Difference between revisions of "NGEE Nome April 2016 pt2"
Jump to navigation
Jump to search
imported>Bob (Created page with " Field Plans * First day on site set up tag line for surface water discharge measurements * Snow survey at ___ points across the watershed (still deciding) * survey water sur...") |
imported>Bob |
||
Line 7: | Line 7: | ||
* measure discharge once there is measurable flow in the creek | * measure discharge once there is measurable flow in the creek | ||
* | * | ||
+ | |||
+ | * build bridge across creek | ||
+ | * look for Bob's camera | ||
+ | * water quality sampling | ||
+ | ** gps positiong | ||
+ | ** note time of day & date |
Revision as of 08:56, 14 April 2016
Field Plans
- First day on site set up tag line for surface water discharge measurements
- Snow survey at ___ points across the watershed (still deciding)
- survey water surface daily
- measure discharge once there is measurable flow in the creek
- build bridge across creek
- look for Bob's camera
- water quality sampling
- gps positiong
- note time of day & date