Difference between revisions of "NGEE September 2015 Barrow"
Jump to navigation
Jump to search
Line 30: | Line 30: | ||
=== Wednesday=== | === Wednesday=== | ||
* Return to Fairbanks | * Return to Fairbanks | ||
+ | |||
+ | |||
+ | Tools: | ||
+ | * 2 pcs 3/4 inch wrench (for unistrut bolts) | ||
+ | * level | ||
+ | * tape measure | ||
+ | * 1/2" wrench (for ubolts) | ||
+ | * 7/16* wrench (for ubolts) | ||
+ | * a full set of nut drivers | ||
+ | * electrical tape | ||
+ | * 8pcs wire nuts | ||
+ | * |
Revision as of 14:30, 26 September 2015
NGEE Barrow trip:
Contents
To Bring:
- Survey GPS
- Survey Rod
- Survey Tripod
- UPS
Monday
- fly up
- survey extents of camera again
- survey rod & gps
- maybe bring up a water boiler and a flat pack water container.
- take down tower
- large wrench for unistrut fittings
- 1/2", 7/16", 5/16" nut drivers etc
- screw drivers
- Go does his work
Tuesday
- we move tower back out to cake eater road
- put batteries back at A site
- battery backup at control shed
- replace dreamplug
- visit each site and make sure they are powered correctly for on /off operation (from calling the sites it doesn't seem like they are)
- Ship tower back to Fairbanks
Wednesday
- Return to Fairbanks
Tools:
- 2 pcs 3/4 inch wrench (for unistrut bolts)
- level
- tape measure
- 1/2" wrench (for ubolts)
- 7/16* wrench (for ubolts)
- a full set of nut drivers
- electrical tape
- 8pcs wire nuts