*Site had bear damage need to (as of May 2008)
 +
**replace anemometer cable
 +
**replace solar panel
 +
**repair electric fence
 +
**install flex conduit
 +
**Check electric fence
 +
* bring 2 posts, post driver, wire insulators; install posts midway in long runs
 +
* secure rain gauge funnel
 +
* flex conduit for antenna, other cables
 +
* bring turnbuckle for N guy
 +
  
 
= site logs =
 
= site logs =
Line 10: Line 22:
 
* bring turnbuckle for N guy
 
* bring turnbuckle for N guy
  
 +
== 12 Jun 2008, Emily and Ken ==
 +
* Site had bear damage.  Solar panel was broken, we replaced panel
 +
* Soil temperature sensors ripped out of box
 +
* Measured SR50 distance to ground, avg 116 cm
 +
* E-fence not working, rewired e-fence and is now working
 +
* added conduit (no shielding though)
 +
 +
 +
== 17 May 2008, Bob and Jeff ==
 +
Note by EKY, Bob and Jeff visited this site and found extensive bear damage.  Data from 4/29 through 5/17 is bad. They were able to hook up the anemometer but we need a new cable.
 +
Soil sensors have been ripped out of ground. 
  
== 28 August 2007 11:30a, Rob Gieck. (entered by E. Youcha from Rob's field book) ==
+
== 28 August 2007 11:30a, Rob Gieck. ==
 +
(entered by E. Youcha from Rob's field book)
  
 
* looks like they took off the SR50 with SN C4801 and put on SR50 with SN 4802
 
* looks like they took off the SR50 with SN C4801 and put on SR50 with SN 4802

Latest revision as of 13:22, 31 July 2008

White Hills met

site TODO list

  • record as-built wiring of soil sensors
  • Flex conduit as needed
  • Site had bear damage need to (as of May 2008)
    • replace anemometer cable
    • replace solar panel
    • repair electric fence
    • install flex conduit
    • Check electric fence
  • bring 2 posts, post driver, wire insulators; install posts midway in long runs
  • secure rain gauge funnel
  • flex conduit for antenna, other cables
  • bring turnbuckle for N guy


site logs

  • bring 2 posts, post driver, wire insulators; install posts midway in long runs
  • secure rain gauge funnel
  • flex conduit for antenna, other cables
  • bring turnbuckle for N guy

12 Jun 2008, Emily and Ken

  • Site had bear damage. Solar panel was broken, we replaced panel
  • Soil temperature sensors ripped out of box
  • Measured SR50 distance to ground, avg 116 cm
  • E-fence not working, rewired e-fence and is now working
  • added conduit (no shielding though)


17 May 2008, Bob and Jeff

Note by EKY, Bob and Jeff visited this site and found extensive bear damage. Data from 4/29 through 5/17 is bad. They were able to hook up the anemometer but we need a new cable. Soil sensors have been ripped out of ground.

28 August 2007 11:30a, Rob Gieck.

(entered by E. Youcha from Rob's field book)

  • looks like they took off the SR50 with SN C4801 and put on SR50 with SN 4802
  • took distance measurements with circle (cone) method, 2 ft out from sensor: N=117.7 cm, E=119, W=115, S=119.4
  • I think the HMP45C was replaced (old SN B0110036 - new SN C11430045)
  • fence looked in place

13 July 2007, Ken I.

  • electric fence working; taped yellow tags near posts
  • fence could use two more posts in middle of long runs
  • tightened both wires on NE fence run
  • rain gauge funnel not secured
  • tripod looks good; guys are a little slack
  • site could use flex conduit on tripod wires
  • radiation pole is plumb; cables a bit slack
  • need turnbuckle on N guy (now secured with nylon cord)
  • snow depth sensor off plumb; fitting looks bent; straightened/bent it back, but not quite vertical


9 June 2007, Ken I., Dan R.

  • old site dismantled for later removal:
    • battery box: about 220 pounds, including 3 batteries
    • tower/stand: about 100 pounds
    • solar panel REMOVED
  • electric fence put up using 4 posts