Difference between revisions of "Super Site Tower"
		
		
		
		
		
		
		Jump to navigation
		Jump to search
		
				
		
		
		
		
		
		
		
	
| Line 10: | Line 10: | ||
* wire trimmer  | * wire trimmer  | ||
* measuring tape  | * measuring tape  | ||
| + | |||
| + | ====Bolting hardware====  | ||
| + | * 9/16" Wrench & nut driver / socket  | ||
| + | * tool belt, small  | ||
| + | *   | ||
===Extra Notes===  | ===Extra Notes===  | ||
| Line 16: | Line 21: | ||
* it is a recurring brown out but I'm not sure yet if it is hitting everything or just that UPS.  | * it is a recurring brown out but I'm not sure yet if it is hitting everything or just that UPS.  | ||
* probably need an extension to reconnect the HMP power.  | * probably need an extension to reconnect the HMP power.  | ||
| + | |||
| + | |||
===Activity Log===  | ===Activity Log===  | ||
* 8/29    | * 8/29    | ||
| Line 24: | Line 31: | ||
** re-routed at/rh  | ** re-routed at/rh  | ||
** hauled out bulk of tower clamps & related hardware  | ** hauled out bulk of tower clamps & related hardware  | ||
| + | * 9/18-9/28  | ||
| + | ** tracking down pipe & vehicles  | ||
| + | ** fleshing out the procedure  | ||
Revision as of 12:18, 28 September 2016
To Purchase in town etc
- 18-22 gauge red color spade connectors (in bulk) for power /ground terminal strips
 - 4 x 8 x 8, 2 pcs for base
 
Tools needed
- small wire snipper
 - flat head screw driver (medium sized)
 - cable ties
 - crimping tool
 - wire trimmer
 - measuring tape
 
Bolting hardware
- 9/16" Wrench & nut driver / socket
 - tool belt, small
 
Extra Notes
- the cyberpower below the SS Toughbook may be at capacity. Or who knows. There was a power surge that tripped it, which brought the network down when the deal didn't come back up.
 - something to keep an eye on. It coincided perhaps with an 8/21 visit.
 - it is a recurring brown out but I'm not sure yet if it is hitting everything or just that UPS.
 - probably need an extension to reconnect the HMP power.
 
Activity Log
- 8/29
- re-routed all radiation sensors & temporary rewire
 - powered off AT/RH
 - the cnr4 heater/ventilators are off at the moment.... might be a good time to shorten up the cables to them, too...
 
 - 9/1
- re-routed at/rh
 - hauled out bulk of tower clamps & related hardware
 
 - 9/18-9/28
- tracking down pipe & vehicles
 - fleshing out the procedure