Difference between revisions of "NGEE September 2015 Barrow"

From IARC 207 Wiki
Jump to navigation Jump to search
 
Line 1: Line 1:
[[NGEE]]
+
[[NGEE]]<br>
 +
[[NGEE May 2015 Barrow]]<br>
 
Barrow trip:
 
Barrow trip:
  
Line 7: Line 8:
 
* Survey Tripod
 
* Survey Tripod
 
* UPS
 
* UPS
*  
+
* dreamplug
 +
 
 
===Monday===
 
===Monday===
 
* fly up
 
* fly up
Line 14: Line 16:
 
** maybe bring up a water boiler and a flat pack water container.
 
** maybe bring up a water boiler and a flat pack water container.
 
* take down tower
 
* take down tower
** large wrench for unistrut fittings
+
** (see tool list down below from tower setup)
** 1/2", 7/16", 5/16" nut drivers etc
 
** screw drivers
 
**
 
 
* Go does his work
 
* Go does his work
  

Latest revision as of 14:46, 26 September 2015

NGEE
NGEE May 2015 Barrow
Barrow trip:

To Bring:

  • Survey GPS
  • Survey Rod
  • Survey Tripod
  • UPS
  • dreamplug

Monday

  • fly up
  • survey extents of camera again
    • survey rod & gps
    • maybe bring up a water boiler and a flat pack water container.
  • take down tower
    • (see tool list down below from tower setup)
  • Go does his work

Tuesday

  • we move tower back out to cake eater road
  • put batteries back at A site
  • battery backup at control shed
  • replace dreamplug
  • visit each site and make sure they are powered correctly for on /off operation (from calling the sites it doesn't seem like they are)
  • Ship tower back to Fairbanks

Wednesday

  • Return to Fairbanks


Tools:

  • 2 pcs 3/4 inch wrench (for unistrut bolts)
  • level
  • tape measure
  • 1/2" wrench (for ubolts)
  • 7/16* wrench (for ubolts)
  • a full set of nut drivers
  • electrical tape
  • 8pcs wire nuts