Difference between revisions of "NGEE May 2015 Barrow"

From IARC 207 Wiki
Jump to navigation Jump to search
Line 2: Line 2:
 
* Need gear for Sina
 
* Need gear for Sina
 
* Need to find out how much cable protection is in storage... ask bryan
 
* Need to find out how much cable protection is in storage... ask bryan
 
 
 
 
 
 
 
* radio for logger
 
* radio for logger
  
Line 13: Line 7:
 
DONE * reservations for Barrow lodging  
 
DONE * reservations for Barrow lodging  
 
DONE * send program snippet to Sina for soil moisture probes
 
DONE * send program snippet to Sina for soil moisture probes
* reservations for air travel  
+
DONE * reservations for air travel  
 
* we will fly in on the evening of the 11th
 
* we will fly in on the evening of the 11th
  
Line 36: Line 30:
 
* Put together program for Sina
 
* Put together program for Sina
  
 +
====To Bring on plane:===
 +
* Tools
 +
* Trimble
 +
*
  
====Supplies to bring / air cargo:====
+
====Supplies to Ship NAC:====
* Duct Seal for instrument box
 
 
* tower sections
 
* tower sections
 
* anchor sections
 
* anchor sections
 
* screed stakes
 
* screed stakes
 +
* survey tripod
 +
* survey rod
 
* gin pole
 
* gin pole
 +
* radiation cross arm
 +
* camera cross arm
 +
* Sledge Hammer
 +
 +
==== Supplies to ship either NAC or AK Air ====
 +
* Instrument Box
 +
*
 +
* Duct Seal for instrument box
 
* rope for gin pole
 
* rope for gin pole
 
* instrument box for data logger (sounds like small is fine)
 
* instrument box for data logger (sounds like small is fine)
 
* camera cross arm
 
* camera cross arm
 
* IR camera cross arm
 
* IR camera cross arm
* radiation cross arm
+
 
* extension cord for power from tram
+
In office / storage yet:
* soil moisture probes
+
** extension cord for power from tram
* switch 12 volt deal for soil moisture probes
+
** extension cord for power to strobe
 +
** soil moisture probes
 +
** switch 12 volt deal for soil moisture probes
 +
** lg actionpacker or two
  
 
Tools:
 
Tools:
Line 59: Line 69:
 
* 7/16* wrench (for ubolts)
 
* 7/16* wrench (for ubolts)
 
* a full set of nut drivers  
 
* a full set of nut drivers  
 +
* electrical tape
 +
* 8pcs wire nuts
 
*  
 
*  
  
  
 
To purchase yet:
 
To purchase yet:
* rope for gin pole
+
* 60 ft rope for gin pole
 
* electrical outlet inside the box?
 
* electrical outlet inside the box?
 
** 4 gang
 
** 4 gang
 +
** also another outlet
 +
** faceplate for outlets
 
* liquid-tite and hose clamps for strobe
 
* liquid-tite and hose clamps for strobe
 
* flex conduit for power cord from tram
 
* flex conduit for power cord from tram
 +
* flex for power to strobe
 
* 2" - 5/16" bolt x 4 pcs (mid tower / upper tower sections junction
 
* 2" - 5/16" bolt x 4 pcs (mid tower / upper tower sections junction
 
* 1.5" - 5/16" bolt x 4 pcs (lower tower / mid tower sections junction)
 
* 1.5" - 5/16" bolt x 4 pcs (lower tower / mid tower sections junction)
 
* maybe 3/4" conduit for strobe... this will go in the center pole section
 
* maybe 3/4" conduit for strobe... this will go in the center pole section
* purchase guy wires (3/16")... how much
+
* purchase guy wires (3/16")... how much ... 6pcs x 40 ft
* 3 more screed stakes (for base)
 
 
* expanding hole drill bit to open unistrut channels open a bit wider for the screed stakes
 
* expanding hole drill bit to open unistrut channels open a bit wider for the screed stakes
*
 
* 2 pins (for base)
 
 
* cable protection for power (if not in the storage)
 
* cable protection for power (if not in the storage)
 +
* something to keep the unistrut from popping off the screed stakes
 +
* reflector tape @ Lowes

Revision as of 12:44, 5 May 2015

As to the Barrow trip:

  • Need gear for Sina
  • Need to find out how much cable protection is in storage... ask bryan
  • radio for logger

Done list

DONE * reservations for Barrow lodging DONE * send program snippet to Sina for soil moisture probes DONE * reservations for air travel

  • we will fly in on the evening of the 11th


To do items it'd be nice if Bryan could look into once in Barrow:

  • identify conduit supply in storage


Rough Schdeule:

  • fly up the 11th, arrive in the evening
  • morning of the 12th, one person puts the base together at NARL
  • in barrow grab a piece of trail mat to put under the tower
  • two people head out to BEO to site tower and shovel snow
  • use gps to site tower and guy points (so as to miss frozen LCP etc)
  • third person brings tower and anchor to cake eater pull off
  • afternoon of the 12th: tower is raised
  • once we see how easy it is to lift we'll know how many people it takes to lift and drop

To Do:

  • Purchase request for freight
  • load high res imagery onto GPS so we can hit our points in the field
  • Put together program for Sina

=To Bring on plane:

  • Tools
  • Trimble

Supplies to Ship NAC:

  • tower sections
  • anchor sections
  • screed stakes
  • survey tripod
  • survey rod
  • gin pole
  • radiation cross arm
  • camera cross arm
  • Sledge Hammer

Supplies to ship either NAC or AK Air

  • Instrument Box
  • Duct Seal for instrument box
  • rope for gin pole
  • instrument box for data logger (sounds like small is fine)
  • camera cross arm
  • IR camera cross arm

In office / storage yet:

    • extension cord for power from tram
    • extension cord for power to strobe
    • soil moisture probes
    • switch 12 volt deal for soil moisture probes
    • lg actionpacker or two

Tools:

  • 2 pcs 3/4 inch wrench (for unistrut bolts)
  • level
  • tape measure
  • 1/2" wrench (for ubolts)
  • 7/16* wrench (for ubolts)
  • a full set of nut drivers
  • electrical tape
  • 8pcs wire nuts


To purchase yet:

  • 60 ft rope for gin pole
  • electrical outlet inside the box?
    • 4 gang
    • also another outlet
    • faceplate for outlets
  • liquid-tite and hose clamps for strobe
  • flex conduit for power cord from tram
  • flex for power to strobe
  • 2" - 5/16" bolt x 4 pcs (mid tower / upper tower sections junction
  • 1.5" - 5/16" bolt x 4 pcs (lower tower / mid tower sections junction)
  • maybe 3/4" conduit for strobe... this will go in the center pole section
  • purchase guy wires (3/16")... how much ... 6pcs x 40 ft
  • expanding hole drill bit to open unistrut channels open a bit wider for the screed stakes
  • cable protection for power (if not in the storage)
  • something to keep the unistrut from popping off the screed stakes
  • reflector tape @ Lowes