− | * | + | *Site had bear damage need to (as of May 2008) |
+ | **replace anemometer cable | ||
+ | **replace solar panel | ||
+ | **repair electric fence | ||
+ | **install flex conduit | ||
+ | **Check electric fence | ||
+ | * bring 2 posts, post driver, wire insulators; install posts midway in long runs | ||
+ | * secure rain gauge funnel | ||
+ | * flex conduit for antenna, other cables | ||
+ | * bring turnbuckle for N guy | ||
+ | |||
= site logs = | = site logs = | ||
+ | |||
+ | * bring 2 posts, post driver, wire insulators; install posts midway in long runs | ||
+ | * secure rain gauge funnel | ||
+ | * flex conduit for antenna, other cables | ||
+ | * bring turnbuckle for N guy | ||
+ | |||
+ | == 12 Jun 2008, Emily and Ken == | ||
+ | * Site had bear damage. Solar panel was broken, we replaced panel | ||
+ | * Soil temperature sensors ripped out of box | ||
+ | * Measured SR50 distance to ground, avg 116 cm | ||
+ | * E-fence not working, rewired e-fence and is now working | ||
+ | * added conduit (no shielding though) | ||
+ | |||
+ | |||
+ | == 17 May 2008, Bob and Jeff == | ||
+ | Note by EKY, Bob and Jeff visited this site and found extensive bear damage. Data from 4/29 through 5/17 is bad. They were able to hook up the anemometer but we need a new cable. | ||
+ | Soil sensors have been ripped out of ground. | ||
+ | |||
+ | == 28 August 2007 11:30a, Rob Gieck. == | ||
+ | (entered by E. Youcha from Rob's field book) | ||
+ | |||
+ | * looks like they took off the SR50 with SN C4801 and put on SR50 with SN 4802 | ||
+ | * took distance measurements with circle (cone) method, 2 ft out from sensor: N=117.7 cm, E=119, W=115, S=119.4 | ||
+ | * I think the HMP45C was replaced (old SN B0110036 - new SN C11430045) | ||
+ | * fence looked in place | ||
+ | |||
+ | == 13 July 2007, Ken I. == | ||
+ | |||
+ | * electric fence working; taped yellow tags near posts | ||
+ | * fence could use two more posts in middle of long runs | ||
+ | * tightened both wires on NE fence run | ||
+ | * rain gauge funnel not secured | ||
+ | * tripod looks good; guys are a little slack | ||
+ | * site could use flex conduit on tripod wires | ||
+ | * radiation pole is plumb; cables a bit slack | ||
+ | * need turnbuckle on N guy (now secured with nylon cord) | ||
+ | * snow depth sensor off plumb; fitting looks bent; straightened/bent it back, but not quite vertical | ||
+ | |||
+ | |||
== 9 June 2007, Ken I., Dan R. == | == 9 June 2007, Ken I., Dan R. == |
Latest revision as of 13:22, 31 July 2008
Contents
White Hills met
site TODO list
- record as-built wiring of soil sensors
- Flex conduit as needed
- Site had bear damage need to (as of May 2008)
- replace anemometer cable
- replace solar panel
- repair electric fence
- install flex conduit
- Check electric fence
- bring 2 posts, post driver, wire insulators; install posts midway in long runs
- secure rain gauge funnel
- flex conduit for antenna, other cables
- bring turnbuckle for N guy
site logs
- bring 2 posts, post driver, wire insulators; install posts midway in long runs
- secure rain gauge funnel
- flex conduit for antenna, other cables
- bring turnbuckle for N guy
12 Jun 2008, Emily and Ken
- Site had bear damage. Solar panel was broken, we replaced panel
- Soil temperature sensors ripped out of box
- Measured SR50 distance to ground, avg 116 cm
- E-fence not working, rewired e-fence and is now working
- added conduit (no shielding though)
17 May 2008, Bob and Jeff
Note by EKY, Bob and Jeff visited this site and found extensive bear damage. Data from 4/29 through 5/17 is bad. They were able to hook up the anemometer but we need a new cable. Soil sensors have been ripped out of ground.
28 August 2007 11:30a, Rob Gieck.
(entered by E. Youcha from Rob's field book)
- looks like they took off the SR50 with SN C4801 and put on SR50 with SN 4802
- took distance measurements with circle (cone) method, 2 ft out from sensor: N=117.7 cm, E=119, W=115, S=119.4
- I think the HMP45C was replaced (old SN B0110036 - new SN C11430045)
- fence looked in place
13 July 2007, Ken I.
- electric fence working; taped yellow tags near posts
- fence could use two more posts in middle of long runs
- tightened both wires on NE fence run
- rain gauge funnel not secured
- tripod looks good; guys are a little slack
- site could use flex conduit on tripod wires
- radiation pole is plumb; cables a bit slack
- need turnbuckle on N guy (now secured with nylon cord)
- snow depth sensor off plumb; fitting looks bent; straightened/bent it back, but not quite vertical
9 June 2007, Ken I., Dan R.
- old site dismantled for later removal:
- battery box: about 220 pounds, including 3 batteries
- tower/stand: about 100 pounds
- solar panel REMOVED
- electric fence put up using 4 posts