Difference between revisions of "Dfm2"
Jump to navigation
Jump to search
imported>Ken |
(No difference)
|
Revision as of 11:03, 3 July 2007
White Hills met
site TODO list
- record as-built wiring of soil sensors
- Flex conduit as needed
site logs
9 June 2007, Ken I., Dan R.
- old site dismantled for later removal:
- battery box: about 220 pounds, including 3 batteries
- tower/stand: about 100 pounds
- solar panel REMOVED
- electric fence put up using 4 posts