Difference between revisions of "Super Site Tower"
		
		
		
		
		
		
		Jump to navigation
		Jump to search
		
				
		
		
		
		
		
		
		
	
| Line 1: | Line 1: | ||
===To Purchase in town etc===  | ===To Purchase in town etc===  | ||
* 18-22 gauge red color spade connectors (in bulk) for power /ground terminal strips  | * 18-22 gauge red color spade connectors (in bulk) for power /ground terminal strips  | ||
| + | * 4 x 8 x 8, 2 pcs for base  | ||
===Tools needed===  | ===Tools needed===  | ||
| Line 8: | Line 9: | ||
* crimping tool  | * crimping tool  | ||
* wire trimmer  | * wire trimmer  | ||
| − | + | * measuring tape  | |
===Extra Notes===  | ===Extra Notes===  | ||
| Line 20: | Line 21: | ||
** powered off AT/RH  | ** powered off AT/RH  | ||
** the cnr4 heater/ventilators are off at the moment.... might be a good time to shorten up the cables to them, too...  | ** the cnr4 heater/ventilators are off at the moment.... might be a good time to shorten up the cables to them, too...  | ||
| + | * 9/1  | ||
| + | ** re-routed at/rh  | ||
| + | ** hauled out bulk of tower clamps & related hardware  | ||
Revision as of 17:23, 1 September 2016
To Purchase in town etc
- 18-22 gauge red color spade connectors (in bulk) for power /ground terminal strips
 - 4 x 8 x 8, 2 pcs for base
 
Tools needed
- small wire snipper
 - flat head screw driver (medium sized)
 - cable ties
 - crimping tool
 - wire trimmer
 - measuring tape
 
Extra Notes
- the cyberpower below the SS Toughbook may be at capacity. Or who knows. There was a power surge that tripped it, which brought the network down when the deal didn't come back up.
 - something to keep an eye on. It coincided perhaps with an 8/21 visit.
 - it is a recurring brown out but I'm not sure yet if it is hitting everything or just that UPS.
 - probably need an extension to reconnect the HMP power.
 
Activity Log
- 8/29
- re-routed all radiation sensors & temporary rewire
 - powered off AT/RH
 - the cnr4 heater/ventilators are off at the moment.... might be a good time to shorten up the cables to them, too...
 
 - 9/1
- re-routed at/rh
 - hauled out bulk of tower clamps & related hardware