extension cord)
+
**** '''X''' cold temperature power cable (red & black or an all-weather extension cord)
**** 1 pcs power cable from solar panel
+
**** '''X''' 1 pcs power cable from solar panel
**** 1 pcs cable protection for solar panel cable (sort of left off cable protection estimates I'm thinking)
+
**** '''X''' 1 pcs cable protection for solar panel cable (sort of left off cable protection estimates I'm thinking)
**** 1 pcs charge controller
+
**** '''X''' 1 pcs charge controller
*** 1 pcs SR50A setup
+
*** '''X''' 1 pcs SR50A setup
**** 5' x 3/4" Pipe
 
 
**** SR50A setup
 
**** SR50A setup
**** 1 pcs SR50A
+
**** '''X''' 1 pcs SR50A
**** 1 pcs SR50A mount
+
**** '''X''' 1 pcs SR50A mount (in tripod box)
**** 1 pcs SR50A cable
+
**** '''X''' 1 pcs SR50A cable
**** 1 pcs SR50A cable protection
+
**** '''X''' 1 pcs SR50A cable protection
 
*** Air Temperature Setup
 
*** Air Temperature Setup
**** 1 pcs AT radiation shield
+
**** '''X''' 1 pcs AT radiation shield
**** 1 pcs 107 Temperature Probe
+
**** '''X''' 1 pcs 107 Temperature Probe
**** 1 pcs cable protection
+
**** '''X''' 1 pcs cable protection
 
*** Subsurface Hardware
 
*** Subsurface Hardware
**** 9 HydraProbe IIs
+
**** '''X''' 9 HydraProbe IIs
**** 3 HFP01 heat flux plates
+
**** '''X''' 3 HFP01 heat flux plates
**** 5 deep thermistor probes
+
**** '''X''' 5 deep thermistor probes
**** 1 shallow thermistor probes
+
**** '''X''' 1 shallow thermistor probes
**** 9 thermistors probes to pair with the hydraprobe iis
+
**** '''X''' 9 thermistors probes to pair with the hydraprobe iis
**** 6 thermal conductivity probes to put two of the pits
+
**** '''X''' 6 thermal conductivity probes to put two of the pits
  
 
===Things to buy===
 
===Things to buy===
 
* Bit o' Food?
 
* Bit o' Food?
 
* buy additional required hardware
 
* buy additional required hardware
* 2400 ft of 3/4" flex conduit
 
* 100 ft of 3/8" flex conduit
 
* brown tarps (Freds)
 
* solar panel mounts (Lowes)
 
 
* wiring stuff (to control all the excess wires) Action Packers?
 
* wiring stuff (to control all the excess wires) Action Packers?
* conduit, lots!
 
* large pvc and fittings to go between action packer and CSI enclosure?
 
* fittings for an additional opening in bottom of enclosures
 
* cable ties
 
* SDI cable extensions
 
  
===Stuff to bring out===
+
===Stuff to bring===
==== Extras from Bill ====
 
* Heat shrink
 
* Heat Gun
 
  
  
==== Other ====
+
==== things not on a PR yet====
* Hole Saw for additional box holes (currently just a single hole) ... purchased and packed.
 
  
  
==== things not on a PR yet====
 
* power cables (reds & blacks or extension cords)
 
* cable protection for energy system
 
* brown tarps from Freddies
 
* NRS straps maybe from the Beave for the tarp.
 
* Cable Ties
 
* Terminal strips
 
 
==== Equipment To Ship ====
 
* 4 Tripods
 
* 4 Battery Boxes
 
* 4 Solar Panels
 
* Thermistor Strings
 
* Additional Thermistors
 
* Radiation Shields
 
* Instrument boxes with loggers etc. installed
 
* charge controllers
 
  
 
==== Technical Gear ====
 
==== Technical Gear ====
Line 156: Line 118:
 
* Serial Cables & spares
 
* Serial Cables & spares
 
* brown tarps
 
* brown tarps
* Sawzall
+
* '''X''' Sawzall
 
* drill
 
* drill
  
Line 171: Line 133:
 
* Bil & Vlad drill the thermistor bore holes
 
* Bil & Vlad drill the thermistor bore holes
 
* Bob focuses on the wiring and station set up with an assist as needed from others
 
* Bob focuses on the wiring and station set up with an assist as needed from others
* Anna if she comes digs and logs soil pits
 
