Difference between revisions of "NGEE Barrow 2013 Site Install Trip"
Jump to navigation
Jump to search
Line 4: | Line 4: | ||
* Snow Surveys | * Snow Surveys | ||
* Any other prep that's possible | * Any other prep that's possible | ||
+ | |||
===Shipping=== | ===Shipping=== | ||
Line 15: | Line 16: | ||
* Change SDI-12 IDs for SR50As | * Change SDI-12 IDs for SR50As | ||
* Review Site C data... Look closely at SR50A data for precise failure dates. | * Review Site C data... Look closely at SR50A data for precise failure dates. | ||
+ | ** Reinforce grounding | ||
* SM Grid rewiring? | * SM Grid rewiring? | ||
Revision as of 15:37, 29 April 2013
Contents
May 2013 Trip
Purpose:
- Fix Grid Site station
- Snow Surveys
- Any other prep that's possible
Shipping
To Do as of 4/21/2013
- Modify Programs
- Wiring Diagrams
- PRs for freight
- Sketch up site
- cut crossarms to length
- Change SDI-12 IDs for SR50As
- Review Site C data... Look closely at SR50A data for precise failure dates.
- Reinforce grounding
- SM Grid rewiring?
Remaining things to grab
- ?
To Purchase
- ?
Pre-trip to do
Things to buy
- Bit o' Food?
- ?
Stuff to bring
- Adirondack Tube
- Scale
- Thaw Probe
- Ziplocs
- GPS
- If NuRail fittings ever arrive then we can change out the tripod poles (or start) this trip.
things not on a PR yet
Technical Gear
- Shotgun
- Keypads
- fish tape
- Tool Bags
- Computer & (packed) SC32B
- Climbing harness
- Serial Cables & spares
- Sawzall
- drill
Food to bring out
- Optional
Probable Luggage
- Shotgun [Bob #1]
- Bob Personal backpack [Bob #2]
- Work Actionpacker #1 [Bob #3]
Rough on-site todo
- Copy wiring of Grid Site
- Transfer wires to new multiplexer & Logger
- Snowsurveys