| Line 6: | Line 6: | ||
** MetOne 5x  | ** MetOne 5x  | ||
** Barometric Pressure  | ** Barometric Pressure  | ||
| − | ** Leg Mount Instrument Boxes 3x  | + | ** Leg Mount Instrument Boxes 3x (Is this still required?)  | 
*** Install AM16/32B if time  | *** Install AM16/32B if time  | ||
*** Install SDM Switch if time  | *** Install SDM Switch if time  | ||
| Line 18: | Line 18: | ||
===To Add to each site===  | ===To Add to each site===  | ||
* 2 HMP155s w/ Radiation Shields  | * 2 HMP155s w/ Radiation Shields  | ||
| − | * 2 Met One WS   | + | * 2 Met One WS  | 
* 1 Tipping Bucket w/ Windscreen  | * 1 Tipping Bucket w/ Windscreen  | ||
* 1 CNR4 Net Radiometer with Heater/Fan Control  | * 1 CNR4 Net Radiometer with Heater/Fan Control  | ||
| − | |||
| − | |||
* 1 AM16/32  | * 1 AM16/32  | ||
| − | |||
===Additionally, to add to Site A===  | ===Additionally, to add to Site A===  | ||
* CS106 Barometric Pressure  | * CS106 Barometric Pressure  | ||
| − | |||
| − | ===To Do as of 4/  | + | ===Rewiring at each site===  | 
| + | * Move AM16/32B #1 & #2 RES to CR1000 C1  | ||
| + | * Move SR50A Green Wire to CR1000 C5  | ||
| + | |||
| + | ===To Do as of 4/21/2013===  | ||
* Modify Programs  | * Modify Programs  | ||
| − | |||
* Wiring Diagrams  | * Wiring Diagrams  | ||
* PRs for freight  | * PRs for freight  | ||
* Sketch up site  | * Sketch up site  | ||
* Wire up boxes as much as possible (is anything possible?  Maybe just mount the peripherals)  | * Wire up boxes as much as possible (is anything possible?  Maybe just mount the peripherals)  | ||
| + | * Review pictures to see if a second box is still needed for just the multiplexer.  | ||
* holes in box for instrumentation maybe?  | * holes in box for instrumentation maybe?  | ||
* cut crossarms to length  | * cut crossarms to length  | ||
| + | * Change SDI-12 IDs for SR50As  | ||
| + | * Review Site C data... Look closely at SR50A data for precise failure dates.  | ||
| + | * SM Grid rewiring?  | ||
| + | |||
=== Remaining things to grab===  | === Remaining things to grab===  | ||
| Line 83: | Line 87: | ||
* Computer & (packed) SC32B    | * Computer & (packed) SC32B    | ||
* Climbing harness  | * Climbing harness  | ||
| − | |||
* Serial Cables & spares  | * Serial Cables & spares  | ||
* Sawzall  | * Sawzall  | ||
Revision as of 22:01, 21 April 2013
Contents
Shipping
- New Instrumentation once it arrives:
- Precip Buckets 3x
 - Wind Screen 3x
 - HMP155s 6x
 - MetOne 5x
 - Barometric Pressure
 - Leg Mount Instrument Boxes 3x (Is this still required?)
- Install AM16/32B if time
 - Install SDM Switch if time
 
 - Radiation Shields
 - Cross Arms
- 1.5" Sched 40 Aluminum = Net Radiometer 3x
 - 1" Sched 40 Aluminum = Upper WS & AT/RH 3x
 
 - Tripod Mast
- 1.5" Sched 40 Galvanized Pipe
 
 
 
To Add to each site
- 2 HMP155s w/ Radiation Shields
 - 2 Met One WS
 - 1 Tipping Bucket w/ Windscreen
 - 1 CNR4 Net Radiometer with Heater/Fan Control
 - 1 AM16/32
 
Additionally, to add to Site A
- CS106 Barometric Pressure
 
Rewiring at each site
- Move AM16/32B #1 & #2 RES to CR1000 C1
 - Move SR50A Green Wire to CR1000 C5
 
To Do as of 4/21/2013
- Modify Programs
 - Wiring Diagrams
 - PRs for freight
 - Sketch up site
 - Wire up boxes as much as possible (is anything possible? Maybe just mount the peripherals)
 - Review pictures to see if a second box is still needed for just the multiplexer.
 - holes in box for instrumentation maybe?
 - cut crossarms to length
 - Change SDI-12 IDs for SR50As
 - Review Site C data... Look closely at SR50A data for precise failure dates.
 - SM Grid rewiring?
 
Remaining things to grab
- ?
 
To Purchase
- ?
 
Pre-trip to do
- Organized per site items (X means it's packed / shipped)
- Precip Stand  (3 sets)
- 4 NuRail 3/4 offset cross pieces
 - 1 Novalynx Wind Screen
 - 1 TE525m & Cable
 
 
 - Precip Stand  (3 sets)
 
- Tripod Related
 - 
 
- Tripod Related
 
Things to buy
- Bit o' Food?
 - ?
 
Stuff to bring
things not on a PR yet
Technical Gear
- Shotgun
 - Keypads
 - fish tape
 - Tool Bags
 - Computer & (packed) SC32B
 - Climbing harness
 - Serial Cables & spares
 - Sawzall
 - drill
 
Food to bring out
- Optional
 
Probable Luggage
- Shotgun [Bob #1]
 - Bob Personal backpack [Bob #2]
 - Work Actionpacker #1 [Bob #3]
 
Rough on-site todo
- Remove box & solar panel
 - Measure from top of tripod base to cross arm... note in fieldbook
 - Remove crossarm off tripod
 - unscrew center pole
 - put 1.5" offset nurail fitting on new center pole
 - attach new center pole
 - put cross arm, instrument box, and solar panel back on the tower.
 - Install new instrument box on lower leg.
 - Mount all new sensors
- Net Radiometer @ 1-1.5m
 - WS on radiometer crossarm
 - HMP155 on radiometer crossarm
 - Second HMP155 & WS high up on tower, maybe as high as they'll reach.
 - Armor all the cabling
 - Armor and install the precip bucket.
 - Install the precip wind screen
 
 - send new program to data logger