Difference between revisions of "Umiat Crew Trip To Do 2013"
Jump to navigation
Jump to search
Line 52: | Line 52: | ||
** Plugged in null modem to logger and unplugged power to logger for winter. | ** Plugged in null modem to logger and unplugged power to logger for winter. | ||
** Bad radio or bad connection. | ** Bad radio or bad connection. | ||
+ | * Snow Survey | ||
====DUS3 Chandler Bluff Met==== | ====DUS3 Chandler Bluff Met==== | ||
Line 61: | Line 62: | ||
====Chandler Crossing==== | ====Chandler Crossing==== | ||
* Install Plant Cam | * Install Plant Cam | ||
+ | |||
+ | ====Chandler Gaging Site==== | ||
+ | * Install Hobo for backup | ||
+ | * Install PTs | ||
+ | ** Record S/N | ||
+ | ** SDI Address | ||
+ | ** PSI Rating | ||
+ | * Survey in Benchmarks & TBMs | ||
+ | * Snow Survey | ||
====DUS2 Anaktuvuk River==== | ====DUS2 Anaktuvuk River==== | ||
Line 66: | Line 76: | ||
* Needs new Gieck Base and alter shield | * Needs new Gieck Base and alter shield | ||
* Fix Cameras | * Fix Cameras | ||
+ | ** Bring Extra Cable & Camera to the site | ||
+ | ** Mount GoPro to Tent frame | ||
+ | ** | ||
+ | * Snow Survey | ||
===Needed from Toolik=== | ===Needed from Toolik=== |
Revision as of 10:52, 23 May 2013
Contents
Met Sites and Repeaters
DUR6 Itmalakpak
- Shovel out solar panel.
- Replace barometric pressure if time permits.
- Need a new e-fence charger.
- The lower line is not working but the top line is working.
DUM3 Nanushuk
- Stakes needed to pin down efence charger
DUM4 Tuluga Met
- Potential bear damage at station.
- Have not heard from station since late September.
- Need an E-Fence; Also new stand?:
- is sitting on the ground surface next to the southwestern fencepost - to the south of the raingauge, the mount is broken and the solar panel/battery is not working
- New Gieck Base & Alter Shield
- Level Precip Bucket
DUM5 Encampment Met
- Bear Fence Needs Repair
DUM6 White Lake Met
- Tighten wiring on Air temp backup (GWS style)
DUM7 Hat Box Mesa
- Put Conduit over Soil thermistor cable
DFM2 White Hills Met
- Needs major sensor repairs. Most of the sensors are bad.
- Would be good to get rainfall and air temperature but I propose probably not fixing the following broken sensors:
- needs a new anemometer (bad bearings),
- has a bad SR50 snow depth sensor old style
- Needs an HMP Air temp sensor or a new backup sensor
DFM4 Northwest Kuparuk Met
- Check radiation shields, are sensors in the shield?
- Replace SR50 old style.
- Fence was in very poor shape on last trip to station.
Surface Water Stations
Lower Itkillik Station
- Plant Cam
- From Toolik?
- Needs freewave radio
- Needs new program loaded into logger for water levels, turbidity, should be identical to Upper Itkillik except for no cameras.
- Station has:
- HMP,
- 10KOhm resistor
- Battery box thermistor.
- Rig job radio set up: Left pins 2, 3, 5 plugged into Ken's serial connector deal and unplugged 1, 4, 6. Taped back up.
- Plugged in null modem to logger and unplugged power to logger for winter.
- Bad radio or bad connection.
- Snow Survey
DUS3 Chandler Bluff Met
- Leaning tower due to erosion problems.
- Measure the leaning SR50 snow depth sensor distance to snow surface and snow depth so we can possibly correct the bad data due to the leaning tower.
- Move mast onto new tripod base and patch up station best you can.
- Remeasure SR50 distances, etc.
Chandler Crossing
- Install Plant Cam
Chandler Gaging Site
- Install Hobo for backup
- Install PTs
- Record S/N
- SDI Address
- PSI Rating
- Survey in Benchmarks & TBMs
- Snow Survey
DUS2 Anaktuvuk River
- Needs new soil thermistor string
- Needs new Gieck Base and alter shield
- Fix Cameras
- Bring Extra Cable & Camera to the site
- Mount GoPro to Tent frame
- Snow Survey
Needed from Toolik
- Stakes for DUM efence charger
- CC640 Power Plugs (6 conductor deals)
- Some Conduit
Needed from Umiat
- BLM flight schedule
- Return Plant Cams to Fairbanks (2 units)