Difference between revisions of "Barrow Summer 2017 trip"

From IARC 207 Wiki
Jump to navigation Jump to search
Line 17: Line 17:
  
 
to purchase:
 
to purchase:
*4 rebars
+
*4 or 8 1/2 in rebar
 
*pipe: I think i want a 3in pipe (based on http://www.mcnichols.com/?pageCode=pipedims)
 
*pipe: I think i want a 3in pipe (based on http://www.mcnichols.com/?pageCode=pipedims)
 
*couple extra ubolts just in case for 3in pipe
 
*couple extra ubolts just in case for 3in pipe

Revision as of 15:21, 14 July 2017

ARM

  • replace SR50a snow transducers
  • what is the deal with the LPM power connector? do I need a new one?
  • install cs107 => PROGRAM CHANGE
    • cable housing
  • mount LPM
    • baird mount
    • pipe
    • trail mat
    • cable for power and coms
    • cable housing
    • rebars(reasses this based on holes in baird mount)
    • two pieces of unistrut
    • two 3in and two 3.5in pipe clamps

to purchase:


to bring

  • sledge hammer (and maybe drill?)
  • fish tape
  • proof of driving insurrance (reservation number 7127)

for fence install

  • pipe pounder
  • ladder

NGEE

  • desiccant for cnr4
  • level cnr4
  • level tipping buckets
  • sr50a transducers