| + | = Ribdon River met = | ||
| + | |||
{{todo}} | {{todo}} | ||
* fix solar panel problem | * fix solar panel problem | ||
| + | |||
| + | = site logs = | ||
| + | |||
| + | == 10 June 2007, Ken I., Dan R. == | ||
| + | |||
| + | * installed HMP45C-L45', s/n Z4750068 | ||
| + | ** (could be replaced with sensor with 5-foot cable...) | ||
| + | |||
| + | * installed GW-YSI 3-AT sensor, tag# ATB5_DAR2 | ||
| + | |||
| + | * installed flex conduit on all wires | ||
| + | |||
| + | * ''bridged'' solar shields (2) w/ copper rod (available mat'ls :) to try to strengthen setup. Both had been bent down & back before we got to site. | ||
| + | |||
| + | * installed electric fence | ||
Revision as of 10:19, 3 July 2007
Ribdon River met
site TODO list
- record as-built wiring of soil sensors
- Flex conduit as needed
- fix solar panel problem
site logs
10 June 2007, Ken I., Dan R.
- installed HMP45C-L45', s/n Z4750068
- (could be replaced with sensor with 5-foot cable...)
- installed GW-YSI 3-AT sensor, tag# ATB5_DAR2
- installed flex conduit on all wires
- bridged solar shields (2) w/ copper rod (available mat'ls :) to try to strengthen setup. Both had been bent down & back before we got to site.
- installed electric fence