Line 7: | Line 7: | ||
* 5 Temperature Probes (1.5m depth) | * 5 Temperature Probes (1.5m depth) | ||
* Possibly one soil pit (soil & water conditions depending) | * Possibly one soil pit (soil & water conditions depending) | ||
− | * Air Temperature / Relative Humidity @ 1.5 meters | + | * Air Temperature / Relative Humidity @ 1.5 meters & 3.5 meters |
− | * Snow Depth @ 1.5 meters | + | * Snow Depth @ 2 meters |
− | * | + | * Net Radiation @ 1.5 meters |
+ | * wind speed @ 1.5 meters | ||
+ | * ws/wd @ 3.4 meters | ||
+ | ** do I have nurail for this? | ||
===Additional Site Work:=== | ===Additional Site Work:=== | ||
Line 18: | Line 21: | ||
* small enclosure & extra logger/MD485 for C site bonus thermal conductivity sensors | * small enclosure & extra logger/MD485 for C site bonus thermal conductivity sensors | ||
* sledge tower feet | * sledge tower feet | ||
+ | * remove net radiometer heater wires where they're connected so we just have the fan on. I guess I go back and forth on this... I really should be logging the on/off toggle of the power for these. | ||
+ | * they should also be not drawing current through the logger I suspect.... | ||
+ | * still have to measure resistance for the heater wires of the thermal conductivity probes (I remember this being difficult in June) | ||
===Additional Soil Work:=== | ===Additional Soil Work:=== | ||
* At least 2 soil pits (soil to fill two coolers) | * At least 2 soil pits (soil to fill two coolers) | ||
+ | ** outline a pit with the shovel... | ||
+ | ** gps in the location | ||
+ | ** jab saw / shovel the perimeter down to the base of the active layer | ||
+ | ** shoot for two soil samples per cooler so whatever the length of the cooler is divided by two for the length. width of the cooler for the width of the soil sample (approximately) | ||
+ | ** we will use the soil sample for hydraulic conductivity testing and retain a sample for soil moisture curve work. | ||
===To Purchase:=== | ===To Purchase:=== | ||
− | + | '''[Moved to Agenda area]''' | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
===Odd Tools:=== | ===Odd Tools:=== | ||
Line 40: | Line 42: | ||
* tool bags | * tool bags | ||
* pipe wrench | * pipe wrench | ||
− | * drill for precip bucket screws | + | * cordless drill for precip bucket screws |
* an additional wheelbarrow? | * an additional wheelbarrow? | ||
* 2 coolers | * 2 coolers | ||
* GPS system | * GPS system | ||
+ | |||
+ | === Tools we'll need up there | ||
+ | * shovels | ||
+ | * sledge hammer | ||
+ | * | ||
===Other=== | ===Other=== | ||
Finalize Program Wiring (thermistor vs. thermocouple for the thermal conductivity probes) | Finalize Program Wiring (thermistor vs. thermocouple for the thermal conductivity probes) | ||
Line 63: | Line 70: | ||
* | * | ||
* Program | * Program | ||
+ | ** 'thermal conductivity with thermistor.cr1' | ||
===Tasks:=== | ===Tasks:=== | ||
Line 76: | Line 84: | ||
===To purchase:=== | ===To purchase:=== | ||
− | * Solar Panel | + | * XX Solar Panel |
* Charge controller? | * Charge controller? | ||
− | * Additional CSI stuff | + | * XX Additional CSI stuff |
− | ** SR50A transducers | + | ** XX SR50A transducers |
− | ** cross arm brackets | + | ** XX cross arm brackets |
* 1 inch aluminum cross arm (for Bill stock and D site) | * 1 inch aluminum cross arm (for Bill stock and D site) | ||
* duct seal | * duct seal | ||
Line 96: | Line 104: | ||
* crimp connectors for batteries | * crimp connectors for batteries | ||
* extension cord for solar panel & battery leads | * extension cord for solar panel & battery leads | ||
+ | * strip wires for thermal conductivity probes | ||
* | * | ||
Revision as of 14:02, 15 August 2013
Contents
Goals:
- Install Barrow Site D Inventory
- Soil Cores
Site D Install Instrumentation List:
- 5 Temperature Probes (1.5m depth)
- Possibly one soil pit (soil & water conditions depending)
- Air Temperature / Relative Humidity @ 1.5 meters & 3.5 meters
- Snow Depth @ 2 meters
- Net Radiation @ 1.5 meters
- wind speed @ 1.5 meters
- ws/wd @ 3.4 meters
- do I have nurail for this?
Additional Site Work:
- Level Radiometers at the other sites
- Change out the SR50A snow transducers for the existing stations (7pcs)
- Change out the pipe for the snow stands (4 pcs)
- Cable Extensions for Thermal Conductivity sensors @ C site
- small enclosure & extra logger/MD485 for C site bonus thermal conductivity sensors
- sledge tower feet
- remove net radiometer heater wires where they're connected so we just have the fan on. I guess I go back and forth on this... I really should be logging the on/off toggle of the power for these.
- they should also be not drawing current through the logger I suspect....
- still have to measure resistance for the heater wires of the thermal conductivity probes (I remember this being difficult in June)
Additional Soil Work:
- At least 2 soil pits (soil to fill two coolers)
- outline a pit with the shovel...
- gps in the location
- jab saw / shovel the perimeter down to the base of the active layer
- shoot for two soil samples per cooler so whatever the length of the cooler is divided by two for the length. width of the cooler for the width of the soil sample (approximately)
- we will use the soil sample for hydraulic conductivity testing and retain a sample for soil moisture curve work.
To Purchase:
[Moved to Agenda area]
Odd Tools:
- Laptop
- serial cable
- laptop weather resistant housing
- tool bags
- pipe wrench
- cordless drill for precip bucket screws
- an additional wheelbarrow?
- 2 coolers
- GPS system
=== Tools we'll need up there
- shovels
- sledge hammer
Other
Finalize Program Wiring (thermistor vs. thermocouple for the thermal conductivity probes)
Itinerary:
8/19 Bill, Vlad, Bob Busey & Bob Bolton fly out
- Pick up gear and get ready to haul it out:
- tower
- batteries
- battery box
- solar panel
- sledge tower feet
- haul stuff out by wheel barrow
- instrumentation
- shovel
- coolers (2-3)
-
- 2
- Program
- 'thermal conductivity with thermistor.cr1'
Tasks:
- Put up tripod
- grab 4 pieces of trail mat from the NGEE conex
- set up tripod with
Additional Maintenance:
- Self-tapping screws for precip lids
- proper pipe for snow stands from 2012 install
- replace transducers in SR50As -- 7 pcs
- duct seal remaining holes in the enclosures
To purchase:
- XX Solar Panel
- Charge controller?
- XX Additional CSI stuff
- XX SR50A transducers
- XX cross arm brackets
- 1 inch aluminum cross arm (for Bill stock and D site)
- duct seal
- Fresh Desiccant for all sites
To Prep:
- wire up data logger box
- drill 3 inch hole for pipe
- mount the logger
- run wires to the multiplexers and current module.
- power and ground and control for soil moisture pits
- change the ID on the SR50A
- Mount hardware in the box
- crimp connectors for batteries
- extension cord for solar panel & battery leads
- strip wires for thermal conductivity probes
Soil Component:
- Bob, Bob
- Use RTK GPS for coordinates of the pits
- pull a sled out with a cooler in it.