Difference between revisions of "Dbr2"
Jump to navigation
Jump to search
imported>Ken |
(No difference)
|
Latest revision as of 10:20, 3 July 2007
Ribdon River repeater
site TODO list
- record as-built wiring of soil sensors
- Flex conduit as needed
site logs
10 June 2007, Ken I.
- site fly-by; site looked ok