| + | = Accomplishment Creek met = | ||
| + | |||
{{todo}} | {{todo}} | ||
| + | |||
| + | '''''NOT'' TODO''' | ||
| + | |||
| + | * soil moisture sensors were not installed in 2006, and were removed from the site. | ||
| + | |||
| + | * some soil thermisters were installed but ''soil'' is too rocky | ||
| + | |||
| + | = site logs = | ||
| + | == 3 Sept 2007, Ken I. == | ||
| + | |||
| + | * SR50 connector not tight, tightened | ||
| + | * Distance 200 cm to ground from SR50 grid 1' diam circle, 200, 205, 206, 205, 200 cm, changed offset to 200 and recompiled | ||
| + | * SR50M-45 S/N C4790 PROM SR50V13, SIG: 56809 | ||
| + | * Site in good shape, all components, may try to get extra cable in enclosure | ||
| + | * Wired rad/snow pole turnbuckles | ||
| + | * pulled extra cables inside instrument box to protect from critters | ||
| + | |||
| + | |||
| + | == 8 June 2007, Ken I., Dan R. == | ||
| + | |||
| + | * found rain gauge collector/funnel blown off to west, about 25m away in rocks | ||
| + | ** cut slot in rim of collector, used hose clamps to secure to guage | ||
| + | |||
| + | * installed electric fence with 4 posts, fence charger/controller (''fencer'') on a 5th post | ||
| + | |||
| + | * installed aluminum ''back plates'' on solar panel to protect wires | ||
| + | |||
| + | * tripod & radiation pole all firm & true. Alter shield still well set, still a bit skewed. | ||
| + | |||
| + | * the site does have a barometer installed | ||
| + | |||
| + | * radiation sensor bubble level is true. 56 inches from sensor (center) to mean ground | ||
| + | |||
| + | * snow depth sensor 80 inches to ground, measured from ''grid'' of sensor | ||
| + | |||
| + | * all sensors look good | ||
| + | |||
| + | * instrument shelter is dry inside | ||
| + | |||
| + | * recommend white box to contain loose/extra wire from HMP, RM Young, and antenna cable. (White in order to minimize heating & effect on AT sensors.) | ||
| + | |||
| + | * 3 soil moisture sensors in flex conduit coiled, sitting beneath solar panel | ||
| + | ** '''REMOVED TO Toolik -- NOT AT SITE!!''' | ||
Latest revision as of 11:07, 6 June 2008
Contents
Accomplishment Creek met
site TODO list
- record as-built wiring of soil sensors
- Flex conduit as needed
NOT TODO
* soil moisture sensors were not installed in 2006, and were removed from the site.
* some soil thermisters were installed but soil is too rocky
site logs
3 Sept 2007, Ken I.
- SR50 connector not tight, tightened
- Distance 200 cm to ground from SR50 grid 1' diam circle, 200, 205, 206, 205, 200 cm, changed offset to 200 and recompiled
- SR50M-45 S/N C4790 PROM SR50V13, SIG: 56809
- Site in good shape, all components, may try to get extra cable in enclosure
- Wired rad/snow pole turnbuckles
- pulled extra cables inside instrument box to protect from critters
8 June 2007, Ken I., Dan R.
- found rain gauge collector/funnel blown off to west, about 25m away in rocks
- cut slot in rim of collector, used hose clamps to secure to guage
- installed electric fence with 4 posts, fence charger/controller (fencer) on a 5th post
- installed aluminum back plates on solar panel to protect wires
- tripod & radiation pole all firm & true. Alter shield still well set, still a bit skewed.
- the site does have a barometer installed
- radiation sensor bubble level is true. 56 inches from sensor (center) to mean ground
- snow depth sensor 80 inches to ground, measured from grid of sensor
- all sensors look good
- instrument shelter is dry inside
- recommend white box to contain loose/extra wire from HMP, RM Young, and antenna cable. (White in order to minimize heating & effect on AT sensors.)
- 3 soil moisture sensors in flex conduit coiled, sitting beneath solar panel
- REMOVED TO Toolik -- NOT AT SITE!!