Difference between revisions of "August 2014 Barrow"
Jump to navigation
Jump to search
Line 7: | Line 7: | ||
* D Thermal Conductivity | * D Thermal Conductivity | ||
** Program works fine in Fairbanks | ** Program works fine in Fairbanks | ||
− | * | + | ** OKAY... Look at how it is wired in the field. / in pictures. I think there are two pulse port instructions when there should be just one. |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | * OKAY... Look at how it is wired in the field. / in pictures. I think there are two pulse port instructions when there should be just one | ||
− | |||
To Bring: | To Bring: | ||
* CNR4 Net Radiometers | * CNR4 Net Radiometers | ||
** One for B (the original) | ** One for B (the original) | ||
− | ** retap the D screws and if I can't get that to work then move the alternate radiometer from inventory to D. | + | ** retap the D screws and if I can't get that to work then move the alternate radiometer from inventory (B) to D. |
Line 33: | Line 19: | ||
Return Friday night @ 12:21 AM | Return Friday night @ 12:21 AM | ||
− | Thursday | + | ===Thursday=== |
+ | * @ airport by 6ish | ||
* grab coke in Fairbanks airport | * grab coke in Fairbanks airport | ||
* Arrive at NARL around 11am | * Arrive at NARL around 11am | ||
Line 40: | Line 27: | ||
** backpack ready to go | ** backpack ready to go | ||
** lunch for the day | ** lunch for the day | ||
− | ** Water bottle | + | ** Water bottle, fill it |
− | |||
** actionpacker with: | ** actionpacker with: | ||
*** 8 snow sensors | *** 8 snow sensors | ||
Line 49: | Line 35: | ||
*** 6/32 screw for D | *** 6/32 screw for D | ||
*** also bringing a 4/32 screw & tap for backup. | *** also bringing a 4/32 screw & tap for backup. | ||
+ | *** serial cable | ||
− | + | ===At each site=== | |
− | * | + | * level radiometer |
− | ** | + | * level precip bucket |
− | ** | + | * look at leveling tower / anemomemters |
− | * | + | * listen to anemometers for bearing problems |
− | * | + | * swap out desiccant in the box |
+ | * might double-check serial numbers if there is time | ||
+ | * more pictures | ||
+ | |||
+ | ===Additionally=== | ||
+ | * At B swap back in original radiometer | ||
+ | * At C fix the Rim snow sensor | ||
+ | * At D change out the desiccant in the radiometer |
Revision as of 21:58, 20 August 2014
To Do:
- Change out snow transducers, 8 pieces
- swap back the B site net radiometer
- change out desiccant in the D site radiometer
- level radiometers
- Fix C site Rim Snow Sensor
- D Thermal Conductivity
- Program works fine in Fairbanks
- OKAY... Look at how it is wired in the field. / in pictures. I think there are two pulse port instructions when there should be just one.
To Bring:
- CNR4 Net Radiometers
- One for B (the original)
- retap the D screws and if I can't get that to work then move the alternate radiometer from inventory (B) to D.
Plan:
Code: FDVIBG
Depart Thursday morning @ 7:40am
Return Friday night @ 12:21 AM
Thursday
- @ airport by 6ish
- grab coke in Fairbanks airport
- Arrive at NARL around 11am
- get keys and dress for day in field
- wind breaker
- backpack ready to go
- lunch for the day
- Water bottle, fill it
- actionpacker with:
- 8 snow sensors
- toolbag
- net radiometer for B
- drill for tapping D radiometer if needed
- 6/32 screw for D
- also bringing a 4/32 screw & tap for backup.
- serial cable
At each site
- level radiometer
- level precip bucket
- look at leveling tower / anemomemters
- listen to anemometers for bearing problems
- swap out desiccant in the box
- might double-check serial numbers if there is time
- more pictures
Additionally
- At B swap back in original radiometer
- At C fix the Rim snow sensor
- At D change out the desiccant in the radiometer