 
* All will share hauling duties from truck to intensive site area
 
* All will share hauling duties from truck to intensive site area

Latest revision as of 11:49, 1 September 2012

Notes

Metadata type stuff

* PakBus IDs - A = 400; B = 401; C = 402; D = 403

Shipping

  • Tripods, battery boxes etc.
    • NAC Waybill 345-2130-8372
  • Batteries
    • NAC Waybill 345-2130-8431

Bill Remaining things to grab

  • 2 pcs Null Modem cables
  • Heat shrink
  • Heat Gun
  • lead weights
  • 2 drill kits
  • 2 drills and batteries and chargers
  • small tarp for soil pits
  • frame pack

Bob Remaining things to grab

  • 1 pcs SW12V Unit
  • 4 pcs nuts & bolts for solar panel mount
  • Grabbed, not packed
    • 5 pcs radio & power cable
    • 5 pcs radio antenna setup
    • 3 pcs null modem
    • Ring connectors for batteries
    • power cable to go between batteries
    • power cable to go battery box to instrument box
    • hole drilling stuff for liquid-tite
    • Multiplexer wiring wire
    • Metal Tags for labeling

To Purchase

  • Right size hole saw for the liquid-tite (for a 1/2" fitting)

Pre-trip to do

  • Organized per site items (X means it's packed / shipped)
    • Precip Stand
      • X 3 screed stakes
      • X Pipe: 2 pcs 5 ft; 1 pcs 2.5'
      • X Hose Clamps (2 sizes)
      • X NuRail fittings
    • Tripod Related
      • X 1 pcs tripod & cross arm
      • X 1 pcs instrument box & contents:
        • X cable ties
        • X 2pcs AM16/32s
        • X 2 pcs current excitation module
        • X 1 pcs CR1000
        • 1 pcs radio & power cable
        • 1 pcs radio antenna setup
        • 1 pcs null modem
      • Energy system
        • X 1 pcs solar panel missing one
        • X 2 pcs ubolts for solar panel mount
        • X 2 pcs aluminum strips for solar panel mount shipped in 4' sections in one of the tripod boxes
        • 4 pcs nuts & bolts for solar panel mount need to grab yet
        • X Batteries
        • X Ring connectors for batteries
        • power cable to go between batteries
        • X power cable to go battery box to instrument box
        • X cable protection between battery box and instrument box
        • X power cable to go between solar panel and battery box
        • X cable protection to go between solar panel and battery box
        • X cold temperature power cable (red & black or an all-weather extension cord)
        • X 1 pcs power cable from solar panel
        • X 1 pcs cable protection for solar panel cable (sort of left off cable protection estimates I'm thinking)
        • X 1 pcs charge controller
      • X 1 pcs SR50A setup
        • SR50A setup
        • X 1 pcs SR50A
        • X 1 pcs SR50A mount (in tripod box)
        • X 1 pcs SR50A cable
        • X 1 pcs SR50A cable protection
      • Air Temperature Setup
        • X 1 pcs AT radiation shield
        • X 1 pcs 107 Temperature Probe
        • X 1 pcs cable protection
      • Subsurface Hardware
        • X 9 HydraProbe IIs
        • X 3 HFP01 heat flux plates
        • X 5 deep thermistor probes
        • X 1 shallow thermistor probes
        • X 9 thermistors probes to pair with the hydraprobe iis
        • X 6 thermal conductivity probes to put two of the pits

Things to buy

  • Bit o' Food?
  • buy additional required hardware
  • wiring stuff (to control all the excess wires) Action Packers?

Stuff to bring

things not on a PR yet

Technical Gear

  • Shotgun
  • Keypad
  • fish tape
  • kayak
  • Tool Bags
  • Computer & (packed) SC32B
  • Climbing harness
  • Climbing Gear Proper
  • Serial Cables & spares
  • brown tarps
  • X Sawzall
  • drill

Food to bring out

  • Optional

Probable Luggage

  1. Shotgun [Bob #1]
  2. Bob Personal backpack [Bob #2]
  3. Work Actionpacker #1 [Bob #3]

How it will go down out there

  • Bil & Vlad drill the thermistor bore holes
  • Bob focuses on the wiring and station set up with an assist as needed from others
  • All will share hauling duties from truck to intensive site area