Line 8: | Line 8: | ||
* pull a | * pull a | ||
− | Site D Install | + | Site D Install Instrumentation List: |
+ | * 5 Temperature Probes (1.5m depth) | ||
+ | * Possibly one soil pit (soil & water conditions depending) | ||
+ | * Air Temperature / Relative Humidity @ 1.5 meters | ||
+ | * Snow Depth @ 1.5 meters | ||
+ | * Net Radiation @ 1.3 meters | ||
+ | Additional Site Work: | ||
+ | * Level Radiometers at the other sites | ||
+ | * Change out the SR50A snow transducers for the existing stations (7pcs) | ||
+ | * Change out the pipe for the snow stands (4 pcs) | ||
+ | * Cable Extensions for Thermal Conductivity sensors @ C site | ||
+ | * small enclosure & extra logger/MD485 for C site bonus thermal conductivity sensors | ||
+ | * sledge tower feet | ||
+ | |||
+ | Additional Soil Work: | ||
+ | * At least 2 soil pits (soil to fill two coolers) | ||
+ | |||
+ | To Purchase: | ||
+ | * Terminal male adapter for PVC down pipe | ||
+ | * Terminal lockring | ||
+ | * Pipe for snow sensor stands | ||
+ | * Pipe for D tripod | ||
+ | * solar panel & mounting system | ||
+ | ** flat stock | ||
+ | ** ubolts | ||
+ | * bolts for Net Radiometer NuRail fitting | ||
+ | * vertical pipe for Net Radiometer | ||
+ | * Gauntlet Gloves | ||
+ | |||
+ | Odd Tools: | ||
+ | * Laptop | ||
+ | ** serial cable | ||
+ | ** laptop weather resistant housing | ||
+ | * tool bags | ||
+ | * pipe wrench | ||
+ | * drill for precip bucket screws | ||
+ | * an additional wheelbarrow? | ||
+ | * 2 coolers | ||
+ | * GPS system | ||
+ | |||
+ | Finalize Program Wiring (thermistor vs. thermocouple for the thermal conductivity probes) | ||
Itinerary: | Itinerary: | ||
− | 8/19 Bill, Vlad, Bob Busey & | + | 8/19 Bill, Vlad, Bob Busey & Bob Bolton fly out |
− | |||
* Pick up gear and get ready to haul it out: | * Pick up gear and get ready to haul it out: | ||
** tower | ** tower | ||
Line 22: | Line 61: | ||
* haul stuff out by wheel barrow | * haul stuff out by wheel barrow | ||
* instrumentation | * instrumentation | ||
+ | * shovel | ||
+ | * coolers (2-3) | ||
+ | * | ||
** 2 | ** 2 | ||
* | * | ||
+ | * Program | ||
+ | |||
+ | Tasks: | ||
+ | * Put up tripod | ||
+ | ** grab 4 pieces of trail mat from the NGEE conex | ||
+ | ** set up tripod with | ||
Additional Maintenance: | Additional Maintenance: |
Revision as of 17:33, 6 August 2013
Goals:
- Install Barrow Site D Inventory
- Soil Cores
Soil Core component: 8 Bob, Bob, & Sammy
- Use RTK GPS and transect across a polygon in the area south
- pull a
Site D Install Instrumentation List:
- 5 Temperature Probes (1.5m depth)
- Possibly one soil pit (soil & water conditions depending)
- Air Temperature / Relative Humidity @ 1.5 meters
- Snow Depth @ 1.5 meters
- Net Radiation @ 1.3 meters
Additional Site Work:
- Level Radiometers at the other sites
- Change out the SR50A snow transducers for the existing stations (7pcs)
- Change out the pipe for the snow stands (4 pcs)
- Cable Extensions for Thermal Conductivity sensors @ C site
- small enclosure & extra logger/MD485 for C site bonus thermal conductivity sensors
- sledge tower feet
Additional Soil Work:
- At least 2 soil pits (soil to fill two coolers)
To Purchase:
- Terminal male adapter for PVC down pipe
- Terminal lockring
- Pipe for snow sensor stands
- Pipe for D tripod
- solar panel & mounting system
- flat stock
- ubolts
- bolts for Net Radiometer NuRail fitting
- vertical pipe for Net Radiometer
- Gauntlet Gloves
Odd Tools:
- Laptop
- serial cable
- laptop weather resistant housing
- tool bags
- pipe wrench
- drill for precip bucket screws
- an additional wheelbarrow?
- 2 coolers
- GPS system
Finalize Program Wiring (thermistor vs. thermocouple for the thermal conductivity probes)
Itinerary: 8/19 Bill, Vlad, Bob Busey & Bob Bolton fly out
- Pick up gear and get ready to haul it out:
- tower
- batteries
- battery box
- solar panel
- sledge tower feet
- haul stuff out by wheel barrow
- instrumentation
- shovel
- coolers (2-3)
-
- 2
- Program
Tasks:
- Put up tripod
- grab 4 pieces of trail mat from the NGEE conex
- set up tripod with
Additional Maintenance:
- Self-tapping screws for precip lids
- proper pipe for snow stands from 2012 install
- replace transducers in SR50As -- 7 pcs
- duct seal remaining holes in the enclosures
To purchase:
- Solar Panel
- Charge controller?
- Additional CSI stuff
- SR50A transducers
- cross arm brackets
- 1 inch aluminum cross arm (for Bill stock and D site)
- duct seal
- Fresh Desiccant for all sites
To Prep:
- wire up data logger box
Bring Survey GPS north