===To Bring:=== | ===To Bring:=== | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | ===Outstanding | + | ===Outstanding Items=== |
− | * | + | * Make Discharge Measurement |
− | * | + | * Need to bring out |
− | + | * 1" Al pipe for away from tripod snow stand... can skinny pipe be made to work? | |
− | * | + | * Declination is 11 degrees... need to correct this using datapro function. |
− | * | + | * XX use battery box tarp to flop soil pit lid onto. |
− | ** | + | * camera power |
+ | * XX terminal strips for SDI 12 devices. | ||
+ | * XX 1"x1ft stub for net radiation | ||
+ | * XX guy wires for snow stand | ||
+ | * mount camera | ||
+ | * fix program problems: | ||
+ | ** Resistor logging | ||
+ | ** soil temperature logging | ||
+ | ** check to see that east 30 sensors are good with the jumper wire in place | ||
+ | ** | ||
====Cross Arms==== | ====Cross Arms==== | ||
Line 65: | Line 65: | ||
===Extras=== | ===Extras=== | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
* think about how to mount iridium here... | * think about how to mount iridium here... | ||
− | + | *Bring covers from Fairbanks to cover unitstrut ends like tennis balls. | |
− | |||
− | * | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− |
Revision as of 09:59, 14 August 2016
Tape Color is BLUE
Contents
To Bring:
Outstanding Items
- Make Discharge Measurement
- Need to bring out
- 1" Al pipe for away from tripod snow stand... can skinny pipe be made to work?
- Declination is 11 degrees... need to correct this using datapro function.
- XX use battery box tarp to flop soil pit lid onto.
- camera power
- XX terminal strips for SDI 12 devices.
- XX 1"x1ft stub for net radiation
- XX guy wires for snow stand
- mount camera
- fix program problems:
- Resistor logging
- soil temperature logging
- check to see that east 30 sensors are good with the jumper wire in place
Cross Arms
- Net Radiometer skin temperature
- need to track down unistrut & strut clamps for stabilization (or ubolts)
- small cross arm for air temperature
- RM Young should mount to top without issue.
- Precip stand is already out there
- Need to figure out where NDVI sensors point. & do we have all supplies for that...
Sensors
To Bring:
- 015103 WS/WD
- Make up cable for it
- CR200 for measuring Pressure Transducers
- 5 pcs VITEL Hydraprobe II
- 4 pcs East30 sensors thermal conductivity or specific heat
- also interface board
- also measure the heater resistance of each
- Cable protection
- cable ties & hose clamps for securing cabling to tripod
- VATP 1504 - see email for thermistor calibration offsets
Sensor Heights
- Anemometer @ top of tripod / ~3 meters
- HMP155 @ 1.5m above ground surface
- Barometric Pressure - in instrument box
- Net Radiation -
- Snow Temperature profile -- ground surface in the shrubs
- Snow Depth 1 -- 2m on cross arm off station
- Snow Depth 2 -- in shrubs on a stand.
Already at site:
- HMP155
- thinking about bringing out a replacement temperature head though because the one in place has been on the fritz over the summer.
- TE525MM
- CNR4 w/bracket
- Two Batteries
- Solar Panel
- Charge Controller
Extras
- think about how to mount iridium here...
- Bring covers from Fairbanks to cover unitstrut ends like tennis balls.