Difference between revisions of "Template:Todo"

From IARC 207 Wiki
Jump to navigation Jump to search
 
(6 intermediate revisions by the same user not shown)
Line 2: Line 2:
  
 
* record as-built wiring of soil sensors
 
* record as-built wiring of soil sensors
 
+
* Flex conduit as needed
DFM2 Bear Damage (as of Spring 2008) EKY:
 
 
 
    * Need anemometer cable,
 
    * solar panel,
 
    * soil profile (?),
 
    * electric fencing checked,
 
    * Measure distance from ground to snow sensor
 

Latest revision as of 12:01, 6 June 2008

site TODO list

  • record as-built wiring of soil sensors
  • Flex conduit as needed