Difference between revisions of "2017 NGEE March Nome Trip"
Jump to navigation
Jump to search
(→3/20) |
|||
Line 33: | Line 33: | ||
====3/20==== | ====3/20==== | ||
− | * Bob Busey & LANL Crew arrive in Nome | + | * Bob Busey (Noon) & LANL Crew (Evening) arrive in Nome |
* Hotel opens @ 3pm | * Hotel opens @ 3pm | ||
* pick up stuff from cargo | * pick up stuff from cargo | ||
** gear | ** gear | ||
** safety equipment | ** safety equipment | ||
− | |||
* groceries | * groceries | ||
− | * | + | * |
+ | |||
====3/21==== | ====3/21==== | ||
* Lily Cohen & Bob Bolton arrive in Nome | * Lily Cohen & Bob Bolton arrive in Nome |
Revision as of 12:59, 22 February 2017
Just a skeleton of a beginning but wanted a place to collect scraps of ideas etc.
Contents
To Do Yet
- Helicopter Safety Plan
- Renew Tracker plans for field season
- Make sure GPS systems are compatible between groups
- PR for & Ship stuff (to Nome Gnome?)
Snow Survey Gear
- 2x Thermal Conductivity Probes
- have one long sensor that still needs to be found.
- 3x Snow density tube
- 1x magnaprobe
- Lots of ziplocs
- snow scale
- short power point on snow survey techniques
- one pager for fieldbooks on what to do
- I think UAF will bring out 4 or 5 pairs of snow shoes plus one pair of skis
- sled
- small actionpacker
Cameras
- pole?
- email vicky about noodles
To Purchase yet
- ziplocs
- rebar
==
Itinerary
3/20
- Bob Busey (Noon) & LANL Crew (Evening) arrive in Nome
- Hotel opens @ 3pm
- pick up stuff from cargo
- gear
- safety equipment
- groceries
3/21
- Lily Cohen & Bob Bolton arrive in Nome
- Hotel opens @ 3pm
- get settled.
- get groceries
Survey marker trip day:
- 8am start
- 10am arrive on-site and set up survey gps system
- 10:45 snowmachine to the top of the drainage. Work down the hill deploying mark
- ~7 hrs to deploy markers for UAV/helo
- Stop sign
- rebar protection
- rebar
- evening: return to Nome.
3/22
- Begin snow surveys in Teller