= Accomplishment Creek met =
 +
 
{{todo}}
 
{{todo}}
  
Line 6: Line 8:
  
 
   * some soil thermisters were installed but ''soil'' is too rocky
 
   * some soil thermisters were installed but ''soil'' is too rocky
 +
 +
= site logs =
 +
 +
* found rain gauge collector/funnel blown off to west, about 25m away in rocks
 +
** cut slot in rim of collector, used hose clamps to secure to guage
 +
 +
* installed electric fence with 4 posts, fence charger/controller (''fencer'') on a 5th post
 +
 +
* installed aluminum ''back plates'' on solar panel to protect wires
 +
 +
* tripod & radiation pole all firm & true.  Alter shield still well set, still a bit skewed.
 +
 +
* the site does have a barometer installed
 +
 +
* radiation sensor bubble level is true.  56 inches from sensor (center) to mean ground
 +
 +
* snow depth sensor 80 inches to ground, measured from ''grid'' of sensor
 +
 +
* all sensors look good
 +
 +
* instrument shelter is dry inside
 +
 +
* recommend white box to contain loose/extra wire from HMP, RM Young, and antenna cable.  (White in order to minimize heating & effect on AT sensors.)
 +
 +
* 3 soil moisture sensors in flex conduit coiled, sitting beneath solar panel
 +
** '''REMOVED TO Toolik -- NOT AT SITE!!'''

Revision as of 09:54, 3 July 2007

Accomplishment Creek met

site TODO list

  • record as-built wiring of soil sensors
  • Flex conduit as needed

NOT TODO

 * soil moisture sensors were not installed in 2006, and were removed from the site.
 * some soil thermisters were installed but soil is too rocky

site logs

  • found rain gauge collector/funnel blown off to west, about 25m away in rocks
    • cut slot in rim of collector, used hose clamps to secure to guage
  • installed electric fence with 4 posts, fence charger/controller (fencer) on a 5th post
  • installed aluminum back plates on solar panel to protect wires
  • tripod & radiation pole all firm & true. Alter shield still well set, still a bit skewed.
  • the site does have a barometer installed
  • radiation sensor bubble level is true. 56 inches from sensor (center) to mean ground
  • snow depth sensor 80 inches to ground, measured from grid of sensor
  • all sensors look good
  • instrument shelter is dry inside
  • recommend white box to contain loose/extra wire from HMP, RM Young, and antenna cable. (White in order to minimize heating & effect on AT sensors.)
  • 3 soil moisture sensors in flex conduit coiled, sitting beneath solar panel
    • REMOVED TO Toolik -- NOT AT SITE!!