Difference between revisions of "NGEE Barrow 2013 Site Install Trip"
Jump to navigation
Jump to search
Line 22: | Line 22: | ||
* In Barrow: | * In Barrow: | ||
** Butane | ** Butane | ||
+ | ** Battery Cleaner | ||
* Food? | * Food? | ||
Revision as of 17:12, 6 May 2013
Contents
May 2013 Trip
Purpose:
- Rewire Grid Site station with CR1000 & new multiplexers
- PakBus ID = 404
- Setup MD485s to get Grid online
- reconfigure Site C CR1000 for act as a pakbus router
- Change IsRouter to YES -> Available in advanced settings
- Change beacon interval on SDC7 to 60
- Snow Surveys
- Any other prep that's possible for the June trip
- Bring back shotgun
- slather anticorrosion goo on all 12V/G points?
- Record Thermal Conductivity Heater Resistance using a high-accuracy ohmmeter
- Swap out SR50A
Shipping
- None
To Purchase
- Anti-Corrosion Goo
- Ziplocs
- In Barrow:
- Butane
- Battery Cleaner
- Food?
Pre-trip to do
- Read up on CR1000 Pakbus Routing
- Pack
Stuff to bring
- Adirondack Tube
- Scale
- Thaw Probe
- Ziplocs
- GPS
- 4 Precision Resistors for new logger
- High Precision Voltmeter
- Duct Seal
- 80' of cable
Technical Gear
- Shotgun -- in Barrow already
- Keypads
- fish tape
- Tool Bags
- Computer & (packed) SC32B
- Climbing harness
- Serial Cables & spares
- Sawzall
- drill
Food to bring out
- Optional
Probable Luggage
- Bob Personal Actionpacker [Bob #1]
- Work Actionpacker #1 [Bob #2]
Rough on-site todo
- Copy wiring of Grid Site
- Transfer wires to new multiplexer & Logger
- Snowsurveys
- Measure Heater Resistances for all thermal conductivity probes
- Look to see if the C site pit 2 thermal conductivity sensors could be connected to a lower instrument enclosure.
- configure C as pakbus router for grid
- armor and run rs485 line between C and grid