Difference between revisions of "Oliktok summer 2017 trip"
Jump to navigation
Jump to search
(3 intermediate revisions by the same user not shown) | |||
Line 10: | Line 10: | ||
**7)screw in all the little screws | **7)screw in all the little screws | ||
**8)replace the sensor on the mount and screw in the cable (which is notched) | **8)replace the sensor on the mount and screw in the cable (which is notched) | ||
+ | |||
*put up temperature sensor | *put up temperature sensor | ||
− | **mount it | + | **1)mount it on the south side of the fence |
+ | **2)plug sensor into sensor head | ||
+ | **3)screw | ||
+ | **4)zip tie cable to make things neat | ||
+ | **5)unplug logger before wiring | ||
**wiring to CR1000 logger | **wiring to CR1000 logger | ||
− | **Red -- SW-12 | + | ***Red -- SW-12 |
− | **yellow -- SE11 | + | ***yellow -- SE11 |
− | **blue -- SE12 | + | ***blue -- SE12 |
− | **clear -- AG | + | ***clear -- AG |
− | **black -- AG | + | ***black -- AG |
− | **white -- AG | + | ***white -- AG |
− | + | **replace putty | |
− | ** | + | **replace power to logger |
− | * | ||
*CFM100 | *CFM100 | ||
Line 28: | Line 32: | ||
**2)plug and screw in the CFM100 | **2)plug and screw in the CFM100 | ||
**3)re-plug power to the logger | **3)re-plug power to the logger | ||
− | **4) | + | **4)insert card |
+ | |||
*level geonor | *level geonor | ||
+ | **there are screws at the base | ||
+ | **need to remove cover to access them- and maybe bucket as well | ||
+ | **don't do this if it doesn't seem obvious | ||
+ | |||
+ | *visually inspect panes of LPM | ||
+ | **IF dirty: wipe them with a paper towel or the alcohol swabbies I sent with you | ||
*tools i'm sending you with | *tools i'm sending you with | ||
Line 35: | Line 46: | ||
**small flathead screw driver | **small flathead screw driver | ||
**small Philips screw driver | **small Philips screw driver | ||
− | + | **adjustable wrench | |
+ | **channel locks | ||
+ | |||
+ | ===other=== | ||
*antifreeze | *antifreeze | ||
− | *snip vegetation underneath | + | *<s>snip vegetation underneath |
+ | **cable housing | ||
+ | *plastic cable covers for all cables entering into the logger?</s> |
Latest revision as of 16:14, 7 September 2017
for telayna
- replace sr50a transducers
- 1)unscrew sensor from mount
- 2)unscrew cable from sensor
- 3)unscrew all little screws holding the transducer to the sensor body (use the frisbee to work so you don't lose the little screws)
- 4)unclip the wires of the old transducer, remove the O ring
- 5)place desiccant in the new transducer
- 5)place the new O ring on the sensor body and clip the new transducer wire
- 6)line up the notch of the new transducer on the sensor body
- 7)screw in all the little screws
- 8)replace the sensor on the mount and screw in the cable (which is notched)
- put up temperature sensor
- 1)mount it on the south side of the fence
- 2)plug sensor into sensor head
- 3)screw
- 4)zip tie cable to make things neat
- 5)unplug logger before wiring
- wiring to CR1000 logger
- Red -- SW-12
- yellow -- SE11
- blue -- SE12
- clear -- AG
- black -- AG
- white -- AG
- replace putty
- replace power to logger
- CFM100
- 1)unplug power from logger
- 2)plug and screw in the CFM100
- 3)re-plug power to the logger
- 4)insert card
- level geonor
- there are screws at the base
- need to remove cover to access them- and maybe bucket as well
- don't do this if it doesn't seem obvious
- visually inspect panes of LPM
- IF dirty: wipe them with a paper towel or the alcohol swabbies I sent with you
- tools i'm sending you with
- 7/16 nut driver
- small flathead screw driver
- small Philips screw driver
- adjustable wrench
- channel locks
other
- antifreeze
snip vegetation underneath- cable housing
plastic cable covers for all cables entering into the logger?