Difference between revisions of "Spring 2016 site visit"

From IARC 207 Wiki
Jump to navigation Jump to search
Line 17: Line 17:
 
*swap out HMP155s
 
*swap out HMP155s
 
*swap out quantum sensors
 
*swap out quantum sensors
 +
**figure out what the connection is like at toolik
 +
**change calibration constant?
 
*download garden cam images
 
*download garden cam images
 
*we zero out the CMP6, but not the CNR4. reconsider?
 
*we zero out the CMP6, but not the CNR4. reconsider?

Revision as of 10:18, 19 April 2016

  • take photos of sensors without pics on instrumentation site
  • bring measuring cup set for leveling UVA and UVB sensors
  • wire junction to split all instruments needing 12V from logger
  • get tower safety trained
  • install new evap pan
    • bring marine epoxy in case there is a leak
  • swap in fancier wind sensor
  • fill in serial numbers of all instruments/loggers on google sheet
  • calibrate tipping bucket
  • do accuracy test on Pluvio
    • received software in ftp from ott (on my fancy laptop, need to transfer to toughbook)
    • need usb cable
  • CANOE out to figure all of underwater sensors out!
    • inspect pressure transducer and change desiccant
    • figure out what is measuring temperature
    • swap underwater quantum
  • swap out HMP155s
  • swap out quantum sensors
    • figure out what the connection is like at toolik
    • change calibration constant?
  • download garden cam images
  • we zero out the CMP6, but not the CNR4. reconsider?
  • swap CNR4
    • change program calibration constants
  • To change on instrumentation website
    • pluvio is actually version 2
    • lake temp measurement
    • barometer