Difference between revisions of "Spring 2017 visit"
Jump to navigation
Jump to search
Line 17: | Line 17: | ||
*think about soil temps- at least find them | *think about soil temps- at least find them | ||
*install BF5 sensor | *install BF5 sensor | ||
− | ** tripod is | + | ** tripod is 9ft7in from tower. cable is 5m. so this ''should'' work out |
Revision as of 15:24, 18 May 2017
- Check out the status of the heater wiring for CNR4
- is it even wired? to which ports?
- change the program notes if wired
- change program controls for heater
- bring up couple SW12V
- change desiccant in CNR4
- stabilize underwater par sensor with second string for cleaning
- add terrestrial quantum to sensor wiring notes at top of program
- check what the calconnector looks like for lake PAR.
- maybe need to buy a second one so can coordinate with calibration swaps
- its reading negative because the sensor head was swapped wrong, but this isn't an issue.
- change notes in program where measure pressure to change CS100 to CS106
- remove sea level offset
- get serial number for radios
- get height of terrestrial PAR
- check if pluvio is pointing north
- think about soil temps- at least find them
- install BF5 sensor
- tripod is 9ft7in from tower. cable is 5m. so this should work out