Difference between revisions of "NGEE September 2015 Barrow"
Jump to navigation
Jump to search
(Created page with "Barrow trip: * fly up * survey extents of camera again * take down tower * go does his work * we move tower back out to cake eater road * put batteries back at A site * batter...") |
|||
Line 1: | Line 1: | ||
Barrow trip: | Barrow trip: | ||
+ | |||
+ | ===To Bring:=== | ||
+ | * Survey GPS | ||
+ | * Survey Rod | ||
+ | * Survey Tripod | ||
+ | * UPS | ||
+ | * | ||
+ | ===Monday=== | ||
* fly up | * fly up | ||
* survey extents of camera again | * survey extents of camera again | ||
* take down tower | * take down tower | ||
* go does his work | * go does his work | ||
+ | |||
+ | ===Tuesday=== | ||
* we move tower back out to cake eater road | * we move tower back out to cake eater road | ||
* put batteries back at A site | * put batteries back at A site | ||
* battery backup at control shed | * battery backup at control shed | ||
* replace dreamplug | * replace dreamplug | ||
+ | * visit each site and make sure they are powered correctly for on /off operation (from calling the sites it doesn't seem like they are) | ||
+ | * Ship tower back to Fairbanks | ||
+ | |||
+ | === Wednesday=== | ||
+ | * Return to Fairbanks |
Revision as of 14:46, 23 September 2015
Barrow trip:
Contents
To Bring:
- Survey GPS
- Survey Rod
- Survey Tripod
- UPS
Monday
- fly up
- survey extents of camera again
- take down tower
- go does his work
Tuesday
- we move tower back out to cake eater road
- put batteries back at A site
- battery backup at control shed
- replace dreamplug
- visit each site and make sure they are powered correctly for on /off operation (from calling the sites it doesn't seem like they are)
- Ship tower back to Fairbanks
Wednesday
- Return to Fairbanks