Line 5: | Line 5: | ||
* small wire snipper | * small wire snipper | ||
* flat head screw driver (medium sized) | * flat head screw driver (medium sized) | ||
− | * | + | * cable ties |
+ | * crimping tool | ||
+ | * wire trimmer | ||
+ | |||
===Extra Notes=== | ===Extra Notes=== | ||
* the cyberpower below the SS Toughbook may be at capacity. Or who knows. There was a power surge that tripped it, which brought the network down when the deal didn't come back up. | * the cyberpower below the SS Toughbook may be at capacity. Or who knows. There was a power surge that tripped it, which brought the network down when the deal didn't come back up. | ||
* something to keep an eye on. It coincided perhaps with an 8/21 visit. | * something to keep an eye on. It coincided perhaps with an 8/21 visit. | ||
− | + | * it is a recurring brown out but I'm not sure yet if it is hitting everything or just that UPS. | |
+ | * probably need an extension to reconnect the HMP power. | ||
===Activity Log=== | ===Activity Log=== | ||
− | * 8/29 | + | * 8/29 |
+ | ** re-routed all radiation sensors & temporary rewire | ||
+ | ** powered off AT/RH | ||
+ | ** the cnr4 heater/ventilators are off at the moment.... might be a good time to shorten up the cables to them, too... |
Revision as of 15:46, 29 August 2016
To Purchase in town etc
- 18-22 gauge red color spade connectors (in bulk) for power /ground terminal strips
Tools needed
- small wire snipper
- flat head screw driver (medium sized)
- cable ties
- crimping tool
- wire trimmer
Extra Notes
- the cyberpower below the SS Toughbook may be at capacity. Or who knows. There was a power surge that tripped it, which brought the network down when the deal didn't come back up.
- something to keep an eye on. It coincided perhaps with an 8/21 visit.
- it is a recurring brown out but I'm not sure yet if it is hitting everything or just that UPS.
- probably need an extension to reconnect the HMP power.
Activity Log
- 8/29
- re-routed all radiation sensors & temporary rewire
- powered off AT/RH
- the cnr4 heater/ventilators are off at the moment.... might be a good time to shorten up the cables to them, too...