Difference between revisions of "Teller Lower Station"
Jump to navigation
Jump to search
Line 3: | Line 3: | ||
===To Bring:=== | ===To Bring:=== | ||
* Put the 3m tripod built from tripod kit here. (The heaviest steel tripod, blue tape on it) | * Put the 3m tripod built from tripod kit here. (The heaviest steel tripod, blue tape on it) | ||
+ | * vertical mast will be 10 foot 1.5" schedule 40 pipe with 1.5 to 1" coupler on top. | ||
+ | * primary instrument box will be mounted at about 1 meter above the ground surface | ||
+ | * secondary instrument box will be mounted below it. | ||
+ | * solar panel will be mounted above primary instrument box and face south. | ||
+ | * cross arm | ||
* Battery box in basement needs holes cut for 1/2" liquid-tite (ship battery box filled with instruments | * Battery box in basement needs holes cut for 1/2" liquid-tite (ship battery box filled with instruments | ||
− | * Instrument box with 1 CR1000 and AM416 is on site | + | * Instrument box with 1 CR1000 and AM416 is on site in the shrubs with |
* Bring a second instrument box with 1 AM16/32 for met instruments. | * Bring a second instrument box with 1 AM16/32 for met instruments. | ||
Line 37: | Line 42: | ||
* cable ties & hose clamps for securing cabling to tripod | * cable ties & hose clamps for securing cabling to tripod | ||
* VATP 1504 - see email for thermistor calibration offsets | * VATP 1504 - see email for thermistor calibration offsets | ||
+ | |||
+ | ====Sensor Heights==== | ||
+ | * Anemometer @ top of tripod / ~3 meters | ||
+ | * HMP155 @ 1.5m above ground surface | ||
+ | * Barometric Pressure - in instrument box | ||
+ | * Net Radiation - | ||
+ | * Snow Temperature profile -- ground surface in the shrubs | ||
+ | * Snow Depth 1 -- 2m on cross arm off station | ||
+ | * Snow Depth 2 -- in shrubs on a stand. | ||
Revision as of 15:56, 6 August 2016
Tape Color is BLUE
Contents
To Bring:
- Put the 3m tripod built from tripod kit here. (The heaviest steel tripod, blue tape on it)
- vertical mast will be 10 foot 1.5" schedule 40 pipe with 1.5 to 1" coupler on top.
- primary instrument box will be mounted at about 1 meter above the ground surface
- secondary instrument box will be mounted below it.
- solar panel will be mounted above primary instrument box and face south.
- cross arm
- Battery box in basement needs holes cut for 1/2" liquid-tite (ship battery box filled with instruments
- Instrument box with 1 CR1000 and AM416 is on site in the shrubs with
- Bring a second instrument box with 1 AM16/32 for met instruments.
Outstanding Tripod items
- Cross arm support brackets and such
- mount am16/32 to second instrument box
- send instruments & battery box on second freight run
- Stabilizer for net radiometer support arm.
- used cross arm brackets last time... need to dig them out and make sure we have enough.
- also could use ubolts and unistrut.
Cross Arms
- Net Radiometer skin temperature
- need to track down unistrut & strut clamps for stabilization (or ubolts)
- small cross arm for air temperature
- RM Young should mount to top without issue.
- Precip stand is already out there
- Need to figure out where NDVI sensors point. & do we have all supplies for that...
Sensors
To Bring:
- 015103 WS/WD
- Make up cable for it
- CR200 for measuring Pressure Transducers
- 5 pcs VITEL Hydraprobe II
- Need to set IDs
- 4 pcs East30 sensors thermal conductivity or specific heat
- also interface board
- also measure the heater resistance of each
- Cable protection
- cable ties & hose clamps for securing cabling to tripod
- VATP 1504 - see email for thermistor calibration offsets
Sensor Heights
- Anemometer @ top of tripod / ~3 meters
- HMP155 @ 1.5m above ground surface
- Barometric Pressure - in instrument box
- Net Radiation -
- Snow Temperature profile -- ground surface in the shrubs
- Snow Depth 1 -- 2m on cross arm off station
- Snow Depth 2 -- in shrubs on a stand.
Already at site:
- HMP155
- thinking about bringing out a replacement temperature head though because the one in place has been on the fritz over the summer.
- TE525MM
- CNR4 w/bracket
- Two Batteries
- Solar Panel
- Charge Controller
Extras
- need to yet sort out how Met AM16/32 will attach
- need to drill out second instrument box so that cables can enter.
- Need to permanentify the solar panel
- bring solar panel from Fairbanks and but need to make a mount for it yet.
- Measure East30 sensor resistance
- label all subsurface sensors
- Need to survey in all instruments with GPS
- Reuse batteries that are already out here, no new batteries needed.
- think about how to mount iridium here...
To Ship:
- Tripod
Installation Guidance:
- Unpack Tripod
- Mast