Difference between revisions of "NGEE Barrow 2013 Boring Trip"

From IARC 207 Wiki
Jump to navigation Jump to search
 
(4 intermediate revisions by 2 users not shown)
Line 3: Line 3:
 
Stuff to do prior to:
 
Stuff to do prior to:
 
* XX Understand how to do the stakeout method of RTK survey
 
* XX Understand how to do the stakeout method of RTK survey
* Can our R8s rx at 418mhz? ... yes.  Need to get that setup.
+
* Can our R8s rx at 418mhz? ... no.  Need to get that setup / just check up there for it.
 
* setup loggernet.iarc.uaf.edu and transfer the barrow dreamplug data there?
 
* setup loggernet.iarc.uaf.edu and transfer the barrow dreamplug data there?
 
* check installed programs on barrow dreamplug
 
* check installed programs on barrow dreamplug
 +
sudo dpkg --get-selections | grep -v deinstall > installed_packages-2012_07.txt
 
* XX load coring holes onto GPS
 
* XX load coring holes onto GPS
 
* scan fieldbook
 
* scan fieldbook
 +
* Print this page and workplan from Dave
  
Stuff that is at work:
+
 
* chargers for Trimble stuff
+
Barrow Tasks:
** R8 batteries
+
* XX Download Grid Soil Moisture Data
** TSC3 charger
+
* Change power supply for dreamplug
* Hardhats
+
* XX check out C site SR50A cables to see if they can be repaired etc.
* eye protection
+
** Two problems.  1) cable failure on SR50A 3 (ID 2) 2) variable out of range errors being produced by the program that aren't showing up in the compile on the computer.
* ear protection
+
* XX Check on Grid Battery
* SC32B
 
* Camera tripod
 
* blackberry
 
* Trimble Serial Cable to Lemo
 
* ???
 
  
 
Stuff to bring:
 
Stuff to bring:
* small toolbag
+
* XX small toolbag
* Shotgun
+
* XX Shotgun
* GPS setup
+
* XX GPS setup
* Toughbook
+
* XX Toughbook & charger
* SC32B
+
* XX Trimble Chargers (2)
* Serial Cables
+
* XX SC32B
* Toolbags
+
* XX Serial Cables
* replacement power supply for barrow dreamplug
 
* new butane soldering iron in waterproof case
 
* solder?
 
* PPE:
 
*** Helmets
 
*** Hearing Protection
 
*** Safety Glasses
 
  
Barrow Tasks:
+
* XX new butane soldering iron in waterproof case
* Download Grid Soil Moisture Data
+
* XX solder?
* Change power supply for dreamplug
+
* XX PPE:
* check out C site SR50A cables to see if they can be repaired etc.
+
** XX Helmets
* Check on Grid Battery
+
** XX Hearing Protection
 +
** XX Safety Glasses

Latest revision as of 11:51, 19 April 2013

...coring is more accurate than boring... not sure how that slipped through...

Stuff to do prior to:

  • XX Understand how to do the stakeout method of RTK survey
  • Can our R8s rx at 418mhz? ... no. Need to get that setup / just check up there for it.
  • setup loggernet.iarc.uaf.edu and transfer the barrow dreamplug data there?
  • check installed programs on barrow dreamplug
sudo dpkg --get-selections | grep -v deinstall > installed_packages-2012_07.txt
  • XX load coring holes onto GPS
  • scan fieldbook
  • Print this page and workplan from Dave


Barrow Tasks:

  • XX Download Grid Soil Moisture Data
  • Change power supply for dreamplug
  • XX check out C site SR50A cables to see if they can be repaired etc.
    • Two problems. 1) cable failure on SR50A 3 (ID 2) 2) variable out of range errors being produced by the program that aren't showing up in the compile on the computer.
  • XX Check on Grid Battery

Stuff to bring:

  • XX small toolbag
  • XX Shotgun
  • XX GPS setup
  • XX Toughbook & charger
  • XX Trimble Chargers (2)
  • XX SC32B
  • XX Serial Cables
  • XX new butane soldering iron in waterproof case
  • XX solder?
  • XX PPE:
    • XX Helmets
    • XX Hearing Protection
    • XX Safety Glasses