==May 2013 Trip==  | ==May 2013 Trip==  | ||
Purpose:    | Purpose:    | ||
| − | *   | + | * Rewire Grid Site station with CR1000 & new multiplexers  | 
| + | * Setup MD485s to get Grid online  | ||
| + | * reconfigure Site C CR1000 for act as a pakbus router  | ||
* Snow Surveys  | * Snow Surveys  | ||
| − | * Any other prep that's possible  | + | * Any other prep that's possible for the June trip  | 
| − | + | * Bring back shotgun  | |
| + | * slather anticorrosion goo on all 12V/G points?  | ||
===Shipping===  | ===Shipping===  | ||
| + | * None  | ||
===To Do as of 4/21/2013===  | ===To Do as of 4/21/2013===  | ||
| Line 15: | Line 19: | ||
* cut crossarms to length  | * cut crossarms to length  | ||
* Change SDI-12 IDs for SR50As  | * Change SDI-12 IDs for SR50As  | ||
| − | + | ||
** Reinforce grounding  | ** Reinforce grounding  | ||
* SM Grid rewiring?  | * SM Grid rewiring?  | ||
| − | + | *  | |
=== Remaining things to grab===  | === Remaining things to grab===  | ||
| Line 39: | Line 43: | ||
* Ziplocs  | * Ziplocs  | ||
* GPS  | * GPS  | ||
| − | |||
| − | |||
| − | |||
| − | |||
==== Technical Gear ====  | ==== Technical Gear ====  | ||
| − | * '''Shotgun'''  | + | * '''Shotgun''' -- in Barrow already  | 
* Keypads  | * Keypads  | ||
* '''fish tape'''  | * '''fish tape'''  | ||
| Line 60: | Line 60: | ||
==== Probable Luggage ====  | ==== Probable Luggage ====  | ||
| − | + | # Bob Personal Actionpacker [Bob #1]  | |
| − | # Bob Personal   | + | # Work Actionpacker #1 [Bob #2]  | 
| − | # Work Actionpacker #1 [Bob #  | + | |
| − | |||
====Rough on-site todo====  | ====Rough on-site todo====  | ||
Revision as of 12:31, 4 May 2013
Contents
May 2013 Trip
Purpose:
- Rewire Grid Site station with CR1000 & new multiplexers
 - Setup MD485s to get Grid online
 - reconfigure Site C CR1000 for act as a pakbus router
 - Snow Surveys
 - Any other prep that's possible for the June trip
 - Bring back shotgun
 - slather anticorrosion goo on all 12V/G points?
 
Shipping
- None
 
To Do as of 4/21/2013
- Modify Programs
 - Wiring Diagrams
 - PRs for freight
 - Sketch up site
 - cut crossarms to length
 - Change SDI-12 IDs for SR50As
 
- Reinforce grounding
 
- SM Grid rewiring?
 
Remaining things to grab
- ?
 
To Purchase
- ?
 
Pre-trip to do
Things to buy
- Bit o' Food?
 - ?
 
Stuff to bring
- Adirondack Tube
 - Scale
 - Thaw Probe
 - Ziplocs
 - GPS
 
Technical Gear
- Shotgun -- in Barrow already
 - Keypads
 - fish tape
 - Tool Bags
 - Computer & (packed) SC32B
 - Climbing harness
 - Serial Cables & spares
 - Sawzall
 - drill
 
Food to bring out
- Optional
 
Probable Luggage
- Bob Personal Actionpacker [Bob #1]
 - Work Actionpacker #1 [Bob #2]
 
Rough on-site todo
- Copy wiring of Grid Site
 - Transfer wires to new multiplexer & Logger
 - Snowsurveys