| + | ==May 2013 Trip==  | ||
| + | Purpose:   | ||
| + | * Fix Grid Site station   | ||
| + | * Snow Surveys  | ||
| + | * Any other prep that's possible  | ||
| + | |||
===Shipping===  | ===Shipping===  | ||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
===To Do as of 4/21/2013===  | ===To Do as of 4/21/2013===  | ||
| Line 39: | Line 12: | ||
* PRs for freight  | * PRs for freight  | ||
* Sketch up site  | * Sketch up site  | ||
| − | |||
| − | |||
| − | |||
* cut crossarms to length  | * cut crossarms to length  | ||
* Change SDI-12 IDs for SR50As  | * Change SDI-12 IDs for SR50As  | ||
| Line 55: | Line 25: | ||
===Pre-trip to do===  | ===Pre-trip to do===  | ||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| Line 78: | Line 32: | ||
===Stuff to bring===  | ===Stuff to bring===  | ||
| − | + | * Adirondack Tube  | |
| + | * Scale  | ||
| + | * Thaw Probe  | ||
| + | * Ziplocs  | ||
| + | * GPS  | ||
| + | * If NuRail fittings ever arrive then we can change out the tripod poles (or start) this trip.  | ||
==== things not on a PR yet====  | ==== things not on a PR yet====  | ||
| Line 105: | Line 64: | ||
====Rough on-site todo====  | ====Rough on-site todo====  | ||
| − | #   | + | # Copy wiring of Grid Site  | 
| − | #   | + | # Transfer wires to new multiplexer & Logger  | 
| − | + | # Snowsurveys  | |
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | #  | ||
| − | |||
| − | |||
| − | |||
Revision as of 15:25, 28 April 2013
Contents
May 2013 Trip
Purpose:
- Fix Grid Site station
 - Snow Surveys
 - Any other prep that's possible
 
Shipping
To Do as of 4/21/2013
- Modify Programs
 - Wiring Diagrams
 - PRs for freight
 - Sketch up site
 - cut crossarms to length
 - Change SDI-12 IDs for SR50As
 - Review Site C data... Look closely at SR50A data for precise failure dates.
 - SM Grid rewiring?
 
Remaining things to grab
- ?
 
To Purchase
- ?
 
Pre-trip to do
Things to buy
- Bit o' Food?
 - ?
 
Stuff to bring
- Adirondack Tube
 - Scale
 - Thaw Probe
 - Ziplocs
 - GPS
 - If NuRail fittings ever arrive then we can change out the tripod poles (or start) this trip.
 
things not on a PR yet
Technical Gear
- Shotgun
 - Keypads
 - fish tape
 - Tool Bags
 - Computer & (packed) SC32B
 - Climbing harness
 - Serial Cables & spares
 - Sawzall
 - drill
 
Food to bring out
- Optional
 
Probable Luggage
- Shotgun [Bob #1]
 - Bob Personal backpack [Bob #2]
 - Work Actionpacker #1 [Bob #3]
 
Rough on-site todo
- Copy wiring of Grid Site
 - Transfer wires to new multiplexer & Logger
 - Snowsurveys