Difference between revisions of "Template:Todo"
Jump to navigation
Jump to search
| Line 2: | Line 2: | ||
* record as-built wiring of soil sensors | * record as-built wiring of soil sensors | ||
| + | |||
| + | DFM2 Bear Damage (as of Spring 2008) EKY: | ||
| + | |||
| + | * Need anemometer cable, | ||
| + | * solar panel, | ||
| + | * soil profile (?), | ||
| + | * electric fencing checked, | ||
| + | * Measure distance from ground to snow sensor | ||
Revision as of 11:27, 6 June 2008
site TODO list
- record as-built wiring of soil sensors
DFM2 Bear Damage (as of Spring 2008) EKY:
* Need anemometer cable, * solar panel, * soil profile (?), * electric fencing checked, * Measure distance from ground to snow sensor